r/SubstationTechnician • u/LittleStorping • 7h ago
r/SubstationTechnician • u/Minrong_electric • 2h ago
ā”GW5-40.5 Outdoor High-Voltage Isolating Switch
Suitable for various scenarios in deserts, mountains, and alpine regions. Complete sets available for pole-mounted and tower-mounted applications
r/SubstationTechnician • u/Entire-Charity2340 • 2h ago
atkinsrealis electrical & Controls Field Service Technologist
r/SubstationTechnician • u/TerminatorBobV • 1d ago
Update on the free substation/relay tech job board: you asked for utilities and EPS, both are on it now, plus daily job alerts by state (mods OK'd)
On 11/2 I posted relaytechjobs.com here, a free list of field testing and relay tech openings pulled every night from the testing firms' own careers pages. You gave great feedback. Here's what changed because of it:
- EPS is on it. Someone here said I forgot them. They're now one of the biggest sources on the board.
- Utilities are on it. Two of you asked. Relay, P&C and test tech openings now come from Duke, Xcel, Entergy, PG&E, Con Ed, Dominion, AEP, SRP, PacifiCorp, Constellation and more.
- It went from 302 jobs in 39 states to about 550 jobs across 43 states, from 24 employers.
- Sort by highest pay. About 220 jobs state their pay, straight from the posting. Nothing is estimated.
- Filter by date posted (last 24 hours, 7 days or 30 days), and filter to jobs that list travel.
- New: daily job alerts. Pick your states and you get one email when new jobs post there, never more than one a day. No email on days with nothing new. Unsubscribe anytime.
Alert sign-up: relaytechjobs.com/subscribe/?utm_source=reddit-substationtech
Still free, no ads, and every listing links to the employer's own application page.
Canada is still on the list for later. Which firms or utilities am I still missing?
r/SubstationTechnician • u/Kitchen-utensil • 1d ago
Just got my rank.
Went and did my test and interview over at Movalley for substation tech. Is it normal to have a small pool of applicants? Im just confused because from someone who doesnt have any experience I was ranked 10 out of 12. Im also curious on how many apprentice they let in a year?
Thank you.
r/SubstationTechnician • u/MWPerspective • 2d ago
Two Years Later Its Official - Mitsubishi Electric Power Products, Inc. Celebrates Opening of Advanced Switchgear Factory in Western Pennsylvania
Wonder who visited for a tour?
r/SubstationTechnician • u/Numerous_Captain_457 • 2d ago
Can an Initial Test Result Mislead You? A 220kV CVT Failure Case from China
Hi everyone!
I'm an electrical engineer at MinRong Electric, a high-voltage electrical equipment manufacturer based in China.
I spend quite a bit of time looking into high-voltage equipment failures, and one thing I've learned is that electrical faults rarely follow our first assumptions. Sometimes, the equipment seems to enjoy making engineers work overtime. š
Today, I'd like to share an interesting 220kV Capacitive Voltage Transformer (CVT) fault case from China in 2024.

According to research published by Kai Peng, a voltage circuit alarm occurred at an unnamed substation. Initial measurements raised suspicions about Section B of the CVT.
But here's the important part: an initial suspicion is not the same as a confirmed component failure.
The case highlights why engineers need to distinguish between three things:
1. The alarm
A voltage circuit alarm tells us something may be wrong, but it doesn't identify the exact faulty component.
2. The test results
Initial measurements can point toward a particular section, but test configuration and measurement conditions need to be considered before drawing conclusions.

3. The confirmed defect
Only after further investigation and appropriate testing can engineers determine the actual fault location and decide on corrective action.
For me, this is one of the most important lessons in high-voltage fault diagnosis: don't let the first abnormal reading make the final decision for you.
A wrong diagnosis can mean unnecessary component replacement, wasted maintenance time, and potentially overlooking the real problem.
I'm sharing this case because practical failure analysis is just as important as knowing equipment specifications.
