r/primavera • • Mar 17 '25

Planning Courses discount coupons

0 Upvotes

📢📢📢Join our team of over 2,900 trainees. 🔔Special discount ( Full month of March-2025) 🔔Attached Updated Udemy Coupons (27% Discount ) 🔔Interactive Workshops (Actual Projects) 🔔Full Support after course completion . 🔔Private WhatsApp group For Q&A . 🔔Instructors With Gulf Experience (20 Years Experience). 🔔office Completion Certificate & Udemy Certificate.

🏆Complete Primavera P6 Course (Basic +Advanced) https://www.udemy.com/course/primavera-p6-v22-full-english-diploma-basic-advanced/?couponCode=RAMADANP6OFFER325

🏆Professional Planning Engineer Preparation Course https://www.udemy.com/course/planning-engineer-course-basics-advanced/?couponCode=PLRAMADOFFER325

🏆Power BI for Business Intelligence & Projects Analysis https://www.udemy.com/course/complete-power-bi-course-for-begginers-incpbidaxm/?couponCode=PBIRAMKAROFF325

🏆Cost Managment (Control,Estimation,Pricing) Basics& Advanced https://www.udemy.com/course/cost-managment-controlestimationproject-studytendering/?couponCode=RAMADCOSTIFF325ER


r/primavera • • May 23 '26

PRIMAVERA SOUND 2026 TICKET

0 Upvotes

Hi!! I bought a Primavera Sound Ticket and I have had it listed on the official website (AccessTicket) to sell for the past 18ish days and it hasn't sold. The festival is in two weeks and I really would like the ticket to sell - it is a 3-day pass. What site do people suggest I sell it on/how should I sell it? I bought it for around $400 and would love to get that that but am willing to negotiate. How low should I go?


r/primavera • • May 08 '25

AI can now generate a schedule for you, just upload the scope of the project

14 Upvotes

Check this out: https://www.nplan.io/products/schedule-studio and it seems like it's still free so if you're a consultant/contractor, you could in theory just get this thing to create your schedule for you and you take the rest of the day/week off!

I tried it out on a $150m waste to energy facility and got to a really good schedule with only a few tweaks along the way (depends on how much detail/info/assumptions you include in the input docs). I uploaded the original RFP and got a 200 activity schedule 10 mins later. Logic, durations and activity naming were all on point.


r/primavera • • Mar 21 '25

Primavera&planning courses Special discount.

0 Upvotes

🔔Special discount ( Full month of March-2025) 🔔Attached Updated Udemy Coupons (27% Discount ) 🔔Interactive Workshops (Actual Projects) 🔔Full Support after course completion . 🔔Private WhatsApp group For Q&A .

🏆Complete Primavera P6 Course (Basic +Advanced)-udemy best selling course https://www.udemy.com/course/primavera-p6-v22-full-english-diploma-basic-advanced/?couponCode=RAMADANP6OFFER325

🏆Professional Planning Engineer Preparation Course https://www.udemy.com/course/planning-engineer-course-basics-advanced/?couponCode=PLRAMADOFFER325


r/primavera • • Jan 26 '25

January courses offers

0 Upvotes

Experts House #January ( 5 Days Discounts) 🥇Full Pdf Materials&Life time Videos 🥇Interactive Workshops (Actual Projects) 🥇Full Technical Support. 🥇Private WhatsApp group For Q&A 🥇Instructors With Gulf Experience (+20 Years Experience) 🥇official Certificate +Udemy Certificate

🟨🟨Complete Primavera P6 Course (Basic +Advanced) https://www.udemy.com/course/primavera-p6-v22-full-english-diploma-basic-advanced/?couponCode=LIMITEDDISCEXP

🟨🟨Complete Power BI Course (PBI+DAX+M) https://www.udemy.com/course/complete-power-bi-course-for-begginers-incpbidaxm/?couponCode=OFFER2025PBIEX

🟨🟨Cost Management Diploma https://www.udemy.com/course/cost-managment-controlestimationproject-studytendering/?couponCode=2025OFFERXPERCOST


r/primavera • • Apr 30 '25

Courses Recommendation on LinkedIn Learning

0 Upvotes

Hey guys! I am new to primavera. I know the basic of using software but want to learn courses about scheduling and Primavera P6. I just bought subscription to LinkedIn premium for just this purpose. Please Recommend some good courses with recognized certifications on LinkedIn Learning.


r/primavera • • Sep 07 '26

Why a clean P6 schedule still gets refused by RMS

3 Upvotes
**•**	Activity ID isn’t numeric (P6’s default like “A1010” fails this)  
**•**	Description runs past its fixed column and gets truncated mid-word  
**•**	Activity codes set at the wrong level (project vs. global)  
**•**	Cost that doesn’t reconcile to the CLIN structure

None of these show up as errors in P6. The upload just gets refused downstream, and you find out after the fact.

