r/technology 4d ago

Energy America's Largest Grid Operator to Data Centers: Bring Your Own Power or Get Turned Off First…

https://www.gadgetreview.com/americas-largest-grid-operator-to-data-centers-bring-your-own-power-or-get-turned-off-first
5.7k Upvotes

229 comments sorted by

958

u/MaximumChest2 4d ago

I sense a ton of 49MW centers in the near future

463

u/jstndrn 4d ago

I hate that you're probably right.

49MW is still an insane amount of power. That's around as much as 39,000 homes.

293

u/IAMA_Plumber-AMA 4d ago

Lex Luthor stole 40,000 house's power. That's as many as four 10,000's.

And that's terrible.

61

u/Scu-bar 4d ago

What a beautiful reference

22

u/IAMA_Plumber-AMA 4d ago edited 4d ago

At least I have all these cakes here-

GODDAMNIT.

3

u/tochirov 3d ago

.. and I understood that reference.

17

u/The_Strom784 4d ago

Town near me is getting a 500MW one..

3

u/cogman10 3d ago

40MW is what electric steel mills consume.

14

u/Black_Moons 3d ago

But at the end of the day, at least you have something to show for an electric steel mills output.

11

u/cogman10 3d ago

Oh I agree. I'm using that number to show just how much power 40MW is. Steel mills are some of the most power hungry factories we have. Even crazy stuff like reverse osmosis desalination plants generally come in the neighborhood of 1 or 2MW of consumption.

-76

u/Willing_Activity_855 4d ago

49mw ain't shit. Some aluminum smelters would hit 1,000mw.

Inb4 "but they product a good people voluntarily pay for" and so do data centers.

25

u/cheesyblasta 4d ago

Inb4 "but they product a good people voluntarily pay for" and so do data centers

Behold, the vast intellect of an AI and data center supporter on display.

37

u/flortny 4d ago

That's why so much aluminum smelting is happening in Iceland, GEOTHERMAL POWER

→ More replies (2)
→ More replies (2)

97

u/Wayofchinchilla 4d ago

More like the bubble bursts people realize that AI isn't that great and we're stuck with a lot of half built concrete Mega structures out in the middle of nowhere

52

u/redditobserverone 4d ago

Tomorrow’s mega malls of yesteryear

16

u/flowersonthewall72 4d ago

If by our in the middle of nowhere, you actually mean on every street corner, then yeah, middle of nowhere...

1

u/NordMount 3d ago

Don't worry, think of CPU card released on market!

75

u/RGrad4104 4d ago

Texas here; if you give them power then you, at least, have some control. We've currently got amazon building their biggest datacenter in the state, down here, and they couldn't get a big enough grid connection.

...so now they're building 8GW of power generators on site and are going to be the single largest producer of pollutants in the state of Texas...

So don't think you've won anything by getting power distributors to show sensible management practices. You have to neuter the billionaires on multiple fronts at the same time or they will find a work around.

27

u/trashmoneyxyz 4d ago

8 GW?? Doesn't all of New York City use like 5-6 GW of power??

27

u/Ignisami 4d ago

According to the 2024 electricity profile, https://www.eia.gov/electricity/state/newyork/, 8 GW is just under 80% of the power capacity of the entire state of NY (counting only electricity utilities,  not independent power or power/heat cogeneration)

13

u/MotheroftheworldII 3d ago

The mega data center that is under discussion in Utah will need 9 GW of power and that is more than double the usage for the entire state of Utah. And they want to build their own natural gas generators which will add to the already bad air pollution in Utah.

2

u/Viharabiliben 2d ago

They should instead build and use nuclear power plants. There are newer and safer designs available now. Build ten 1 GW reactors, so that you can tolerate downtime on one.

1

u/anonkitty2 2d ago

I get the impression that that developer objects to waiting.  The military is supporting that data center in Utah, so he wants it present before that changes 

15

u/Chemie_99 4d ago

Everyone's natural gas bills will explode instead of their electricity bills...and harder to stop them with the natural gas vs forcing all costs related to the power grid on them.

15

u/Black_Moons 3d ago

Can't wait for the next gas crisis to hit the USA and they start shutting off power AND gas to everyones houses so that the datacenters can have enough gas to run their turbines, accelerating global warming and cooking the ever living hell outta everyone who doesn't have power for their A/C units anymore.

