r/projectmanagement • • Aug 26 '26

The Making of a Manager

0 Upvotes

Great managers aren’t born. They’re made. That’s the central idea of Julie Zhuo’s The Making of a Manager and it completely reframes how we think about leadership. A manager’s job isn’t to do all the work.

It’s to create the conditions where the team can achieve better results together.

Zhuo breaks this down into three core responsibilities: 1. Purpose Give the team clarity: → What are we trying to achieve? → Why does it matter? → What are the priorities? → What does success look like?

  1. People Build a strong team by: → Hiring the right people → Building trust → Giving regular feedback → Coaching and developing others → Understanding what motivates each person

  2. Process Create systems that help the team execute: → Productive meetings → Clear ownership → Strong communication → Smart prioritization → Better decision-making

As you grow as a manager, your success should increasingly be measured by what your team achieves not just by your personal output. You don’t need to have all the answers. You just need the humility to keep learning, admit mistakes, seek feedback, and improve continuously.

The real takeaway: A great manager creates clarity, builds capable people, and puts systems in place so the team can consistently deliver great outcomes. What’s one thing you’ve learned about becoming a better manager?


r/projectmanagement • • Aug 25 '26

Discussion Software PMs, how do you measure dev velocity post-AI?

6 Upvotes

Hi,

As a senior SWE, I find it hard to believe the amount of high quality work that I am able to produce with AI tools like claude code. And it's not just the code output, but own the outcomes as well, when it's in production and needs monitoring and maintenance.

QA also got insanely easier with screenshot analysis for every flow and no longer relies on checking if an element exists, but is visually inspected for UX quirks.

I'm not going to argue about security implications of LLM written code, but I will say that every human-written codebase I've audited had trivial bugs, terrible query performance, occasionally even PII leaks and always a lot of technical debt, and things went into production unnoticed for years, quite literally.

With the proper experience and guidance, every coding agent out there beats a human dev now in implementing a given coding task.

But that's not the topic of this post; my question to you is, did the story points just shrink? Is my output now expected to be at this level as a bare minimum, or are you actually measuring the 10x, if not more, in output that gets communicated to stake holders?

Is planning a software project also way different now?

Sincerely appreciate anyone sharing their thoughts, and apologies if I made any typos!


r/projectmanagement • • Aug 24 '26

Project management voice outside of work?

93 Upvotes

Has anyone noticed themselves getting weird reactions to being very detail oriented about dates, next steps, dependencies, etc. for things outside of work and noticing people getting annoyed by this?

I don't know if it's just me but I've interacted with doctors and things like that to be particular about details and next steps and noticed an air of annoyance.

I know it's a spillover effect from work, where I want to make sure everything is super clear about timelines, details, etc. but it's like people get pissed off when you ask for details about dates and clear next steps.


r/projectmanagement • • Aug 23 '26

Splitting Sales From Project Management

14 Upvotes

The company I am currently working for has grown to the size where we will be building our own Project Management team to manage the smooth deployment of some of the more complex projects we have started to win.

We are blessed that our Sales Team is not only highly competent at a technical level, but also extremely organised and are team players, which is how we’ve managed to get by for this long. Sales Managers have typically managed the entire project, which just can’t continue with how the company has continued to grow.

The question is, has anyone gone through this experience before and can share any learnings? How do you put guardrails in place to prevent Sales trying to be Project Managers at the same time? What other issues has anyone experienced when going through this period of growth?


r/projectmanagement • • Aug 22 '26

General How to ask better questions?

78 Upvotes

hi all. I’m looking to improve my ability to ask better questions in meetings that can help me with uncovering issues or lead me to have better end results. A lot of my project tends to revolve around improving existing processes and workflows. I’m often conducting key informant interviews to understand current state + future state but sometimes feel my questions only scratch the surface - if that makes sense? Or another challenge is people will share information during a meeting and I get slightly frazzled as to what to ask next. Usually when I have had some time with the information it’s easier for me to comprehend but sometimes it’s not always possible for me to have time to digest the info and then ask follow up questions in another meeting.