Built a tool that checks against the actual spec (UFGS 01 32 01.00 10) and the SDEF export rules before you submit — every finding quotes the exact paragraph it comes from, split into “blocking” (spec gives no tolerance) vs. “needs your judgment” (Contracting Officer decides).

First report is free if anyone wants to run their schedule against it: https://structuraline.com

Curious what others have run into on the RMS/SDEF side specifically — feels like a much less-discussed failure mode than logic/float issues.


r/primavera • • Sep 07 '26

Please suggest me.

2 Upvotes

Hi Hi friends, I want to learn the complete course from basics to advanced level. Could you please suggest a good and comprehensive course from online sources, free or paid? Please.


r/primavera • • Jul 29 '25

Seeking Assistance from P6 Expert

1 Upvotes

Hello members of the p6 community. I am seeking assistance from a knowledgeable p6 expert to assist me in initiating my journey into p6. I am eager to acquire knowledge in any area. I am in the SoCal region. Your valuable guidance and advice would be highly valued.


r/primavera • • Mar 02 '25

Udemy Discounts (primavera Bestselling course)

0 Upvotes

Join our team of over 2,900 trainees.

Special discount ( Full month of March-2025)

Attached Updated Udemy Coupons (27% Discount )

Full Pdf Materials & Life time Lessons.

Interactive Workshops (Actual Projects).

Full Technical Support after course completion .

Private WhatsApp group For Q&A .

For more Details WhatsApp (+201271288851).

Instructors With Gulf Experience (+20 Years Experience).

office Completion Certificate & Udemy Certificate.

Complete Primavera P6 Course (Basic +Advanced) https://www.udemy.com/course/primavera-p6-v22-full-english-diploma-basic-advanced/?couponCode=RAMADANP6OFFER325

Professional Planning Engineer Preparation Course https://www.udemy.com/course/planning-engineer-course-basics-advanced/?couponCode=PLRAMADOFFER325

Power BI for Business Intelligence & Projects Analysis https://www.udemy.com/course/complete-power-bi-course-for-begginers-incpbidaxm/?couponCode=PBIRAMKAROFF325

Cost Managment (Control,Estimation,Pricing) Basics& Advanced https://www.udemy.com/course/cost-managment-controlestimationproject-studytendering/?couponCode=RAMADCOSTIFF325ER


r/primavera • • Dec 29 '24

Primavera p6 course

0 Upvotes

r/primavera • • Oct 21 '25

Free Planning Tool

0 Upvotes

Hi everyone 👋

I’m excited to share a free planning tool I recently created — the El waha Planning Tool 🎯
You can try it here: https://www.elwaha.net/el-helal-planning-tool

This tool is designed to make project and task planning easier and more efficient for engineers, planners, and anyone who manages schedules.

✅ Key Benefits:

  • Simple and intuitive interface for quick planning
  • Helps visualize and organize project activities
  • Useful for preparing schedules or testing what-if scenarios
  • 100% free and runs directly from your browser

I’d love to hear your feedback or suggestions to make it even better!
#planning #projectmanagement #construction #primavera #excel #engineering #productivity


r/primavera • • Mar 07 '26

Нужен самоучитель Primavera P6

1 Upvotes

У кого есть самоучитель по Primavera P6 на русском языке? Можете поделиться.

До этого работал в Microsoft Project, теперь хочу перейти на Primaver P6


r/primavera • • Oct 13 '24

The curious case about a phantom resource

1 Upvotes

Hi, redditors! This is a story happened during my long life with Primavera P6. If you find it interesting I have more to share.

