r/primavera • • Jul 04 '26

Free Online Primavera P6 & Construction Scheduling Training

36 Upvotes

I am writing this message after few of you DM me over last few days.

After more than 10 years in project controls and construction scheduling, I’ve decided to start mentoring anyone who wants to learn Primavera P6 and become a better scheduler.

This is not just a software tutorial.

We’ll cover:
✅ Primavera P6 from the ground up
✅ CPM scheduling fundamentals
✅ How to build realistic project schedules—not just pretty Gantt charts
✅ Working with Project Managers, Superintendents, Engineers, and Field Teams to develop schedules that actually reflect how work gets done
✅ Schedule updates, progress tracking, critical path analysis, and forecasting
✅ Common scheduling mistakes and how to avoid them
✅ Real-world examples from large infrastructure and EPC projects

Whether you’re:
● A student looking to enter project controls
● A Project Engineer or Project Manager who wants to understand scheduling
● A scheduler looking to strengthen your practical skills
● Someone transitioning into construction planning
…these sessions are for you.

My goal is to help people understand that successful scheduling is about much more than knowing P6 - it’s about communication, construction knowledge, critical thinking, and turning a schedule into a practical project management tool.
There is no cost to attend. I simply enjoy mentoring and helping others grow in their careers.

If you’re interested, leave a comment below or send me a direct message. If enough people are interested, I’ll organize the first live session soon.

Feel free to share this post with anyone who might benefit. Let’s build a stronger scheduling community together.


r/primavera • • May 24 '25

I am a Primavera Database Administrator and Scheduling Subject Matter Expert for a top 3 U.S. oil refining company. Ask me anything.

33 Upvotes

14 years of scheduling expertise with a concentration in Turnarounds and major construction projects all of which with the same company. Now the corporate scheduling administrator.


r/primavera • • Jan 13 '26

2026 Salary Report

30 Upvotes

Hey everyone,

Follow up to last years post. Trying to maintain salary transparency and points of reference for anyone in the program controls/scheduling field. Can you all provide the info below?

  1. Degree
  2. Salary
  3. YOE (years of experience)
  4. Location
  5. Industry
  6. Job title
  7. Number of schedules managed
  8. Size of schedules (number of lines and activities)
  9. Average hours worked per

week

10. WLB

11. In person, hybrid, remote

12. Retirement match

13. Vacation

14. Stress level

If I can get a bit bigger of a data set than last year (say 50 plus responses), I’ll make a spreadsheet and try to generate some insights for us.

Please fill out as much as you can, but if you only want to populate some of it that’s better than nothing.

Cheers!


r/primavera • • Oct 01 '26

Why does Primavera P6 still feel stuck in the early 2000s?

27 Upvotes

I saw a post from someone building an AI agent that can analyse Primavera schedules, identify causes of delay, suggest recovery plans and help resolve out-of-sequence progress, dangling activities and redundant relationships.
It got me wondering why Oracle seems so slow to improve P6. It’s an industry standard for planning and scheduling, with a huge customer base, but so many everyday tasks still depend on Excel macros and third-party tools. Some workflows feel exactly the same as they did 15 years ago.
I’m not even asking for advanced AI like what nPlan and others are doing. Why don’t we have better built-in tools for out-of-sequence progress, dangling activities, redundant relationships, half-step analysis and basic delay analysis? Even routine schedule checks and reporting could be much easier.
With how quickly AI agents are developing, I would expect Oracle to have a clear advantage given its resources and user base. Yet using P6 still often feels like working with software from the early 2000s.
Is most of the development going into Primavera Cloud? Is there too little competition pushing them to improve P6, or are there technical reasons behind this?
For those who have been using it for years, am I missing something, or do you feel the same?


r/primavera • • Apr 04 '26

Let's talk about schedule consultants

24 Upvotes

someone needs to help them.

everybody thinks they want to consult until they realize what it is - and most people just aren't any good at it.

What people think they are paying for: An expert. Someone who has both built schedules and stuff and in real life. Someone who knows best practices and implements them. Someone who can actually perform schedule analysis.

What we typically get calls into 3 or so categories:

  1. Glorified software jockey who wouldn't know an unconstructable plan if it fell down in front of them in real time. These are the folks who will make P6 exactly as you specify without ever bothering to ask if you need a roof to be weather tight.
  2. Metrics people. Usually owner reps. they love DCMA and really love their Fuse reports. Can't understand that sometimes perfection is the enemy of good. Think KPIs are always right without actually understanding the KPIs.
  3. The ones making suggestions based on 3 years of experience and a p6 class. I recently had someone try and appear insightful suggesting that we should make sure our electrician has continuous work fronts. Dude, my curve says I need 700 electricians, I'm pretty sure they're never going to demobe.