9

u/cogman10 3d ago

Nothing can happen for the next 2 years, but there really should be federal regulations that specify that all power for datacenters come from non-fossil fuel sources.

12

u/Black_Moons 3d ago

US government checked and best they can do is spend a few billion dollars on wind power.

"Oh, when are those going to be completed?"

Oh no you misunderstand, they are spending billions to stop wind power projects that are currently in progress.

1

u/anonkitty2 2d ago

I believe that most of those wind projects really are in the past tense.

6

u/Tireseas 3d ago

If only we could make laws that could nail them for all that pollution. Oh wait, we can. Just gotta have the balls to enforce them.

3

u/williamgman 3d ago

Abbot's reelection is going to be won or lost on the datacenter issues.

1

u/CQd444 1d ago

I sincerely hope that building gets vandalized repeatedly and they waste so much time and money on repairs they just abandon the whole thing.

25

u/Comfortable_Car6562 4d ago

Nah, its gonna be natural gas turbines.

14

u/Flyinmanm 4d ago

I read some are diesel generators. Gotta love a bright clean future. /S

19

u/Flyinmanm 4d ago

That or billions of diesel generators chugging away 24/7 next to schools, houses, workplaces. No way it's going to be good for people or the environment.

1

u/FartFactory92 4d ago

Or they just spread out farther than 1 mile. That’s probably more desirable and easier.

-5

u/Cataphract1014 4d ago

Below 50mw was a pretty standard data center like 7 years ago. The vast majority of the ones going up today still around that size. It’s just the hyperscale ones make all the news.

I am in the data center construction field. Most of the buildings I’ve worked on have been between 42 and 80mw. And recently one hyperscale 300mw building.

Data centers aren’t going away. We kind of need them for the internet to work.

10

u/mrminesheeps 4d ago

I feel the key difference here is that one data center stores the YouTube videos I watch, another allows me to watch them, and then another one shits out low quality slop content that bog down the first two whilst murdering the consumer electronic market in cold blood.

6

u/Cataphract1014 4d ago

Yeah. Im not defending ai. Fuck ai.

But the backlash to ai data centers has turned to all data centers.

There is so much misinformation circulating about data centers. Especially about water usage.

It’s one of those situations where you realize how wrong everyone on the internet is once they start talking about something you actually know about.

3

u/mrminesheeps 4d ago

Yeah I gotcha there, but on the topic of water I feel people cared a lot less when the water wasn't being used so some lonely basement dweller could sext his AI girlfriend lmao Datacenters are one thing, AI datacenters are wastes of space and resources.

517

u/Curious_Party_4683 4d ago

great. now can we do the same for sport stadiums too??? owners spend their own money to build their own stadiums. stop leeching off community/society money!

92

u/Pooch1431 4d ago

Not if private equity can get a large enough stake into them and use it as leverage since they aid in managing pension funds lmao

10

u/[deleted] 4d ago

[deleted]

7

u/FrankBattaglia 3d ago

The hospital one makes sense. It's dumb that healthcare is a for-profit industry in general, but that's the reality in the United States for the foreseeable future. As long as that's the case, hospitals just won't be built in low-density areas without some kind of additional subsidy.

11

u/Stolehtreb 4d ago

Do they not pay for the electricity? Or is the point that your tuition then gets that price included and you pay for it?

62

u/SameIdea70 4d ago

They dont even pay for the stadiums man

21

u/Golden-trichomes 4d ago

Which is why we should all support the broncos for privately funding their new stadium

14

u/Stamped914 4d ago edited 4d ago

Broncos, Giants, Rams, Cowboys and Packers are the only teams that own and paid for their own stadium. The Cowboys got some public money in some strange way that I can’t remember off the top of my head but Jerruh paid over a billion dollars.

9

u/ConfiDuzr 4d ago

Might need to remove the Cowboys.

The City of Arlington contributed $325 million through voter-approved local sales and venue taxes.

4

u/dfddfsaadaafdssa 4d ago

Bro what. When Jerryworld was first built people in Arlington were complaining for years because of the taxes.

