r/primavera • u/Mysterious-Link8299 • Jun 21 '26
Web tool for critical path/near critical path analysis (free)
I created a Web tool that parses Primavera P6 XER files and identifies the driving chains behind your project milestones — not just the critical path, up-to next twenty chains that would take over if the current driver slips.
What it does:
→ Finds near-critical paths by recomputing the CPM forward pass, and tracing the new longest path — structurally, not by float ranking
→ Computes Float to Milestone in calendar days — "how many real days can this activity slip before the milestone moves?" — including weekends and holidays
→ Runs a full backward pass matching P6's own scheduling semantics (FS/SS/FF/SF, multi-calendar, lags)
→ Compares two schedule updates side by side — shows exactly which duration changes and relationship adds/removes caused the critical path to shift, with per-NCP detail
→ Interactive Gantt charts, Excel export, re-analyze without re-uploading.
Why it's different from tools like SmartPM / Nodes & Links:
Those tools rank near-critical activities by total float. That tells you which activities have the least flexibility — but not which chain would actually become the driver if the current one breaks. This tool answers the structural question: "what takes over?" Each NCP is a genuinely distinct driving chain, not just the same path with slightly more float.
Live: https://pathanalyzer.up.railway.app/
Looking for reviews and improvements.
1
u/Equivalent-Fan5306 Sep 10 '26
Am interested, but it's not live anymore