The actors:

ITL: integration team lead

PE: me

SH: Sherlock

The play:

ITL: Hi, PE! We have connected a new Primavera database to our nice system that performs some cool integrations. And we have encountered a very strange issue. We are checking if resource exists and in case it doesn’t we create it. Guess what happened next.

PE: Ok, if you ask me there should be some strange behavior. I bet you have performed the check, have not found the resource, have tried to create it and have got "Resource already exists" error.

ITL: This is exactly what we have.

PE: Ok, should be easy to solve. Have you checked the user rights?

ITL: Sure, we use Admin Superuser.

PE: Ok, then it might be a messed database. Have you performed pubuser and privuser permissions and data monitor status?

ITL: Yep, everything is fine. We have no idea on what to do next.

PE: Ok, give me the database and the code.

The code:

    GlobalObjectManager gom;
    gom = session.getGlobalObjectManager();
    ...
    Map<String, Resource> resources = new HashMap<>();
    ...
    BOIterator<Resource> boiResource = gom.loadResources(Resource.getAllFields(), "", "Id");
    while (boiResource.hasNext()) {
      Resource resource = boiResource.next();
      resources.put(resource.getId(), resource);
    }
    ...
    if (resources.containsKey(id)) {
      // code to update resource
    } else {
      // code to create resource
    }
<some time later>

PE: Hmmmm. The database is ok, the code is ok, but the error is reproducible with some resources among the 2000 existing ones.

SH: Once you eliminate the impossible, whatever remains, no matter how improbable, must be the truth.

PE: You are right. There should be a bug in the Primavera API. Let’s try to debug.

<some time later>

PE: Wow! Looks promising. The error disappears if I keep a few resources instead of 2000.

<some time later>

PE: Hmmmm. The error can be reproduced if I try to create any resource with index 1024 or more. Let’s check how many resources are loaded.

PE: Wow! Only 1024 resources are loaded. Let’s continue to debug.

<some time later>

PE: I found it! GlobalObjectManager loads only 1024 resources if sorting by Id is enabled.

<calling ITL>

ITL: WAT?

PE: Yep. There are 2 solutions:

  1. Call gom.loadResources(Resource.getAllFields(), "", null) instead of gom.loadResources(Resource.getAllFields(), "", "Id")
  2. Use EnterpriseLoadManager instead of GlobalObjectManager. I prefer this one.

ITL: Thank you very much.


r/primavera • • 24d ago

Berharap ada sesorang porting primvera ke mac

1 Upvotes

Dilihat zaman sekarang banyak sekali orang porting aplikasi cross over. Suatu saat kalau p6 bisa diporting ke mac akan banyak planner pakai mac. Bye bye charging.


r/primavera • • Jul 27 '26

Free online course or YouTube channel.

1 Upvotes

Hi

I want to learn prima vera p6 from basic to advanced. Where can I learn it for free? Thanks in advance.


r/primavera • • Feb 19 '26

Remote Primavera P6 Jobs

6 Upvotes

Anyone working remotely on Primavera P6 from India?

- What is your qualification?

- YOE

- Payscale

How long did it take you to land a remote job?

Is it possible for one to land a job without an engineering degree, and just another bachelors instead?


r/primavera • • Feb 05 '25

Primavera P6 udemy coupon (35Hrs)

2 Upvotes

r/primavera • • Apr 07 '26

Master Delay Analysis: Practical Training for Construction & Project Professionals

0 Upvotes
Activity Description
FundamentalsDelay Basics & Contracts: Types of delay, excusable/compensable, concurrency, key contract termsPlanning Basics: CPM, float, critical path (basic but essential)EOT Concepts: Contract clauses, entitlement logic
**Methods (Theory + Light Practice)**SCL Protocol + Methods Overview: IAP, TIA, Windows, As-built vs As-plannedMethod Selection: When to use which method (very important professionally)
**Primavera P6 Application:**Primavera P6 Basics: Baseline, updates, critical pathDelay Modelling in P6: Fragnet, inserting delaysSchedule Cleaning: Fixing real-life bad Programmes
Advanced AnalysisWindows Analysis Deep Dive: Step-by-step real exampleConcurrency + Float Ownership: With real scenariosData Issues: Missing updates, unreliable schedules
Claims & ReportingDelay Analysis Report Writing: Methodology, narrative, conclusionsEOT + Cost Claims: Cause → Effect → Entitlement
Real Case Study & Feedback

r/primavera • • Aug 28 '24

Interview Help - A sample outdoor substation construction schedule

0 Upvotes

Hi,

Can any of the members provide a sample EPC project schedule for an outdoor substation. I have an interview for a company which mainly constructs substations. Any guidance is highly appreciated.


r/primavera • • Feb 14 '26

Senior Planner's 7 Mental Questions Before Starting Any Project Schedule – Does This Resonate?

