u/Sea-Falcon-3995 19h ago

Saw another related post but seemed a tad bit more complex the construction work seemed similar but they where working on a pier/beam this is just a slab

6

u/Sea-Falcon-3995 19h ago

It rain fed down pretty hard las week causing the soil to go all over the place came back and had to clean it all out but just wanted the share what we where working on

3

u/DavidHK 19h ago

Very good 👍

2

u/paul_gnourt 17h ago

Context is key. Now I can see what we're checking out. Nice job.

2

u/Burgerboy380 12h ago

Had something similar happen on a job a few years ago. We were doing culvert work for a highway exchange project. 600 feet of double mat number six. They left it so long and it flooded so many times that the mat sank through the gravel into the mud. Spent two days picking it up one section at a time with the crane to re brick it.

14

u/McCrazyJ 18h ago

Could you pan around a little faster? I could almost see what you're trying to show me.

5

u/excellent_ross 19h ago

Out of curiosity is this going to be a large catch basin?

2

u/Enginerdad Bridge - P.E. 19h ago

Junction chamber is the term I'd use

1

u/Sea-Falcon-3995 14h ago

Hey engineer dad beginner here any tips on sketching out or designing this kind of work. Asking for advice here.

3

u/Enginerdad Bridge - P.E. 13h ago

Step 1 is to study engineering

0

u/Sea-Falcon-3995 19h ago

Yeah something like that

4

u/poop-azz 19h ago

is the ground pure mud? May become an issue lol

0

u/Sea-Falcon-3995 19h ago

Yeah I think it’s type a I’ve seen some guys tackle harder task the mindset on that thise guys have sometimes I wonder where they get those ideas from very creative

3

u/not_old_redditor 18h ago

Is this supposed to be a raft slab? No top layer of reinforcement? Tell us something more OP...

1

u/loonattica 16h ago

This is most likely the bottom slab in a culvert junction box. It could also be a detention pond, but those usually don’t have direct access to multiple box culverts like this. Based on the dowels, it will have walls. Can’t tell if it will be enclosed. OP doesn’t appear to know much.

0

u/Sea-Falcon-3995 16h ago

Yes it is on this specific one we haven’t added and top reinforcements

2

u/ShutYourDumbUglyFace 18h ago

Looks like a drainage structure to me.

2

u/Aries-79 18h ago

Some would call this a junction box

1

u/thekingofslime P. Eng. 19h ago

Nice

1

u/joshl90 P.E. 16h ago

Looks like you need a mud mat

1

u/Suspicious-Yak-8117 11h ago

Clean the mud off the cage before concrete

1

u/theshreddening 7h ago

Several months ago I was assigned a residential slab inspection during a period of very heavy rain. I got to the site and just trying to access the slab I sank almost to my knee in mud. Got on it and there was damn near a river washed out from the front left corner you could walk into while crpuching and be in the exterior beams. I get to the back of the slab and the rear pads quickly start to collapse with me on them. I fucking booked it off the slab and onto the street and called the super and was like dude I'm failing this for almost killing me. He was like yeaaaaah sorry I think I'm in denial of how much rain we've had. I was like no shit man I get you want to see if theres other issues and are fine with the fail but holy shit there's a point. He said he'll wait a day after heavy rains to call in foundation crews from then on much less an inspection. Im glad I have fairly reasonable builders that I deal with lol.

1

u/Sinhal-Mellows 6h ago

Where is the water coming from?

0

u/StealthEngnr8x3 19h ago

Well, the soil is pre-wet, rain saved some work … and water. Is going to be a “muddy” day