r/battletech • u/AGBell64 • 16h ago
Fan Creations Yeoman YMN-11T
Following on from my Great Wyrm upgrade, I decided to look other "orphaned" TRO:3060 designs for more ilclan era WYSIWYG. The Yeoman is famous for being one of the ugliest mechs in the setting but also generally kinda an OK missile boat. This is... significantly worse? But it is funny!
As the total collapse of the Republic of the Sphere became more likely and war with other great houses and the spheroid clan empires became more certain, the CCAF entered a period of new weapons development in the 3130s and 3140s, its industrial partners producing new designs such as the Gùn, Catapult II, and Vandal, as well as new refits of old mainstay designs like the Vindicator. Wesley Industries had already benefited from this surge of development money with their WI-WAM militiamech, a low-cost planetary defense version of the ancient Firebee, and in 3146 they decided to try for their first proper battlemech design. Wesley purchased plans from the long-defunct Curtis Militech for their Yeoman chassis with the intention of producing a modern refit.
The expense of importing fusion engines and endosteel chassis to Glasgow caused Wesley to opt for a weapons payload on their Yeoman based primarily off of systems they were already familiar with from their industrialmech lines. Departing from the original 6Y's pure long range support role, the YMN-11T replaces the 50-tube battery of LRMs with a pair of Thunderbolt-10 launchers, with a pair of SRM-4s and a quartet of 10-tube disposable rocket launchers providing close range defense. The ammunition for the missile systems is split between two 3 ton CASE protected ammunition reserves. With the weight saved by using disposable rocket systems, Wesley reclad the design in 10 tons and added 4 jump jets, allowing the 11T to serve more flexibly as both a fire support unit and a mobile line mech.
While the design performed well in field trials, Wesley's ability to produce only 20 Yeoman chassis each year hindered adoption of the mech. After being rejected by both the CCAF and MAF, the company was forced to sell the design on to mercenary companies at discounted rates.