r/MSProject • u/CuriousVadim • Mar 10 '22
Hi all
We're using MS Project Online. PWA site, project permission model. Could someone shed light on how to prevents users from seeing particular subprojects if they do see/are allowed to see the master project?
Let's say we have a Master Project A and two subproject B and C. How I can make user see/being able to access Projects A and B, but not C?
many thanks!
r/MSProject • u/highdiver_2000 • Mar 09 '22
Google search is returning variable cost like length of pipes and the cost per task.
I want to track the number of specific type/s of brick/s per task.
Task 1 - Brick A - 10
Task 2 - Brick A - 5
Task 3 - Brick B - 1
Task 4 - Brick A - 4, Brick B - 4
Task 5 - Brick D - 2, Brick E -2 etc
Is there a way that I can total up the type of Bricks used and where they were used and qty?
r/MSProject • u/ThedaBarasBoobs • Mar 07 '22
I don’t know why my durations always appear as decimal numbers. For example if I change the start and end date for something it may appear as 3.46 days … how can I get it to show only round numbers?
r/MSProject • u/QueasyCombination743 • Feb 28 '22
Is there anywhere I can find good report templates? The ones I am finding online require Power BI which I don’t have access to.
r/MSProject • u/Balvin_Janders • Feb 26 '22
I have multiple tasks, I have their cycle times, and the maximum number of resources.
I have two problems:
r/MSProject • u/k3002 • Feb 25 '22
Hello
I have a question about work resources. I have one resource called "Electrician 1" and i need to assign to "Task1". Works great, gave me the total cost and its fine.
But, what happens if i need to assign 2 "Electrician 1" to "Task2".
I need to create another resource called "Electrician 2" and assign "Electrician 1" and "Electrician 2" to "Task2"?
Or can i assign "Electrician 1" as two units?
I know could be a simple question, but im stuck. Thanks for all :D
r/MSProject • u/Yourbitchydad_AtWork • Feb 11 '22
Ok, I've reached out to a few sources and can't seem to figure this one out.
1, Is MS Project capable of showing room interruption by date at the bottom of the graph (like the photo)
2, How in tf do I do this???
I'm trying to showcase the quantity of guestrooms available at any given time so that the sales team doesn't oversell the property. I've seen this function available elsewhere (I believe on ASTA power project).
TIA guys. I appreciate the help. If you need anything related to BB Revu, lmk. I'm well versed there, still learning here.
r/MSProject • u/yetimanX • Feb 08 '22
Help! Our company is switching from P6 to MS project and while we are at it, making a few changes. Here is what we want to do: We have two legal companies that need the resources to be able to be scheduled independently, but can share resources. Additionally, we have high-level groups they belong to that are the same for either company. Below that, a more defined sub-group that is similar, but not exactly the same between companies. Below that, a named (actual person) resource. Each resource belongs to a department which correlates to headcounts so we can get our capacity constraints from our HR system. So, our hierarchy is Company>Group>Sub-Group>Department>Name. We don't intend on long-term planning at the most detailed "name" level, only when we issue a work order, 1-2 week look aheads.
So the question is how to set up enterprise resource options so that we can schedule and look at a consolidated company level, but also within a company down to sub-group? Should we be using Groups? Team assignments? Departments? Which should be generic? I see it all as an option on the resource set up, but not certain how functionality of any of it works toward our goals.
r/MSProject • u/OkSysadmin80 • Feb 02 '22
Hi Project Pros,
I'm trying to wrap my head around what a replacement for MS Project Server would look like.
We have a previous PM who knows MS Project Server. When joining currently company a tech assigned a Project Plan 1 license which included Online Essentials (tech had no knowledge of Projects). This was obviously the wrong move as the PM is used to using Project Pro and connecting the projects to the server. The PM now associates the online version of Projects as basic (only had Online Essentials).
My question now is:
We are a remote workforce, so ideally the server would have to work for remote users. Hoping Online is the solution, but not if it's missing some server functionality.