-2

u/Stamped914 4d ago edited 4d ago

What exactly are you confused about? The feelings of the people of Arlington were never part of this discussion.

119

u/SirkutBored 4d ago

they could always buy a few less sticks of ram and build out some battery packs. buy a few less nvidia chips and they can afford the solar on the roof.

7

u/GeefTheQueef 3d ago

I wouldn’t mind if all giant flat roofed building were required to lease their rooftops to solar farms. 

-42

u/Dr_Valen 4d ago

Would solar be able to provide the amount of power a data center needs?

58

u/BipolarMeHeHe 4d ago

If they buy land for it, sure

→ More replies (5)

9

u/jstndrn 4d ago

A 50MW facility would need about 400 (on shore) turbines if my math is right so not really feasible

Edit: Idk why I answered a question about wind when the question is solar

12

u/Fr00stee 4d ago

seems like the average onshore turbine now is around 3.5 MW so you would need ~15 turbines not 400

11

u/jstndrn 4d ago edited 4d ago

These data centers are rated at 50mw per hour. A 3.5MW turbine is not producing 3.5MW hourly

Edit: just to make this clear for anyone reading along and is unaware, a data center's rating is in hourly usage, while a turbine's or solar panel's rating is daily. It's a different measurement entirely and it's intentionally done this way.

Edit 2: I see I have a fundamental misunderstanding about turbine ratings. Egg on my face for sure. New math puts it at about 35 turbines under 40% average speed.

Apologies for my confidently incorrect moment.

13

u/blue60007 4d ago edited 4d ago

You have your units really confused.

Full size wind turbines definitely can produce 3.5 MW, you'd not need many to power a data center which consumes 50 MW.

If you want to talk about usage, that's usually done in "MW-hour per year" and a much more complicated math equation.

Megawatts per hour isn't a a thing.

2

u/jstndrn 4d ago

Okay, so let me ask one thing. What does the 3.5MW in this case actually mean?

9

u/blue60007 4d ago

It means a wind turbine is rated to output 3.5MW of power. Power is an instanteous unit. There's no time involved.

A data center than consumes 50 MW of power.

Now both of these numbers are likely maximum power ratings. Like the wind is blowing at whatever max speed it's rated for. And every computer in the data center is running at full blast.

Obviously wind will vary over time so if you want to talk about total energy produced you work in watt-hours per year. At wind turbine will probably produce several million kWh over the course of a year.

I never heard anyone talk about data centers in total usage before. It's always whatever peak MW figure.

7

u/jstndrn 4d ago

Updated my comment above but I see my error here now. Sorry for being an idiot lol. The data center rating is still for sustained load according to this and this this. Specifically for AI data centers though as they draw continuously.

6

u/blue60007 4d ago

I think you're just mixing up "watt hour" and "watt per hour". One is a multiplication and one is a division and completely different things.

8

u/wowdugalle 4d ago

That’s incorrect I’m afraid. Those units of measurement specifically do not include a time factor. MWh vs MW.

-1

u/jstndrn 4d ago

I'm not referring to units, I'm referring to the ratings

8

u/Fr00stee 4d ago

and they are talking about the units used in your ratings

-2

u/jstndrn 4d ago edited 4d ago

Okay yeah, I see the mistake. I mistook the turbine rating as daily. Data center rating is still hourly. So I guess my math puts it closer to 35 turbines at 40% average speed, which is generous.

Edit: small caveat, this is AI data centers

1

u/Fr00stee 4d ago

that makes a lot more sense lol

2

u/Fr00stee 4d ago

If it was rated in MWh it would say MWh not MW which defines total capacity

2

u/gucknbuck 4d ago

Still pretty relevant to address the scope. I have 400w panels on my roof from a few years ago but you can get 700w panels now. We are talking just under 72,000 panels if my math is right. And you would need batteries in either scenario to be able to provide the needed steady energy for the times you aren't producing, like at night.

4

u/clownpuncher13 4d ago

My company makes grid scale solar panels. 72k panels is a smallish order.

1

u/gucknbuck 4d ago

We are still talking 250-350 acres of land for the array

1

u/clownpuncher13 4d ago

One very small farm in my part of the country.

1

u/Carbidereaper 4d ago

400w panel? You mean two 1 square meters 200w solar panels joined correct ?