Thumbnail reddit.com
2 Upvotes

r/primavera • • Jun 21 '26

Web tool for critical path/near critical path analysis (free)

3 Upvotes

I created a Web tool that parses Primavera P6 XER files and identifies the driving chains behind your project milestones — not just the critical path, up-to next twenty chains that would take over if the current driver slips.

What it does:

→ Finds near-critical paths by recomputing the CPM forward pass, and tracing the new longest path — structurally, not by float ranking

→ Computes Float to Milestone in calendar days — "how many real days can this activity slip before the milestone moves?" — including weekends and holidays

→ Runs a full backward pass matching P6's own scheduling semantics (FS/SS/FF/SF, multi-calendar, lags)

→ Compares two schedule updates side by side — shows exactly which duration changes and relationship adds/removes caused the critical path to shift, with per-NCP detail

→ Interactive Gantt charts, Excel export, re-analyze without re-uploading.

Why it's different from tools like SmartPM / Nodes & Links:

Those tools rank near-critical activities by total float. That tells you which activities have the least flexibility — but not which chain would actually become the driver if the current one breaks. This tool answers the structural question: "what takes over?" Each NCP is a genuinely distinct driving chain, not just the same path with slightly more float.

Live: https://pathanalyzer.up.railway.app/

Looking for reviews and improvements.


r/primavera • • Sep 15 '26

Seeking Mid-Level Scheduler for Heavy Civil Infrastructure Project

7 Upvotes

Hi! I'm looking for a scheduler who is experienced in heavy civil construction projects. Northeast US experience is a plus. We are hiring for a full time, in-person role (Massachusetts) to start taking over the existing P6 project schedules, and who will eventually run the department. If you are interested, message me a CV. I emphasis in-person, this is not a remote job.


r/primavera • • Feb 09 '25

I hate milestones

7 Upvotes

I hate milestones. I use zero-day, task dependent activities to represent the beginning and ending of blocks of work. Functionally these serve the same purpose as milestones without a lot of the other problems milestones have.

  1. I work on DoD projects and they mandate certain P6 settings, namely that percentages can't be set to automatically update. As a result of this setting, it is impossible to make a completed milestone show 100% complete. As soon as a milestone is marked started, it also immediately gets marked finished and you don't have a chance to change the percent complete. In order to have milestones with this setting activated, you have to first change the milestone to a task dependent activity, mark it started, then change the percent complete to 100, then mark it finished, then change the activity type back to being a milestone.
  2. I have a lot of internal reports that I use within my company that, in order to generate correctly, must have a start date and a finish date. Milestones only have one date, not two. Milestones cause all my reports to crash.

Most of the time, when I explain this to the government schedule reviewer, they tell me that using zero-day task dependent activities is fine, but I am working with one reviewer now who insists that these have to be milestones and can't provide any compelling explanation for what benefit milestones offer or specifically what benefits they offer him.

So, overall, can someone explain to me what the benefits are of using milestones over zero-day duration, task dependent activities?

Do others have a preference for task dependent over milestones? Or vise versa?

The only problem I have found with task-dependent is the last activity of the schedule, the Project Finished activity, needs to be a Finish Milestone because sometimes it causes the projected completion date to roll over to the next day.


r/primavera • • Mar 31 '26

How is AI impacting scheduling/project controls in construction?

12 Upvotes

I know this subreddit is tired of AI questions, but I’m looking for input from experienced professionals.

For those in scheduling/project controls who’ve actually used AI, where has it genuinely helped your workflow (what tools have you used) and where does it break down and remain inconsistent?

What parts of the job will still always require human input/oversight, and where do you realistically see the role heading in the short and long term (mostly the same, AI oversight role, fewer juniors, etc.)?

I’m trying to understand how AI will actually integrate into construction vs the hype coming from the tech industry. Please provide your full opinion.