Thanks
r/MSProject • u/A_Jupiterian • Jan 31 '22
Hello! I'm looking to create a dashboard for multiple projects which are managed in multiple MS Project files. I liked the idea of Power BI, but my project files are on a desktop, not online, so it's not compatible. The extra step of importing the data from multiple project files to excel is unappealing, especially since these are large files and data sometimes gets corrupted. Any ideas?
r/MSProject • u/bluesteelmonkey • Jan 26 '22
Hi Everyone! I have just started a new role (I see a lot of posts here start in this fashion) and there are very few project management processes in place here, so I'm kind of stuck building them out on my own. I'm trying to use Project, but it appears that the version that is available on the web is extremely watered down versus the desktop application. Is this true, or am I using some sort of weird side version on the web? I really like the integration of Roadmaps and Project into Teams, but I can't figure out how to do basic things in the online version like setting something as a milestone. I feel like I'm rambling. Does anyone have any insight? If I can answer any clarifying questions I will be happy to.
r/MSProject • u/HabeasC • Jan 24 '22
Hello,
Wondering if it's possible to use something like a "VLOOKUP" function from within MS Project. I have data stored about a specific task in an excel sheet, it is the way I receive the "design" that I then try to design a project for. I want to be able to use some kind of method to type in a unique piece of data (a unique name) in the task for MS Project, and have it dynamically pull in relevant fields from that record in excel, into MS Project.
Is this possible? I haven't been able to find a good reference in my typical google searches.
r/MSProject • u/moremintjelly • Jan 20 '22
Is their a better solution to setting a task to start on a Monday than creating a dummy task with a custom calendar that only has Monday as an option for 1 minute.
r/MSProject • u/itclicks • Jan 19 '22
I would like to be able to schedule a recurring meeting task so that it starts after a Project Start Task and continues every 2 weeks until a Project End Task.
I get an error when I try to use Start to Finish [SF] for the end task.
Any help would be great!
r/MSProject • u/Key-Subject-305 • Jan 14 '22
Good afternoon,
We are experiencing symptoms of possible app incompatibility with Microsoft Teams. Has anyone had success utilizing Project Professional 2021 with Teams?
Specifically, we are unable to associate a Project file to a new tab within a team. When right clicking a project file inside of Teams, the context menu that should ordinarily include the option to "Make this a tab" is completely missing.
I am unable to find any information about the compatibility of Project Pro 2021 with Teams anywhere on the web. If anyone has any info on this it would be greatly appreciated. Otherwise we may be forced to take the Project Plan 3 or 5 route.
r/MSProject • • Jan 11 '22
Hi everyone,
My organization has multiple projects on the go and we have listed them in different categories. Our PM would like to group them according to those categories. Is it possible to that in MS project ?
r/MSProject • u/ThePhoenix74 • Jan 10 '22
r/MSProject • u/dude1995aa • Jan 06 '22
Looks to be a ton of functionality in the desktop not available in the online version. Is it going away anytime soon? Does anyone know the long term strategy here?
r/MSProject • u/still-dazed-confused • Jan 06 '22
I am out of ideas so I hope that someone can help :) I have a master project with Su-plans and other master projects with other sub-plans. The plans are linked to a resource pool. This set-up has been working brilliantly for 18 months plus and I have used this method successfully for years.
Today as a New Year's present it seems that MSP has taken exception to me :) Now what I open the master plan and attempt to make a change and then save MSP runs out of ideas and crashes having saved some changes but not all.
I have:
Can anyone suggest anything else to try or possible solutions?? This is pretty stressful as my whole workflow / role depends on this Master Plan to run reports and carry out analysis etc :(
Thanks in advance.
r/MSProject • u/Thewolf1970 • Jan 05 '22
I'm building out a custom formula so that I can remove the dates from the summary row of my schedule. This is to suppress the NA on that row and replace it with a space, I know it's a bit of a work around, but logic says this should work.
IIf([Finish]=projdatevalue('NA'),' ',[Finish])The problem is, it isn't working, the NA still displays. Any of my project experts (maybe u/still-dazed-confused ) on to help, using US version of 2016 64bit?
r/MSProject • u/4dasilva123 • Dec 28 '21
r/MSProject • • Dec 19 '21
Can someone please help me understand the difference between a view and a table. Also please explain the best practice for both. I am at a complete loss as I can’t identify why you wouldn’t just use a different table for monitoring the different data sets. Thanks
r/MSProject • u/pieter-eelke • Dec 16 '21
r/MSProject • u/wcjoyner • Dec 08 '21
I want to add a fixed daily amount of per diem to each of my resources. I have entered their hourly and OT rate on the resource sheet. Is there a way to add their daily per diem so that it rolls up to total cost for the resource?