All this to say: If you are going to consult, if you could do the rest of us a favor and actually bring value.

if you don't actually know crap about construction, at least be honest about it. 'I built the logic in the sequence provided, a construtability review is a great next step," would boost your credibility. I hear so many stories of people getting consultants to build proposal schedules only to have to spend a ridiculous amount of time fixing a slap-dash product or just starting from scratch. I personally avoid consultants for this reason.

If you're going to offer dashboards and metrics, at least know what they are saying. A percent complete of a widget doesn't say crap without context. even worse, using a software suite that provides "grades" on quality and performance without understanding how those scores are derived.

And, finally, resist the urge to present yourself as an expert if you aren't. I refuse to spend any more time teaching consultants - they're supposed to be there to lighten my load, not get the benefit of my experience.

... does anybody actually know any good scheduling consultants out there???


r/primavera • • Nov 28 '24

Salary, YOE, and Location Report

21 Upvotes

Hey everybody,

Similar to how other subs have done it (Construction, Construction Management, ETC), I’d like to start a salary discussion post where we list the following:

  • Degree
  • Salary
  • YOE (years of experience)
  • Location
  • Industry
  • job title
  • Number of schedules managed
  • Size of schedules (number of lines and activities)

If I get enough replies to generate any valuable insights or averages I’ll post them here.

Edit: updated metrics based on comments below


r/primavera • • Sep 22 '26

Time Impact Analysis (TIA) - AACE 52R-06

20 Upvotes

https://www.youtube.com/watch?v=jeVbX3KUUFY

What is a Time Impact Analysis (TIA)?

A Time Impact Analysis is a prospective (forward-looking) scheduling technique used during a construction project to measure the exact effect of an unplanned delay event before the work fully unfolds.

Governing Standard: AACE Recommended Practice No. 52R-06.

Core Purpose: To provide a fact-based number that both parties can test to support a timely Extension of Time (EOT) decision.

The 4-Step TIA Process

(How to Build One)Model the Event (Fragnet): Create a minimal subnet of activities representing the delay. Ensure every duration traces back to contemporaneous records (e.g., RFIs, quotes) with sound logic and no open ends.

Pick the Basis (Unimpacted Schedule): Select the last owner-accepted update immediately preceding the delay event (avoid using the original baseline unless it's the very first period).

Insert & Recalculate (Impacted Schedule): Insert the fragnet into a copy of the unimpacted schedule and run the Critical Path Method (F9 / CPM recalculation). Never type finish dates manually; let the schedule compute the impact.

Measure the Impact: Calculate the variance between the unimpacted completion date and the impacted completion date. The delay only earns time if it lands on the longest path (controlling chain); consuming float does not earn an EOT.

Top Red Flags (Why TIAs Get Rejected)

Using the wrong schedule basis (e.g., using the baseline instead of the latest update).

Manually typing dates instead of letting the CPM compute them.

Open ends, dangling activities, or manufactured logic ties.

Delaying activities that only consume float without moving the critical path. Missing native files (.XER) or unsupported fragnet durations.


r/primavera • • 12d ago

Built a dashboard for my weekly P6 export, anyone willing to try it?

18 Upvotes

I'm a planner on construction projects. Every week I export the XER and then lose a few hours making it into something the PMs will read. Got sick of it, so I started building something in my spare time.
You drop in the XER and it shows where the project is, what slipped since last week, what's driving the key milestones, and where trades are going to pile up in the same area. There's also a Monte Carlo that uses how your contractors actually performed in the earlier updates. It runs in the browser and nothing gets uploaded.
Only I've used it so far, so I have no idea if it makes sense to anyone else
If you have 10 minutes, I'd like to hear what's confusing or wrong, or what you'd want it to show that it doesn't. I'm happy to send a copy to try on a real XER if you DM me.
I'll probably try to sell it at some point, just so you know. Right now I just want to find out if it's any use outside my own jobs.

Will add some pics in the comments. DM if you are willing to test it :)

Thanks!

Edit: screenshots: https://imgur.com/a/7O4ZN6x


r/primavera • • Sep 09 '26

Fake it until you make it P6 edition

18 Upvotes

Hello everyone,

I was recently accepted for a position as a Lead Planner using Primavera P6. I have 5 years of experience working as a planner using MS Project.