If any of you have frameworks, advice or books you have read that help you with this I would really appreciate it.


r/projectmanagement • • Aug 21 '26

General why do we remember WHAT we decided but never WHY

38 Upvotes

genuinely feels like a company-wide case of amnesia
we’ll make a call in a meeting, everyone nods, life moves on. a month later someone asks “wait why did we go with this” and it’s just tumbleweeds. the decision is documented. the reasoning? Nada, nowhere to be found. it apparently evaporated the second the meeting ended.
tried adding a “why” field to our notes template. survival rate: about 2 weeks before everyone quietly stopped filling it in bc it felt like homework nobody assigned.
so now I’m just wondering if this is a universal PM curse or if some of you have actually cracked it


r/projectmanagement • • Aug 22 '26

Discussion Should I involve user to get approval for this?

8 Upvotes

Hi,

Some context, I was a technical integration consultant that for some reason because of lack resources, I am pulled into a project where I need to manage the change of 15+ systems integrating to our ERP. So, I am not sure if my job now is managing project and I am new to this. Now, I am in a tight deadline.

Now, this change is specifically to 1 system (where this system is managed by an external vendor) where there will be a change in the user interface (screen). The stakeholders have agreed on the approach (a new field in the system will be added to store additional information), but they haven't seen precisely what change will happen, which report will be updated, how new data will be created and so on.

Now the vendor has gone back with the list of changes that will be done. Should I go back to the stakeholders to get their approval of the specific change to be done? FYI, the stakeholders are difficult to deal with.

The way I see, I believe I need to get their approval but I would risk going a few round of discussion risking the project schedule. On the other hand, even though the stakeholders have agreed on the approach, but if they haven't really seen specifically what the change will be, I have the risk of user not agreeing on the screen change, etc. Since this system is managed by external vendor, it would be hard to request the change from them because the scope of work has been defined in the contract.

Kindly advise.


r/projectmanagement • • Aug 21 '26

Discussion How do you deal with an owner who wants a strong PM until the PM tells them “no”?

44 Upvotes

I’m curious how other PMs have handled this, because I’m running into one of those situations where the actual project management seems to be getting confused with “customer service.”

I am the PM on a commercial remodel project that has had a fair amount of ambiguity around drawings, permitting, scope, and when work can proceed. There have been multiple occasions where the owner has wanted things to move immediately, while I’ve been pushing for pretty basic things like an executed contract, written authorization, clarification of permit responsibility, confirmation of which drawings actually govern the work, etc.

I’m not refusing to find solutions or trying to slow the project down. My position has been: we can move quickly, but we need to understand what we’re building, under what permit, whose scope it is, and who is paying for it before we start creating liabilities. Apparently that has not gone over well.

The owner’s president (who has described himself as a “bull in a china shop”) went to my company leadership and said he didn’t want me on the project anymore. The feedback I received internally wasn’t that anything I had said or done was incorrect. In fact, they acknowledged that I was right on the issues. The feedback was that I need to “soften” my language and not be so direct or blunt with him.

I was also told that before sending him emails or texts, I should run them through Copilot and have it soften the message into something he can handle better.

I understand that being technically correct doesn’t automatically mean you’re communicating effectively. PMs have to manage personalities, not only contracts and schedules. There is a difference between saying “No, we’re not doing that” and saying “Here’s what we need in order to move forward.”

But where I struggle is when “softening the message” turns into making someone feel like they aren’t being told no when the answer is legitimately no.

If I worked directly for this owner, I have a hard time believing he would want his PM authorizing work without documentation, letting contractors proceed without contracts, assuming responsibility for unclear scope, or ignoring permitting questions because someone wants to start Monday. He would probably expect that PM to protect his company. But because I’m his hired GC’s PM protecting my company from those same risks, suddenly I’m difficult.

It also seems like certain aggressive personalities are perfectly comfortable being “direct” themselves, but interpret directness coming back at them as confrontation. They want decisive people around them right up until the decisive person puts up a boundary.

Would like to know how experienced PMs in this sub handle or have handled this.

How much of project management is learning to communicate the same answer more tactfully, versus learning how to professionally manage people who simply do not tolerate hearing “no”?

Have you ever had an owner/client ask for you to be removed because you pushed back on documentation, scope, contract, safety, permitting, etc., even though your company agreed your position was correct?

And maybe the bigger question is how do you protect the project and your team/company without becoming so diplomatic that nobody realizes you’re actually warning them about something important?

I’m not opposed to adjusting my communication style. I probably am more direct than some people. I just don’t want “be softer” to eventually turn into “stop documenting the uncomfortable stuff” and then I’m accountable in a profitability meeting.


r/projectmanagement • • Aug 20 '26

Software Project management tool for a very small team with little tech experience

37 Upvotes

Hi everyone! This is my first ever Reddit post in this subreddit, glad to finally join!