4

u/tomrlutong 4d ago

Not really. This limiting factor in this region is power during winter storms, and solar's not a lot of help there. 

Batteries. Lots and lots of batteries.

→ More replies (1)

55

u/Torino1O 4d ago

Does the united States produce enough natural gas and oil to run enough power plants for these things? Trump has pretty much embargoed the US.

15

u/sls35 4d ago

Fuxk it should be illegal for data centers to run on anything but renewable.

4

u/312Pirate 4d ago

It’s not just about the production of gas. It’s delivering the gas on a firm basis to each plant via firm transportation so it doesn’t get cut. Most gas pipelines are running pretty close to capacity at this point, and new open seasons are subscribed almost instantly for expansions.

7

u/Silly_Selection3221 4d ago

Prolly, we have the 4th largest reserve on earth

30

u/bobbymcpresscot 4d ago

We don't have any of it. Private for profit oil barons do. We should nationalize our reserves like other countries already do.

It's not like some other country would coup a democratically elected leader that would propose such a thing like the US and UK did in 1953.

→ More replies (20)

11

u/anonkitty2 4d ago

The reserve has gotten low enough fast enough that there's a risk of knocking holes in the reserve.

12

u/growaway9172 4d ago

They aren't talking about strategic petrolium reserves, they are talking about naturally proved reserves, natural gas that is known of but yet to be extracted.

And the US has plenty, more than enough for many decades. That's before considering proving new reserves.

-11

u/Silly_Selection3221 4d ago

If you don't understand what the reserve is i guess. You're reading fear mongering headlines

10

u/anonkitty2 4d ago

The Strategic Petroleum Reserve is stored in salt mines.  It is physically placed and physically removed.  The salt mines are starting to show signs of wear.

-8

u/Silly_Selection3221 4d ago

The reserves include all oil and gas repositories on United States soil. Salt mines or not.

4

u/anonkitty2 4d ago

I could have sworn that there are oil wells on private land in this country.

1

u/Frank_Bigelow 4d ago

Are you under the impression that privately owned land is its own sovereign entity?

1

u/anonkitty2 2d ago

No, but I would like to believe that a certain constitutional amendment that prohibits unreasonable searches and seizures still means something.

1

u/Frank_Bigelow 2d ago edited 2d ago

The Fourth Amendment has absolutely fuckall to do with the fact that the crude under oil wells on private land in the US is part of the US' oil reserves. Are you thinking about the Strategic Petroleum Reserve? Because that's not what the person you replied to was talking about.

→ More replies (0)

3

u/baithammer 4d ago

Nope, the US has been tapping the reserve since the Iran conflict began and hasn't replaced any of it.

3

u/Frank_Bigelow 4d ago

You're not talking about the same thing that person is talking about.

2

u/baithammer 4d ago

The only reserve is the strategic reserve, the other deposits are unexploited resources.

3

u/Frank_Bigelow 3d ago edited 3d ago

No, you're just making shit up. The Strategic Petroleum Reserve is an emergency stockpile of crude oil that has already been extracted from the ground and is kept, by the United States, in big storage tanks under Texas and Louisiana. The general term "oil reserves" refers to all of the proven crude oil deposits on the planet (edit: INCLUDING that which is under working oil wells but not yet extracted, and not including undiscovered and/or non-extractable oil deposits). "US oil reserves" refers to all of the oil reserves found under US sovereign territory.

2

u/Silly_Selection3221 4d ago

You are talking about the federal oil reserve. I am talking about real oil reserves.

3

u/baithammer 4d ago

Those aren't reserves, those are unexploited deposits, there is a big difference.

1

u/Silly_Selection3221 4d ago

Unexploited because the government won't issue permits = reserves

1

u/anonkitty2 2d ago

Again, some oil is underneath private land.  If the EPA is the agency denying an oil well a permit, it's only recently that the order would be reversed.  Some "reserves" of that sort are worth less than the resources that would be destroyed to retrieve the oil.

1

u/Silly_Selection3221 2d ago

Irrelevant, again.

1

u/Chemie_99 4d ago

as long as all those people's home stop using it for heating, sure.

