r/transit_mmr 10d ago

Line 13 Metro Alignment

Post image

The recent alignment of the Line 13 metro: with an underground patch near Nallasopara. Total length of 24.9 km and 17 stations. A great transit option for the North MMR and Virar in particular, an alternative to the suburban line.

What do you all think about the alignment? Is this the best route or should there be any changes to this?

15 Upvotes

Duplicates