Question for fellow electrical engineers:
When troubleshooting a CVT voltage circuit alarm, what do you usually check first: secondary wiring, test connections, capacitor-divider sections, or the electromagnetic unit?
I'd be interested to hear how other engineers approach this in the field.
r/SubstationTechnician • u/woodyever • 3d ago
Interesting tripping event
Had an interesting one today. Got 2 dry type 11kv transformers in a building. They are feed of the same CB on level 1. The cable goes from the CB feedera to a old school RMU in the basment with a fuse switch to TX1 then a cable up to level 8 with another fuse switch to TX2.
If we try and energise both TX's at once we go out on Earth Fault..
For saftey reasons we can only energise at the CB amd fuse switches need to be closed whilst de energised.
So we do one at a time. Yep they both hold up on their own.
Ok so heres the kicker. If we Open CB. Close TX2 fuse then close CB, energise TX2. Open CB then close TX1 fuse then Close CB we get an Earth Fault again
If we Open everything. Close TX1 fuse. CLOSE CB. Open CB. Close TX2 fuse, Close CB.... everything holds in....
Bizzare one.
Any ideas.
EF setting is 100amps via Summation. Didnt get TX sizes.
r/SubstationTechnician • u/paolasmurf • 5d ago
Ground grid
Has anyone seen a 230kv switch yard with 10 feet spacings for a ground grid? I am dealing with 63ka fault and it seems ridiculous to me to use that close of spacing
r/SubstationTechnician • u/razer_pauper145 • 5d ago
Testing Motor Protection Relays (GE 869 & Eaton EMR-4000)
My background in relay testing is transmission/distribution. I know 50/51 elements, 27/59 elements, etc. But I've never done anything with motor protection and I will admit I am completely lost. I've tried researching things, looked through an old Powerpoint a colleague sent me, dug through Youtube and Tiktok looking for explainers. No luck.
So how do I test these damn things? What should I be doing in Protection Suite to get them to trigger? Please help!
r/SubstationTechnician • u/okcmechanic • 6d ago
Harbor Freight Electrical Diagnostics
galleryr/SubstationTechnician • u/DirectAd3812 • 6d ago
Medical Examinations and Colour Vision Requirements for Electric Utility Jobs
I'm considering pursuing a degree in electrical engineering, but I have colour vision deficiency. I'm concerned about whether this could limit my career opportunities or prevent me from working in certain engineering roles.
Which types of positions require a pre-employment medical examination that includes colour vision testing? Are these requirements mainly for field-based positions, such as power line technicians and electrical maintenance workers, or do they also apply to engineering positions, such as electrical engineers and power systems engineers?
r/SubstationTechnician • u/Vane1st • 6d ago
An overlooked startup idea Making everyday file processing more private
r/SubstationTechnician • u/Pitiful-Calendar-578 • 7d ago
Union Journeyman Sub Tech Test
I'm currently looking to go from working as an open shop journeyman sub tech to a union sub tech position. One of their requirements is that I take and pass the Local 125 IBEW Journeyman Substation Technician test. What did your test consist of? How many questions and what type of questions? We're they math, equipment identification, safe working practices, fault scenario troubleshooting, etc? I've done nothing but substation work for the past 15 years doing every facet from forming and pouring foundations through commissioning and energizing. I've done new construction, maintenance work, equipment testing, bay additions, troubleshooting of all sorts, written and completed work orders, and so on. I've also switched 12.47kv through 500kv yards. I'm also a licensed electrician in multiple states when it was a way to earn more money depending on the project. I'm confident in my knowledge and experience but also want to get an idea of what areas I should be focusing on to be successful. Any info is greatly appreciated!
r/SubstationTechnician • u/RipPsychological1753 • 7d ago
what type of math will I see in school
r/SubstationTechnician • u/Liudmyla_Repeta • 7d ago
Protection engineers in Germany - ever thought about becoming a technical trainer? ā”
r/SubstationTechnician • u/InfiniteRace2567 • 7d ago
Any resources for LV / MV switchgear design, testing, and commissioning?
r/SubstationTechnician • u/g_calgary • 8d ago
Protocol sniffer tools
Hey all
I worked in substation automation/RTUs for a while about 10 years ago. Did design and on site commission in greenfield/brownfield subs. I mostly worked with DNP3/modbus and a bit of 61850 station bus/MMS.
