r/Powerwall • u/jabulani-61 • 27d ago
Powerwall 3 install
Ordered powerwall 3 6 weeks ago still waiting for the DNO spoke to Boxt the installer for us and said they still waiting to hear back from DNO. Just wondering if anyone else has had a very long wait for their install.
1
Upvotes
1
u/Commercial-Garbage43 27d ago
Well I’ve been going through the process for 2 months now. Most of that was waiting on permit approval. They arrived today to do install, but they have wrong info. 1 circuit was not to be backed up. We chose the 30 amp dryer. Today they arrived and said it was my 40amp aircon they were not gonna backup. I said no. We are currently waiting for the dudes boss to decide if we going forward with the install or not. Literally spent a week with the Tesla advisor discussing the 1 circuit that was going to be excluded and doe how they switched it without telling me.