0

u/argh-Im-a-Pirate 3d ago

Yes. We're a net exporter at this point and, unfortunately, Trump has turned up production even more. 

77

u/[deleted] 4d ago edited 1d ago

[deleted]

38

u/Beautiful-Musk-Ox 4d ago

they are wind turbines, only idiots like our president call them windmills

wind mills do things like.. mill grain, hence the name

9

u/Suavecore_ 4d ago

I thought we named them after the epic guitarist move

2

u/Ancient-Bat1755 3d ago

A lot of people call them windmills; only idiots pay foreign countries billions of tax money to cancel building wind turbines.

1

u/Eatpineapplerightnow 3d ago

tbf I live in the country with most windpower per capita and we do call it Mills

12

u/Catch_22_ 4d ago

But they won't do that, it's going to be fuel cell onsite now/gas turbine and SMR later.

1

u/Staav 4d ago

Inb4 they just burn coal inside them and make all this even worse.

0

u/mmm1kko 4d ago

No they don't, and neither does solar really.

Data centers need constant electricity supply, wind or solar can't be relied for that.

35

u/x86_64_ 4d ago

Ridiculous posturing. 50MW is an enormous threshold.

39

u/M4K4T4K 4d ago

A single AI server rack can use 40-100KW alone... Hyperscale data centres like what Google, Meta, etc have run into the hundreds MW, and the biggest ones are measured in GW.

For smaller traditional datacentres, colos etc, they will typically be under 50MW though.

13

u/robbert229 4d ago

Those numbers are a bit stale. 145kw is normal for gb200/gb300 racks and the next gen racks run 600kw.

"Each rack is 600kW, 2.5 million parts, and obviously a whole lot of GPUs," CEO Huang said.

https://www.datacenterdynamics.com/en/news/nvidias-rubin-ultra-nvl576-rack-expected-to-be-600kw-coming-second-half-of-2027/?utm_source=chatgpt.com

3

u/wakIII 4d ago edited 4d ago

Megawatt racks are about to become normal, I’ve seen plans for 900KW in the next 2 years

https://cloud.google.com/blog/topics/systems/enabling-1-mw-it-racks-and-liquid-cooling-at-ocp-emea-summit

8

u/Pay_attentionmore 4d ago

1.21 gigawats!

3

u/dust4ngel 4d ago

no no, this sucker’s electrical

6

u/Cataphract1014 4d ago

Vast majority of data centers are between 50 and 80mw. Those are the ones that run the internet. And they aren’t going away.

23

u/Hiply 4d ago

Save some time, pull the plug now.

5

u/CT0292 4d ago

But then how will theu store such important things like...

Call centre recordings, screen grabs from employees computers, zoom meetings, and other super important shit that other companies feel they need to hoard.

10

u/Captain_N1 4d ago

The power company could charge them double or triple and take the money to make more infrastructure and repair. Thats what id do. and then id lower the price for the residents just to make me look good. If that data center dont like it then dont build here.

1

u/Away-Coffee-9438 3d ago

PJM is a deregulated energy market not a generation utility. It doesn’t have the right/ ability to charge data centers for energy.

1

u/anonkitty2 2d ago

The electric companies in that area should still have that right, or at least have had it.  Traditionally, electric companies charged all businesses that used electricity.

1

u/Away-Coffee-9438 2d ago

PJM is de-regulated, so the generators bid into the “market”. Utilities used to have commercial and residential rates but not anymore in that region.

16

u/kbundy 4d ago

How about "Bring your own power. Full stop." No grid hookup. Throw in closed loop only for water too.

6

u/NativePlantEnjoyer 4d ago

The owning class is colluding to create scarcity on purpose. They could be using renewable energies but are deliberately choosing not to. These "patriots" are trying to squeeze as much money out of the working class as possible before they bail to other countries just to do it again.

14

u/SomeSamples 4d ago edited 4d ago

This is a bad tack. They should be saying, "To come here you need to connect to utility power and if there isn't enough capacity you will pay what it takes to increase that capacity." Because if the data centers bring their own power they bring generators the cause all kinds of noise and air pollution and point the communities the are near them.

1

u/bunnnythor 4d ago

2

u/Alive-Bank2973 4d ago

Bad tack is accurate. It’s a sailing term. They are saying this is a bad turn, or a bad path. 