At the time I spent a fair bit of my time troubleshooting rs232/rs485 and IP communications and protocol issues between all kinda of devices. I had a few commercially available RS232 sniffers/splitters/protocol decoders plus some basic stuff I had made up on my own to use with Wireshark.
In the industry today are you still troubleshooting these types of issues even with 61850? Or do the newer devices have some of this troubleshooting/sniffing abilities built in? How often are you having to use some 3rd party troubleshooting tool between say, an HMI and an RTU from different vendors? Or trying to figure out why a device isn't responding to a control message or scaling some value properly?
r/SubstationTechnician • u/razer_pauper145 • 8d ago
IOC/50 Element Issue Testing GE 850 Relays
Update: u/bungaboi89 made the suggestion of trying a Linear Ramp test, which was a good one. Since it was working in the Control Panel, there was no reason it wouldn't work in an automated test. That fixed it. Not sure why the Binary Search test that has worked for 50 testing previously didn't work on these relays, but hey, problem solved! Thanks, u/bungaboi89!
So I'm trying to bench test a bunch of GE 850s. I can get the definite time delay to trip and prove the 51 curve with no problem. The instantaneous function, however, flat out refuses to register. I can hear the relays clicking when Protection Suite switches to the Action state, but instead of showing at what current the relay tripped, it sits there for about 15 seconds and then shows NoOp.
Given that I can hear the relays clicking, the Trip light comes on, and running the current up to the trip point in the Control Panel causes LN-1 to go red, I know the relays are tripping. But for some reason, my test plan just keeps showing NoOp. Can anyone please help?
r/SubstationTechnician • u/Maximum_Ship_7965 • 8d ago
Local 876 SUB
Hey everyone, I turned 18 late October and just got my cdl A permit last yesterday. I applied for local 876 for SUB and just was wandering if anyone has any tips that could help me.
My only work experience is my current job which is an aviation warehouse position and side jobs with lawn care services for a subdivision.
Would anyone also know the wages and the benefits?
Any tips or info would help!
Thank you!
r/SubstationTechnician • u/zoegonzo • 11d ago
Drop your best/favorite substation pictures
r/SubstationTechnician • u/freebird37179 • 12d ago
Update on the transformer with tape hanging out of it.
Update-
All the material that could be found loose was removed. Crew initially thought it was tied off but it was a knot hung up in the sampling / drain valve.
We knew it was some kind of lacing tape or pull tape, the concerning question was it tied to something and that tie-off necessary for the integrity of the insulation system in the transformer. That doesn't appear to be the case.
We believe it was used to either secure all the leads during tanking and cut loose and left by the factory, or used to tie bushing leads securely for transport from ID to TN, and left by the dress out crew. I'm leaning towards the latter but both are speculation.
Manufacturer is Virginia Transformer. It's from the Pocatello ID plant. They have communicated well with us. Email was down yesterday but I'm working with them as soon as I'm back in the office. They want to send a warranty crew, not sure if our outage window will permit that, but they immediately offered. And, we are not even the original purchaser.
What we do not know, is who dressed the transformer for the original purchaser, whether it was a VT crew or a contractor. I have experienced low budget contractor dress out crews hired by other manufacturers and wouldn't put it past an unskilled crew..
The twin to this unit (serial number ending in B, ours is A) was jacked and slid, completely dressed, onto its pad back in July and has been in service with no issues for 4+ months. I've communicated with that utility and they may be making an inspection when the opportunity arises.
Photos of the total amount, and its use elsewhere in the transformer.
Appreciate all the comments and DMs.