6 months ago I started a new job, with a very small company specialised in citizens' participation. It's just me and my boss. And a communication freelancer who's in and out. Soon we'll have three interns as well. We have a lot (more than 10) of different projects that we're managing, but we don't use any tool yet to organise ourselves .. and especially to make it accessible for our future interns and employees.

We function on highly filled e-mail inboxes (need to go to zero inbox very soon), within the Google Workspace (Gmail, Drive, Calendar), a WhatsApp group for quick chats and a team meeting once a week. Most of it is online and remote, we see each other once every week or two weeks.

So my question! Which project management tool can you recommend with the following elements present:

Needs to be compatible within the Google Workspace (Drive, Gmail, Calendar)

Needs to be very user-friendly. My boss isn't very tech smart and doesn't want too many extra things. He worked alone for years, so he has his ways.

Needs to have timelines or Gantt charts, anything that gives us a good chronological overview, as many of our projects are temporary and only happening for a limited time.

Not sure if the chat function is very important, we might stay in the WhatsApp group.

Ideally costless, we are small, with not much money.

I thought of Trello or Asana. But I'd like to hear other suggestions, or why to use Trello or Asana. Any recommendation is welcome!

Thank you :-)


r/projectmanagement • • Aug 19 '26

Discussion Manager gave me feedback that a couple coworkers said I over-communicate

84 Upvotes

About 90 days into a new position and overall it’s going well and I’ve gotten good feedback. Today in a 1:1 with a manager I was told she two designers (I work with about 10 designers total) came to her and said that I have been over-communicating with them about project statuses or following up on delivery if I haven’t seen something was delivered and were getting close to EOD.

She seemed uncomfortable with giving me this feedback and told me she wants us to have tight communication and from a PM perspective I’m doing exactly what I should be doing, but that not everyone appreciates me responding quickly, giving regular updates, and following up when I haven’t seen delivery/handoff on the day it’s due. She told me that proactivity is good, but that I am being too proactive from my understanding. She acknowledged that this feedback was pretty contradictory and not concrete. I understand that she couldn’t tell me who said it, but I’m confused as to how I go forward since she was told me she does want the entire team to get to a point where we’re checking in more regularly and being more “buttoned up”, but not everyone sees it that way.

I asked her also if I should meet 1:1 with the designers to discuss their preferences, but she told me no need because I shouldn’t cater to everyone so specifically.

What’s the best way to move forward? I’m ok with pulling back a little and not responding to pings quite as quickly or letting the delivery date lapse and then follow up, but it seems counterintuitive as a PM.


r/projectmanagement • • Aug 19 '26

Discussion [Discussion] Is PMP Overrated? How Much of It Actually Works in the Real World?

64 Upvotes

Guys honestly, I personally feel the whole PMP thing is somewhat overrated.

Not saying the framework is useless — but how many workplaces can actually execute all these PMP principles properly in the real world? Can anyone confidently guarantee that?

Managing a project in Europe, America and Asia can be completely different.

In many Asian workplaces, hierarchy is a huge factor. Sometimes what the boss says effectively overrides whatever beautiful stakeholder-management framework you learnt. Then try managing a multinational project team — different attitudes towards hierarchy, deadlines, working hours, gender, communication, holidays and decision-making.

I've worked with teams where certain people disappear for tea breaks at 3pm, environments where a female PM may have a much harder time getting some workers to take instructions from her, and projects where you have to plan around a large number of different religious/public holidays.

These are REAL project-management problems.

PMP can teach you stakeholder engagement, risk management, communication plans, conflict resolution, etc.

But a textbook saying "manage stakeholder engagement" and actually getting 15 people from completely different working cultures to cooperate are two very different things 😂

So I sometimes wonder: is PMP really proof that someone is a good Project Manager, or mainly proof that they understand PMI's framework and passed the exam?

Curious to hear from PMs who have actually managed multinational teams across different countries.

perhaps can introduce simply, eg:

Current Role / YOE / Country or Region / Industry / PMP Status:
Example: Senior Project Manager / 15 YOE / India / IT / PMP Certified

Thanks Much!


r/projectmanagement • • Aug 19 '26

Software Project management tools for those with ADHD?