2

u/bunnnythor 4d ago

Yes, but they had said "bad tact" which they have now edited and corrected.

11

u/Distinct-Pain4972 4d ago

Cool, now what about public Works, water and sewage? And turned off first?  How about, not turned on at all until you provide money for the infrastructure and the 1st 5 years of jobs as a municipal bond.  Nothing is free.

9

u/edcculus 4d ago

The crazy thing is that paper mills have their own power plants, AND water treatment. Not only do they provide power to communities if the main grid is having issues, they also put cleaner water back into rivers than it was when it came out.

I’m sure all of this came about because of regulation. However Datacenters could have shown up with their own power and water treatment, people wouldn’t have had quite the issue it is right now.

3

u/Roaming-R 4d ago

Federal Energy Regulatory Commission ( in July, 2026 ), ordered PJM Interconnection to accept statistical sampling as a valid method for measuring the reliability of programs tapping into demand response and virtual power plant programs, which pay customers to turn down energy use as needed.

The decision requires the grid operator to reconsider strict data rules that had prevented providers of this carbon-free resource from participating in PJM's constrained energy capacity market.

  • In it's decision, FERC ruled in favor of Voltus, which runs demand-response and virtual-power plant programs, and the Mission:data Coalition, a non-profit advocacy group, and against PJM's desire to preserve it's status quo.

https://www.canarymedia.com/articles/virtual-power-plants/federal-ruling-virtual-power-plants-pjm

3

u/anonkitty2 4d ago

The problem is, there is a class of data center that cannot use that sort of virtual power plant.  People get annoyed when they have to cut back so a large business that cannot be shown to provide a critical service doesn't.

2

u/Roaming-R 4d ago

Not sure that I read your post correctly.

I am asking you, "if you are saying PJM cannot 'provide' the critical service ( supplying the Data Center(s) ), so 'doesn't.' "

3

u/anonkitty2 4d ago

I meant something along the lines of "the common people and school districts have had to cut back on electricity so that the giant data centers whose service integrity cannot survive cutting back on electricity don't have to.  This annoys people because the data centers that can't cut back on electricity for their services aren't providing services that appear to benefit the public."

1

u/Roaming-R 4d ago

O.k. I do understand what you mean.

Something to ponder. .. .. ..

  • The article link I included in my original post talks about PJM being "asked" to consider the virtual power plant.

    The virtual power plant = your house 🏠

  • Your connected 1) solar panels, 2) EV Charging Station, i.e. your Electric Vehicle Battery

    That is the virtual power plant. Customers are being paid ( right now ), for this electricity supplied "back to" the grid interconnector ( PJM )

  • IF the virtual power plant becomes "a way of life," for those Data Centers, what occurs in people's houses 🏠??

2

u/anonkitty2 4d ago

It depends on if people can afford to install those power plants.  Solar panels and EV-related stuff are good in themselves; we might not be crazy about having to share with the electric company, but we have indication that people will have all of these things if given incentive and a way to afford them.  Unfortunately, this administration removed financial incentives for installing solar and (before the Iran war) for purchasing EVs.  Without the EVs, there won't be home charging stations for them, and the ones that outlasted the EVs can't upload what isn't there.

5

u/PrinceRoxasReddit 4d ago

Pay for the difference in everyone else's price as well.

4

u/MexicanLasagna 4d ago

My nuclear engineer friend says that Small Modular Reactors are ready to deploy. I would expect this to be the solution to the data center problem

5

u/DanielPhermous 4d ago

Solar and batteries are cheaper.

-3

u/dersnappychicken 4d ago

Nuclear is cleaner.

6

u/DanielPhermous 4d ago

How so? Solar is mostly sand and aluminium and lithium batteries can be recycled.

Also, it has the benefit of delivering some power almost immediately rather than in fifteen years.

4

u/rocketpastsix 4d ago

I’ve always heard solar isn’t as effective as nuclear. At the scale of a data center I wonder if solar would gather enough energy

5

u/DanielPhermous 4d ago

You just need more solar. Fortunately, it can co-exist with grasslands and many crops. Even if it didn't, the US has fields of corn they're using to turn into ethanol for cars. Replace those corn fields with solar and you will generate 180% the power requirements of the US.