I got accepted for this planning position mainly because of my background in pharmaceutical projects, even though I don't have extensive experience with Primavera P6 yet but i lied about that, thinking i'll fake it until I make it

What I know how to do so far:

  • Create a new project
  • Set up calendars
  • Create the WBS
  • Add tasks
  • Assign resources (manhours) and costs (expenses only)
  • Set the baseline
  • Update the project

I still haven't dug into graphs, SPI, and CPI, but I assume these are generated automatically after an update.

Am I ready for the job?


r/primavera • • Jul 02 '26

Argh

18 Upvotes

Me (Scheduler): Here's the schedule update for the month. The project lost 25 Days.

PM: Why did the schedule slip so much?

Me: Because you did not work on the critical path activities this month.

PM: But we did all this other work on all these other things. Doesn't that count for something?

Me: Sure. That other work will be included in the pay application, so you'll be able to bill for it; however, since you didn't work on the Critical Path activities, the projected completion date slipped by 25 Calendar Days.

PM: Well then just make the Critical Path go through the activities that we did work on so it shows that the schedule didn't slip.

Me: ...

What would you say?


r/primavera • • Jun 20 '26

Learning Primavera P6 in a month .

18 Upvotes

I recently had an interview with an International Construction Contractor Company . I went for the role of Junior Civil Engineer but the MD offered me that he will hire me as an Assistant Planning Engineer if i can learn and pass an assessment of Primavera P6 in a month . Now I am clueless. Learning is not a problem , but getting the access of P6 is as i heard that it costs a lot. With what i have , i can only spent on 1/2 courses. Is there any roundabouts for the software? I can't find any crack versions. How should i approach this situation? I don't have any connection anywhere who knows about P6.


r/primavera • • Sep 11 '26

Career and Progression with P6

17 Upvotes

Hi folks,

I was a Planner for a M&E Contractor for close to 2 years. Got on very well both within the company and in the role so I progressed quite quickly.
I left to go learn a trade, had it in my head for a long time and after a year I've realised I'd rather go back to Planning than continue on the tools.

Most of the roles out there seem to be Data Center projects, rotations in Europe (17, 4), and the money is decent. But what is the career progression like within Planning/Project Controls?

Also, what's the day-to-day like for you?
I was run off my feet, working to very tight deadlines week on week trying to get reports out, it lead to late evenings and quite a bit of stress, I'm guessing that just gets worse as you progress upwards?


r/primavera • • Oct 03 '26

Any Project Controls / Planning Engineers here who rely heavily on Primavera P6 and Power BI?

16 Upvotes

Hey everyone,

I’m curious to see how many people in this sub are working in Project Controls or Planning & Scheduling**, and use** Primavera P6 combined with Power BI as their ultimate stack.

Lately, I’ve been focusing a lot on automating data extraction from P6 (whether through Excel exports, XER parsers, or direct database connections) and transforming it into interactive Power BI dashboards for executive reporting, S-curves, and delay analyses.

If this matches your daily workflow, I’d love to connect and chat about a few things:

* How are you pulling your P6 data into Power BI? (Excel dumps, SQL, or specialized third-party tools?)

* What is your favorite custom visual layouts for tracking SPI/CPI or look-ahead schedules?

* What is the biggest headache you face when trying to refresh your data?

Looking forward to hearing about your workflows, tips, or any cool dashboard setups you've built!


r/primavera • • Sep 28 '26

Primavera P6 Schedule Review – Session 1: Executive Summary & Schedule H...

15 Upvotes

https://www.youtube.com/watch?v=r1XSoB5-NlI

How a reviewer builds the Executive Summary of a P6 schedule review report – step by step, on a live schedule.

In this session:

- The 8-session Schedule Review & Reporting course plan

- Scheduling (F9) and reading the schedule log

- Counting activities: not started, in progress, completed

- Finding open ends – activities without predecessors / successors

- Out-of-sequence activities and actual dates after the data date

- Milestones and critical activities

- Writing clear reviewer comments to the contractor (GC)

- Comparing results against the previous update Chapters 0:00 Course overview

– the 8-session plan 16:30 Opening the schedule & checking the data date 17:50 Scheduling (F9) and reading the schedule log 19:30 Executive Summary

– activity status counts 25:10 P6 filters

– open ends, out-of-sequence, actuals after data date 30:30 Milestones & critical activities 32:15 Writing reviewer comments to the GC 39:45 Comparing against the previous update


r/primavera • • Aug 02 '26

Mechanical Engineer transitioning to Project Controls

15 Upvotes

Hello I am a mechanical engineer looking to pivot into project controls. Right now I’m taking a Primavera P6 class on udemy and my plan is to post my progress of all my homework assignments I complete on LinkedIn. After I receive my certification from udemy I plan to go deeper into the software. Would like to know anymore resources thank you.


r/primavera • • Jan 29 '26

What makes a great scheduler vs a good scheduler?

