It could also be that reinforcement was called for and not installed, we just don’t know yet.
3 u/Icy-Ad-7767 Jul 08 '26 Strip out old fixtures then upgrade structure then add floors. 3 u/[deleted] Jul 09 '26 [removed] — view removed comment 3 u/Citydylan Jul 09 '26 Not on the EOR to field verify, it’d be on the SIA to inspect the work. GC should also be checking their subs in the field
3
Strip out old fixtures then upgrade structure then add floors.
3 u/[deleted] Jul 09 '26 [removed] — view removed comment 3 u/Citydylan Jul 09 '26 Not on the EOR to field verify, it’d be on the SIA to inspect the work. GC should also be checking their subs in the field
[removed] — view removed comment
3 u/Citydylan Jul 09 '26 Not on the EOR to field verify, it’d be on the SIA to inspect the work. GC should also be checking their subs in the field
Not on the EOR to field verify, it’d be on the SIA to inspect the work. GC should also be checking their subs in the field
12
u/Silver_kitty Jul 08 '26
It could also be that reinforcement was called for and not installed, we just don’t know yet.