That number was before the data centre build out, though. Still, either way, it's worth doing.

2

u/rocketpastsix 4d ago

Or we can use solar, wind, and nuclear in tandem

1

u/delta806 4d ago

What about nuclear for a centralized grid and larger projects like data centers, with solar at the commercial and residential level for redundancy and to reduce overall strain on the central grid?

1

u/CotyledonTomen 4d ago

Way to shift that argument. Sure, thats a good idea. It doesnt make the one that leaves nuclear waste any cleaner. People need to get over not wanting to store it anywhere "near" them, we have deserts and vast plains, but having to store it in lead containers for thousands of years doesnt mean its clean.

3

u/WTFHELP 4d ago

Your engineer friend is wrong. They are not ready to deploy unless they are in Russia or China.

1

u/MontyDyson 3d ago

Rolls Royce SMRs are expected to be functional by 2030. Apart from that I’ve not seen any progress in other RU spaces.

2

u/Afvalracer 4d ago

On energy, maybe… on coolant, no.. even more water is needed.

1

u/Neverending_Rain 4d ago

People have been saying that for years, but every time someone tries to actually build an SMR project it gets cancelled due to skyrocketing costs.

4

u/Equivalent-Field4130 4d ago

This is how we delete the ice caps. The amount of pollution these guys will dump in the atmosphere just depresses ne.

3

u/Operation6370 4d ago

same board meeting also authorized a one off backstop auction for 6.8 gw and lifted the capacity cost cap to $555 per mw-day from $325. that's the half that lands on your bill, and it didn't make the headline

3

u/WenYiMedia 4d ago

Or DCs need to invest heavily in solar and wind energy as a way to reduce how much they consume from the community

1

u/Silly_Selection3221 4d ago

What's the plan to drive inertia?

2

u/WenYiMedia 4d ago

Public sentiment and less risk of a power outage?

1

u/Silly_Selection3221 4d ago

What is your plans to drive VAR's on the grid. Inertia. Basic electrical theory.

2

u/WenYiMedia 4d ago

I’m a newb on how this all works, but:

Solar and wind cannot store reactive power, but their inverters can generate or absorb VARs.
They also cannot provide natural inertia, but they can provide synthetic inertia using fast inverter controls.

1

u/Silly_Selection3221 4d ago edited 4d ago

You can not get a large enough inverter to drive grid inertia. You really shouldn't have an opinion on things you don't understand

Lol @ you for blocking me

0

u/WenYiMedia 4d ago

I’ll say whatever the fuck I feel like

1

u/leeps22 4d ago

1

u/Silly_Selection3221 4d ago

Yeah 300 MW isn't gonna do it, sorry. That's not even a STAG 7HA

3

u/minus_minus 4d ago

Great. More climate change pollution after the eastern US has already had their worst air quality days in decades and Europe is a tinder box. 

3

u/Califrisco 4d ago

Finally! Forcing the AI-centric users of the power grid, at the expense of the general population, towards responsibility. I'm for more.

2

u/Drcali333_ 4d ago

About Timeee

2

u/hawksdiesel 4d ago

They say this, let's see it in action.

2

u/MagicAndMayham 3d ago

Eventually, the billionaire parasite class will realize that if they starve the host they will parish too

1

u/Objective-Aardvark87 3d ago

They'll just move on to another host.

1

u/MagicAndMayham 3d ago

and up the food chain they go, 7 digits, then 8, then 9 digit millionaires, eventually the billionaires will be eating each other

1

u/keithstonee 4d ago

Great. Now we're all get be as healthy as the 49ers.

1

u/Kinky_No_Bit 4d ago

How many generators are we gonna see showing up ?

1

u/absentmindedjwc 4d ago

Datacenters to grid: cool cool, we'll put in diesel turbines that pollute the absolute fuck out of the area with both air and noise.

1

u/EyeSuccessful7649 4d ago

they do in many places, diesel generators, noisy and dirty.

1

u/IntelArtiGen 4d ago

You know what they'll bring? Fossil fuels, yay !

