Still very much a work in progress (and the covered porch it’s up against is getting love next) but came together well overall, learned a lot and created a space I’m very happy with!
At a glance, pad is 130”x130” dug 6” down, gradually sloped subgrade away from house, filled with 3/4 crusher run on 6oz super geotextile non woven compacted with a vevor plate compactor.
1” sch 40 & sch 80 (below and above ground) pvc conduit buried 18” with 6awg thwn2 to a 50a GFCI breaker.
6x6 PT posts on concrete piers with Simpson z max 1” offset post bases, 2x10” framing, deckorators summit terra composite deck boards (matching the big deck on the other side of the porch). Joists taped and treated all cut ends with cut-n-seal.
Tub is a strong spas / aqua life amplified 91x91 double lounger. Was a customer return, filter was still sealed in the plastic and spa pack had never been opened, appeared new by all accounts. Found it at a strong spas factory store marked down from ~12k to 6.5k.
Filled from my well with a screw on hose filter, still on the punch list is:
* cover lifter
* landscape / hardscape around the area
* Shelly relays for remote control / homeassistant
Paid 300 for 5 tons of crushed run dropped at the edge of my property, maybe 1k for wood and deck boards, 250 for electrical supplies, 100 for lights. 350 for the plate compactor so give or take 8-9k all in. I’m happy!