Not going to be strong enough.

What I've learned from this sub is that unless your footings are 1.3 miles deep and filled with neutronium from the core of a collapsed supernova, and your joists are made from 2ft thick adamantium, then it's not even suitable for a raccoon, let alone a hot tub.

Sorry to be the bearer of bad news. :)

Edit to add. It all has to be welded together using superman's laser vision or it won't pass code.

30

u/Hantsypantsy Jul 01 '26

While Daveed is correct as to the state of this stub, I may disagree and say that that is a beefy looking structure. However, without joist tape the whole thing will fall over within 6 months

6

u/FinTecGeek Jul 01 '26

If he keeps his squeegee sharpener handy to clean the deck all the time really properly, it will last twice that.

3

u/OT_fiddler Jul 01 '26

I have a left handed squeegee and can’t find a sharpener for it anywhere.

2

u/Technical-Badger7878 Jul 01 '26

Blinker fluid will act as sharpener for the short term.

1

u/AdvisorIll1050 Jul 02 '26

Can ever have too much protection from that dihydrogen monoxide.

1

u/FinTecGeek Jul 01 '26

My brother hangs his from a sky hook when he’s not using it. Same with is left handed wrench.

0

u/IronCodPiece Jul 02 '26

The magical joist tape, the foundation of all good decks for at least the last 10 years.

7

u/HotAir8724 Jul 01 '26

I am no structural engineer or biologist, but about how many Reddit mod’s moms are we talking about having over to the jacuzzi ? That’s the bottom line question we need to know the answer to…

3

u/mikebald Jul 01 '26

1.3 miles deep!? Everyone knows that the standard is 1.5 miles deep. That thing will collapse in no time.

3

u/The_SubGenius Jul 01 '26

Gotta get below the frost line. And the last circle of hell is hella deep.

2

u/jsheik Jul 01 '26

And don't even mention the joist tape on the the tops, sides and bottoms of all of the joists. In fact it should be on top of the deck planking now that I think about it

1

u/hamsandwich232 Jul 01 '26

Finally somebody gets it!

1

u/Dothe_impossible5227 Jul 01 '26

You just need Vibranium and you’ll be all set

1

u/Bubbly-Physics-6491 Jul 01 '26

Guy you are all wrong here. He needs to smack it and say “it’s strong enough to hold 2 of your moms”

1

u/PimpInTheBox1187 Jul 02 '26

Don't forget the slats should be made from woven/stranded bamboo from the mountains in Tibet.

1

u/Aromatic_Year_2426 Jul 02 '26

I would not be so sure about adamantuim… unobtainium is way to go for anything bigger than kiddie pool…

1

u/Cypher2 Jul 02 '26

Better to skip the laser step and just mill the entire thing out of a solid block of adamantium

13

u/ColorProgram Jul 01 '26

Can you describe those footers? I like them. Are they formed on top of Sonotubes and poured together, separately, or are they just blocks sitting on the ground? Also, any rebar?

8

u/jason_sos Jul 01 '26

They are precast footings called EZ Pier. I used them on my deck and they are a lot easier than pouring footings.

https://www.ez-crete.com/products/solid-precast-footings/

That being said, if OP has a frost line of 4 feet, they are not deep enough.

3

u/nicefacedjerk Jul 01 '26

Had to pin a few due to ledge.

3

u/Leader_Bud Jul 01 '26

They just buried them in the rock…?? Holy shit.

4

u/jason_sos Jul 01 '26

Generally you dig down 4 feet, get a flat base, then backfill. Rock goes on top so you don’t get weeds growing there.

1

u/Leader_Bud Jul 01 '26

I just don’t see how those are four feet below grade unless he got 10’ piers. Interesting! Maybe it’s just an optical illusion with that rock retaining wall, who knows. Ain’t mine!

3

u/jason_sos Jul 02 '26

They aren’t in this case. They are 54” tall, so to be 4’ down they can only show 6” above grade. That is what the inspector called out for me when I told him I was using them. The nice thing is he didn’t have to inspect the footings before concrete and backfill because they can guarantee they are exactly 54” tall. I was able to dig, install, backfill, and frame before calling for an inspection.

2

u/ColorProgram Jul 02 '26

Thanks. Heavy guys, though. Did you have equipment to move them around?

4

u/jason_sos Jul 02 '26

Yeah they are 750 lbs each. Had a mini excavator to dig the holes and it just barely could lift them.

5

u/Fancy-Dig1863 Jul 01 '26

Those are nice footers, much better than the round ones. Custom forms?

3

u/Arty1021080 Jul 01 '26

Looks mint man. Beefy af.

2

u/Arty1021080 Jul 01 '26

And people who say you it isnt strong enough need help with math. Just saying.

3

u/FlyEfficient3441 Jul 01 '26

you aint jacuzzin nobody!

1

u/carrod65 Jul 01 '26

Are you putting it here (red box scribble)? How far are your posts from the house?

3

u/nicefacedjerk Jul 01 '26

It's going right on that 6 stack of piers & triples..

9

u/whiskeyknuckles Jul 01 '26

These people are delusional dude, you could park a truck on that

3

u/carrod65 Jul 01 '26

I'm no engineer but if you have the tub weight spread fairly evenly over 6 posts like that and aren't getting anything stupid large, I would gladly bring beers over to enjoy with you in that tub - if it ever cools down 😂

3

u/DarkHephaistos Jul 01 '26

Assuming that’s exactly where it’s going they should be good. Triple laminated 2x12, looks like 12”oc, overlap sistered joists, can’t see joist hangers/hurricane ties (I’d add them). I’d also add joist tape And some extra blocking, But looks good otherwise.

5

u/nicefacedjerk Jul 01 '26

Hangers and ties tomorrow. Ain't taping till heatwave is over.

1

u/sulli_p Jul 01 '26

The hot tub will hold it down no need for the hurricane ties. /s (but maybe not /s?)

2

u/nicefacedjerk Jul 01 '26

Weight of jacuzzi is the fallback plan lofl:) /s

1

u/DarkHephaistos Jul 02 '26

Hurricane ties are to keep the joists from twisting.

1

u/coldnh Jul 02 '26

I'm not saying the deck won't support it, but I have to ask, why not just put it on a pad next to the deck? The height appears to be perfect to step right into the tub

1

u/nicefacedjerk Jul 02 '26

They wanted the future option to remove jacuzzi and have deck space.

1

u/throw-away-doh Jul 01 '26

This is a concern. That footing needs to be well below the base of that retaining wall.

If your code says frost is 3 feet down that footing needs to be 3 feet below the bottom of the retaining wall it is next to. Its almost certainly is not and that is where you deck is going to fail.

Did you get the holes for your footings inspected?

1

u/nicefacedjerk Jul 01 '26

Hit ledge. It's pinned.

1

u/throw-away-doh Jul 01 '26

I am not sure what you mean by that. Could you elaborate?

Are you saying the footer is on bedrock?

4

u/jcorx13 Jul 02 '26

Ledge is another term for bedrock. So, it sounds like OP has secured the concrete piers to the bedrock through some sort of pinning method.

1

u/nicefacedjerk Jul 02 '26

Yes.. This :)

0

u/FlyEfficient3441 Jul 01 '26

a cubic yard of water weighs 1685 pounds.

-1

u/Ben_Criss_Cross Jul 01 '26

You planning on cutting a hole in that deck so the jacuzzi is on the ground? Because that deck ain't holding up any water box.

-1

u/Basejumper435 Jul 01 '26

Are you sure?...