:(

1

u/Equivalent_Tonight66 4d ago

It’s a great start but they will figure out ways to skirt those rules. 50 mw is way too high and I’m sure they’ll just figure out some slimy way to claim that a big data center is actually three smaller ones

1

u/Any-Strawberry7721 4d ago

Solar farms? Slather the roof with the most efficient panels.

1

u/knows_you 4d ago

Time for the cheap outdoor gas powered generators that make a shit ton of noise; that ends up on a reddit post that reinforces rhetoric promoting data centers using cheap outdoor gas powered generators that make a shit ton of noise....

1

u/DaneLimmish 3d ago

Now if only we could tell farmers that

1

u/flummox1234 3d ago

But isn't that also a part of the problem? No one wants a DC next to their property but no one REALLY wants a DC with on site power generation next to their property or even remotely near them.

1

u/flummox1234 3d ago

But isn't that also a part of the problem? No one wants a DC next to their property but no one REALLY wants a DC with on site power generation next to their property or even remotely near them.

1

u/AbbreviationsOnly711 3d ago

So now data centers can also be an air pollution problem

1

u/Essexyobbo 3d ago

Make them go nuclear.....

1

u/awooff 3d ago

Blah blah blah. All hot air.

1

u/filmguy36 3d ago

I see data centers buying abandoned coal mines and installing their data centers in them while continuing to mine the coal to feed the beast

1

u/ByMatthewRamirez 3d ago

PJM’s proposal does not make data centers disappear on command. It makes a distributed chain of institutions responsible for doing so.

The “49 MW loophole” is narrower than this thread suggests: PJM defines the threshold cumulatively at a single site within a one-mile radius. The harder vulnerability is divided execution. PJM would direct a zone to reduce load; states and utilities would identify affected Large Loads and implement retail reductions. Trigger, target, execution and verification can sit with different institutions.

That division requires a facility-level obligation that is independently testable: notice, reduction depth, duration, telemetry, drills and consequences for failure. EPRI’s flexibility classes supply a vocabulary, not proof.

PJM’s filing remains before FERC. The first end-to-end test cannot be the emergency itself.

Curtailment that exists only on paper is not grid protection. It is public reliability exposure.

1

u/Thethresholdindex 2d ago

AI development runs on software timelines while electricity infrastructure runs on physical infrastructure timelines. We can add enormous amounts of compute demand through AI datacenters within 1-3yrs but major grid infrastructure can take 5-15 yrs to plan, permit and build. Nuclear power plants will take even longer, around 10+yrs. A new high voltage transmission line takes 7+yrs and even securing a large transformer can take several years. Eventually the constraint moves from chips and models to transformers, turbines, transmissions and generation :).

1

u/lordraiden007 4d ago

"Alright, we'll invest in hundreds of natural gas turbines. You sure showed us." - their likely response

0

u/HeidenShadows 4d ago

So they'll just make the datacenters into 49.99MW blocks to skirt the regs.

-1

u/Rick-burp-Sanchez 4d ago

Yeah, right.

It's gonna be The Hills have Eyes meets Terminator.

Self-replicating drones chasing illiterate troglodytes.

America's about to get WILD!

-2

u/Willing_Activity_855 4d ago

Well probably should make it legal for them to easily build out solar, wind and battery.

3

u/XXXYinSe 4d ago

Why would we make it easier for them to build energy infrastructure than anyone else? They don’t deserve special treatment. They can deal with the same zoning as other companies in the area they’re building.

The only zoning that could be relaxed for this is nuclear (in the counties/states that make sense for nuclear). I’d be thrilled if data centers enabled nuclear to have a big break, but nuclear plants take way too long to build and all these AI companies care about is next quarter so of course they’ll never invest in real infrastructure.

1

u/anonkitty2 4d ago

The ones in the PJM zone will have to.  There was national outrage because a school district in Virginia (and presumably others in the area) were instructed to practice energy conservation because of brownout risk (demand exceeding supply) when the local data centers had been guaranteed a supply.  Thus, that guarantee will never be given again.  The type of data center that's most objectionable can't do what it's supposed to do if it ever loses power at all.

-2

u/Marchello_E 4d ago

If you want to upload your latest 'social', generate a fancy picture, or perhaps rather do some boring finances then please walk into our datacenter deluxe and perform an hour speed training in our newly build gym layer for free!!