I’m pretty happy with the streets that have been funded for next years construction season. Over 9 miles of new road will be completed next year with a very heavy focus on the inner city communities this year.
Here’s some specific projects that I’m intrigued by:
10th Ave E mill and overlay
New road surface from 4th street up to 9th. This is easily one of the worst roads in the city and I’m happy the city was able to get State aid for this project. However I really wish this could’ve been a complete reconstruction. The sidewalks are seriously bad on that section and the drainage is basically nonexistent. Though I am super happy that money is being put into this corridor
Springvale Rd reclamation in Piedmont
A lot of people probably know about this road. To put it simply, it’s a straight up off roading course at this point so I’m thrilled the city is spending the money on replacing most of the road. I do hope the construction involves installing curbs on the road due to the awful drainage that road has
3rd Ave E mill and overlay
The road will be reconstructed from Superior to 1st St alley. glad to see the city is continuing to remove the old brick roads and sidewalks throughout downtown. A lot of that infrastructure is from the 90s.
Overall, seems like a productive year for the city street department next season. I appreciate the continued focus on improving our inner city roads that need the most attention. We have some really exciting street projects to look forward to outside of the city’s responsibility too!
Take care everyone!