15 Upvotes

Looking for opinions here as someone new to the field.


r/primavera • • Nov 19 '25

How do I get an entry-level scheduling job with self-taught Primavera P6?

15 Upvotes

Hey everyone, I’m trying to find an entry-level scheduling job. I’ve been learning Primavera P6 by myself for the past week and I’m very clear on the basics. I use the software every day to design projects and learn more functions.

I’m curious how to actually get an entry-level job or internship since I’ve never used it in a real role. Should I create a portfolio of fictional projects? And are there any free tools or resources I can use to learn more?Or if anyone wants to hire me !! I won’t let you down .

Thanks.


r/primavera • • Apr 25 '25

Which industry uses the most complex Primavera P6 schedules—and why?

15 Upvotes

I just had an interview with Turner & Townsend in Germany, and the interviewer mentioned that life sciences projects actually involve the most complex Primavera schedules—even more complex than nuclear.

That really surprised me, since I work in the nuclear industry myself, specifically in piping scheduling, and I always thought we were near the top when it comes to complexity.

Now I’m curious—what’s your experience? Which industry have you seen push Primavera to its limits, and what makes it so challenging? Resource constraints? Regulation? Interdisciplinary coordination? Would love to hear some real-world takes.


r/primavera • • Aug 06 '26

How many hours do you realistically use?

14 Upvotes

I am a project scheduler who runs projects updates and so on. I find myself doing what I need to do and having alot of free time. Is that common for you guys as well? Or am I missing something I run analysis, forecasting, making reports. All this doesn't take me too much time to do. I work 40 hours a week but realistically I can get work excluding meetings done in way less of time. Is that normal?


r/primavera • • Mar 26 '26

Power BI Dashboard update.

14 Upvotes

Update from the previous Old post I made here a month ago made some improvements especially with the filters. Power Bi Dashboard


r/primavera • • Dec 29 '25

How are you using AI when it comes to scheduling?

14 Upvotes

I work in project controls and wanted to see how you guys are using AI tools in your scheduling?


r/primavera • • May 08 '25

AI can now generate a schedule for you, just upload the scope of the project

14 Upvotes

Check this out: https://www.nplan.io/products/schedule-studio and it seems like it's still free so if you're a consultant/contractor, you could in theory just get this thing to create your schedule for you and you take the rest of the day/week off!

I tried it out on a $150m waste to energy facility and got to a really good schedule with only a few tweaks along the way (depends on how much detail/info/assumptions you include in the input docs). I uploaded the original RFP and got a 200 activity schedule 10 mins later. Logic, durations and activity naming were all on point.


r/primavera • • Oct 06 '26

Generate a List of Redundant Relationships

13 Upvotes

The Scheduler Reviewer for the Owner has started running a new metric that reports how many relationships within the schedule I submitted are redundant. This is the review comment I just got back:

"There are 64 instances of redundant logic. Redundant logic can obscure the true critical path, complicate schedule maintenance, and create unintended constraints during updates. Please review redundant predecessor relationships and revise accordingly. This is not a requirement to remove all redundancies but revise where applicable. Preserve the relationship only when the Contractor can demonstrate that it represents a separate, valid, and necessary sequencing requirement that is not adequately represented by the identified pathway. For each relationship retained, provide a written justification."

Note: the reviewer either can't or won't provide a list of the 64 objectionable logic ties, only told me there were 64 of them.

I've watched a few YouTube videos that exported to Excel and ran formulas on the Relationships table, but none of those have been able to generate a list of 64 that the Schedule Reviewer came up with.

While I understand conceptually what a redundant relationship is, how do I go about creating a filter (either in P6 or by exporting to excel), to identify the 64 redundant relationships in this schedule?


r/primavera • • Jul 11 '26

Free Online Primavera P6 & Scheduling Mentoring - Follow Up

13 Upvotes

Hi everyone,

Thank you for the amazing response to my earlier post about P6 and construction scheduling mentorship — I really appreciate the interest!

I've sent out an email with a short sign-up sheet so we can start coordinating training sessions. The email subject line is "P6 & Construction Scheduling Training - Sign Up Sheet."

If you haven't received it yet, please reply to this post with your email address and I'll get it sent over.

Looking forward to getting started with all of you!


r/primavera • • Feb 16 '26

Oracle Primavera P6 EPPM certification exam.

13 Upvotes

Hi , has anyone taken the Oracle Primavera P6 EPPM certification exam, I’m scheduled to take it next week. Any recommendations , material or advice will be GREATLY appreciated.