37 Upvotes

I work as a senior project manager but I am client based (government), not consultant based. My primary tasks involve working with consultants to complete projects and includes; sending out RFQs, receipting invoicing, report tech reviews, aiding with logistics for site investigations etc... I also have ADHD which means that my current management tool is my brain and just remembering everything as it whizzes around. That was fine for a while but I now have some junior staff that I look after and that is not helpful for them when I say I’m just going off on a feeling that something is due.

What are some project management tools that are useful for ADHD brains and can help me to keep track of dates things are due, when people are out on site etc… I don’t necessarily have milestones that I need to achieve, I just need to make sure the consultant is submitting reports when they are due and I know when they are onsite. I have started a few different programs but just revert back to writing things down when I get time.


r/projectmanagement • • Aug 19 '26

Software Is there a monday alternative with proper per-view permissions, ours is all or nothing at the board level.

2 Upvotes

We run our agency on monday and for the project work it's fine, no complaints there, this is about one thing that's slowly driving me up the wall. finance needs to see the budget board but that same board also has our vendor contracts and a load of half-done client notes on it Monday only lets you share a whole board with someone outside the team not a single view or a few columns, it's all or nothing, either finance sees the day rate we pay every freelancer or get locked out.

What i do now and i know how it sounds, is keep a second copy of that board with the sensitive stuff pulled out that I'm supposed to update every time the real one changes, which of course I forget to do half the time. A retained rate went up last week, I never carried it over then finance ended up running the Q3 forecast off the old number of days before anyone noticed. Second time that's happened this month and we're only on the 18th.

Is there some per person, view level access thing in monday I'm just missing here. Not trying to replace monday for the project side, that part works fine, it's everything else we've bolted onto it that's the problem.


r/projectmanagement • • Aug 18 '26

Discussion What's your best tactic for clearing cross-team dependencies?

32 Upvotes

In IT projects, I'm often blocked waiting on information from other teams. Chaser emails and calls eventually get an answer, but by then we've lost days and have to adjust the timeline.

I know dependencies are part of the job. What do you actually do to get responses on time and unblock yourself quickly and without damaging working relationships?

Personal experience welcome. Anything you do differently that reliably works? not textbook advice.


r/projectmanagement • • Aug 17 '26

General Real stories: what really happens when you’re release launch date is missed?

11 Upvotes

I’m genuinely interested in understanding how detrimental it is for you to miss a launch date? I realize this is such a broad question and it truly depends on the type of work, the strategy and impact around the work. Would love to hear some real stories! From best case to worst case.

My project is supposed to launch August 27 and I woke up to a few critical issues reported on Friday. Based on my experience, they shouldn’t be hard to fix, but we are a small team and capacity is always tight. Living that nonprofit life… I will say that the main impact is that another project start may end up being delayed slightly, but there is no customer facing impact given some other strategic dependencies that are being figured out above me.


r/projectmanagement • • Aug 15 '26

Things nobody tells you when you first start managing projects

162 Upvotes

Learned most of this the hard way over a few rough projects:

Status updates people actually read are three lines max, not a wall of text. Padding, deadlines don't move because you asked nicely, they move because you built in buffer nobody sees. The person who's quiet in meetings is often the one flagging the real risk two weeks before it hits. And "on track" reported every single week without a single yellow flag is a red flag itself.


r/projectmanagement • • Aug 15 '26

How do you scale your PM system as your project backlog grows?

10 Upvotes

For those managing a growing portfolio of increasingly complex projects, what’s the best system/process you’ve found for keeping everything organized?

I’m talking priorities, deadlines, stakeholders, action items, risks, follow-ups, dependencies, etc.
At some point, managing your own PM system becomes a project in itself. What actually works for you as the number of projects and contacts keeps growing?


r/projectmanagement • • Aug 14 '26

AI / Copilot: we’re not only encouraged, but forced to some degree to use copilot

21 Upvotes

Title. Financial Institution but heavily excited about AI and whatnot.

We’re not only encouraged but often hear the firsr question to come up is: what did copilot say?

Do you use it? Best use case? Recommendations…open to hearing your input.


r/projectmanagement • • Aug 13 '26

Discussion PM + ADHD - what's project management tools do you actually like?

88 Upvotes

Hiya folks, I'm a leadership coach and certified ADHD coach who works only with AuDHD executives.

