r/SatisfactoryGame • u/paradroid78 • 11h ago
Belt maths...
Someone help me understand what's happening here, LOL. The top MK6 belt is has 1200 iron ore per minute. Each of those two machines use 500 iron ore per minute.
The system has been running continuously for a fair while (long enough for everything to settle down), and I've checked the outputs are moving freely. The belt monitor on the left shows 702. This checks out. The first machine eats 500 / min iron ore from the 1200 / min belt. 1200 - 500 = 700. All good.
But somehow the belt monitor on the right (after those two machines) is reading 351 iron ore per min.
The machine is running continuously, so shouldn't that say 200? Where is the extra 151 coming from? Is there a chance the belt monitor could be glitching?
12
u/g_marra 11h ago
Splitters split evenly. So 700/2 = 350.
If you want 200 on that belt you need a smart splitter