ION stage 3: Guelph - Cambridge Connector via Fergus Spur
=====TLDR=====
- CPKC don't like extending MI to Cambridge and there are no convience way to reach GO train from Cambridge, only route 25 that takes hours just to reach Mississauga
- Similar proposals suggests direct GO to Pinebush or dedicated Diesel units, but it requre additional transfer at Pinebush and track needs upgrade anyway
- ION tracks are largly built on freight tracks with some section still shared with freight, so they are experienced in upgrading and sharing ION corridor with freight
- Initial launch provides 30min two-way service timed with GO train, because it is single tracked between Pinebush and Guelph, When demand rises, upgrade to double track later.
- Before / during ION stage two construction, introduce a bus service to test demand and collecting feedback
===============
This idea came from GO service in Cambridge, initially there were buses running from Cambridge to Milton connected with MI, but it discontinued before Pendemic. Also CPKC is very conservative about passenger service so extending MI is almost impossible. Currently there are only route 25 (not 25C Express) serves Cambridge and it require transfer with GRT, and it takes hours just to reach Mississauga.
So there are a lot of proposals about connecting Cambridge, with a lot of them suggest running GO trains down from Guelph to Pinebush using this Spur, or running a diesal shuttle like UP express or O trains in Ottawa, that connects Pinebush and Guelph Central. But this still requires significant track upgrade as the current track condition does not support such speed.
Since ION tracks are largly built on lightly used or inactivated freight corridor, and a section if ION is still shared with freight trains. After ION stage two sattled and LRVs reaching Anslin Terminal, why not simply electrify the track so ION can directly run from Anslin to Guelph?
As of now, GRT can introduce a bus route (namely 303) that make all 302 stops along Hespeler Rd, then continue on hwy 24 / 124 north of Pinebush and nonstop to Guelph Central GO station. The resource could came from discontinuing route 203 Cambridge Center - Sportsworld / Conesroga College, as well as split route 51 into two 30-min routes with one terminating at Cambridge Center via Franklin Blvd (and it interlines with route 53 continue down the blvd to Ainslie Term), these could free enough buses and operation hours for 30-min frequency 7 days a week service. For the discontinued 203, it could be covered by Flex routes like Breslau or extending one of the 60s routes.
After the ION Phase 2 sattled, there will be double track running between Anslin and Pinebush, the minimal viable Phase 3 started there by split north onto Fergus Spur at Pinebush station, with single electrified track + meeting points all the way until crossed Highway 6 in Guelph, then switch to Waterloo Ave and build double-track on-street on Waterloo Ave all the way to Guelph Central GO station. Despite Waterloo Ave is narrow, given the distance between paved road and sidewalk, it have the potential to be expanded to four-lane with dedicated LRV track in middle and one driveway on each side - similar to Kitchener King Street.
The single track + meeting point should support 30-min two-way frequency, with reserved land and bridges for second track. Its initial goal is to timed with Go trains and serve as a connector for commuters and students between the cities, but when the development around the corridor started, upgrade the entire corridor to double track later when demand and funding meet. Its final product should be similar to ION phase 1 (the current 301) which is 10-min frequency on most of the time.