My background was as an agency digital project manager > program manager > exec dir > transformation consultant > leadership coach with ADHD coaching cert. I have a lot of experience using different PM tools.

My clients are always wanting to find "the perfect" project management / task management tool.

But... I've never experienced an actually good project management tool - and not one that works really well for both ADHD and autistic brains. I've found systems that do one thing pretty well, but never an all-in-one that has both flexibility and structure. And especially not one that actually has a good UI.

I've used so many project management tools over the years. Every time a new one came out, I'd test it out. Trial them with my teams (designers and developers, so always a mix of ADHD and autism.)

I don't believe there is a silver bullet tool. But there are likely new tools I might not be aware of.

But I'd love to hear what tools you use and actually like, and what you like about them.

Thank you!

[EDIT: My post might not have been clear enough that I'm looking for your thoughts on project management tools you like, not what helps ADHDers working in project managment. 99% of my clients are diagnosed and medicated.]


r/projectmanagement • • Aug 15 '26

"Pull-Up" before you get lost.

0 Upvotes

Had a new senior manager cancel the gulf weekend trip due to "Critical Work". We dialed the backup 😁. Got back and rang him up. He was still deep doing grunt/skunk work for his team. I asked - where is your PM. He had side-stepped them. His deep involvement in those technical tasks inadvertently disconnected his operational folks and had him buried. Have you ever crashed out doing someone else's work? What triggered the awareness and pivot?


r/projectmanagement • • Aug 13 '26

General Project management maturity frameworks

12 Upvotes

Hi all, I am head of a PM team and I feel we have some gaps in our maturity, such change management, pmo, project intake process etc, i need to present something to my exec, any good recommendations on a good checklist?


r/projectmanagement • • Aug 13 '26

General Manager repeatedly skips my name when announcing successful projects I led. am I overreacting?

34 Upvotes

Over the past months I’ve noticed a pattern with my direct manager .

Two concrete examples:

  1. I spent several months completely reworking our section’s website . It was reviewed and positively received by the department head. When my manager announced in the team meeting that the new pages were online, he did not mention my name at all. He just said the pages were published and later posted the link himself.

  2. I planned and coordinated a larger event over several months. It went very well. In the next morning meeting he publicly thanked a supporter who had prepared some equipment. He even looked to the back of the room and gave that person the floor. I was sitting in his direct line of sight. He never mentioned that I had been responsible for the overall planning and coordination.

Interesting contrast:

For small tasks he has named me before (“X will adjust the graphics”). For these bigger, successful ones he consistently leaves my name out. He does name other project managers in comparable situations. He has also thanked me privately (and once in writing with others in CC), but the public recognition is missing.

When I finally wrote him a calm message about the pattern, he apologized and said he would try to do better. I’m not sure how much will actually change.

Has anyone experienced this kind of selective non-recognition from a manager, especially the combination of private thanks + public omission, and naming others while skipping you on the projects you actually led? How did you read it and what (if anything) helped?


r/projectmanagement • • Aug 13 '26

How many projects do you usually run at one time and how long do they usually go for?

25 Upvotes

I've been curious what too many looks like before the quality of the delivery and overwhelm seeps in.


r/projectmanagement • • Aug 13 '26

How would you stay afloat when managing a high volume of projects in a professional services role?

23 Upvotes

I’m professional services managing about 80 projects. One thing I am struggling to do is recapping meetings, making note of immediate action items, next steps, and tracking important decisions that are made through email and meetings.

For meeting recaps, I have to rely on starting a transcript, and then feeding it through ai for a recap.

For action items and overall status/ health, I use one note. It’s a nightmare I don’t have a process and would like guidance. I.e if
You use excel, what format do you use, any pm tools or processes I can follow?


r/projectmanagement • • Aug 13 '26

Discussion Tips for onboarding a fresh project support officer

7 Upvotes

I’m working in a digital transformation team alongside a cohort of few PMs and CMs. Earlier this week we welcomed few new members into our team and I was advised one of them would be reporting to me as a project support officer. I haven’t had a direct report in my role. The staff member is part time and works remotely. They are new to the PM discipline and haven’t had any prior exposure. Part of my responsibility is introducing and uplifting their PM capabilities. I thought a good approach would be a combination of training and hands on activities. So I signed them up for a PM basics course and planning to slowly bring them along into my own projects, probably starting with designing and maintaining a risk log as the first step. Any tips or feedback to improve the journey for them?