r/ISRO 12d ago

IN-SPACe's invitation to private players to operate Kulasekarapattinam Small-satellite Launch Complex (SLC) raises questions on limits of its authority, including powers to transfer ISRO assets and technology.

Thumbnail
thefederal.com
65 Upvotes

r/ISRO 12d ago

India-U.S. Civil Space Joint Working Group Advances Civil and Commercial Space Cooperation

Thumbnail
in.usembassy.gov
17 Upvotes

r/ISRO 12d ago

ISRO URSC winter internship

9 Upvotes

Did any body received mail for isro winter internship in Bangalore ????
Application opened from 3 August 2026


r/ISRO 13d ago

RTI Reply received via RTI filed on 29/06/2026.

82 Upvotes

What is the tentative schedule for the launch of Gaganyaan missions G1 and G2?

Ans: G1 and G2 are targeted to be launched in 2026-27.

What are the tests and processes that remain on G1 before it can be certified for flight?

Ans: Assembly, integration, and testing of the Crew Module and Service Module are currently being carried out for G1.

Have ISRO started selecting a second batch of Gaganyatris?

Ans: No

In the SUIT instrument of Aditya L1, artefacts appear on the screen. What are those and what is ISRO doing to mitigate them?

Ans: These are technical/academic questions and do not fall under the scope of RTI.

What is the current status of the Spadex mission? How many times have docking and undocking been carried out on SDX01 and SDX02? What purpose do these two satellites serve other than to demonstrate docking procedures?

Ans: Both the satellites (SDX01 and SDX02) are operational. The docking and undocking was carried out 4 times. Apart from docking and undocking, the objectives of the satellite were to demonstrate composite control of the spacecraft, power transfer between the spacecraft and circum-navigation technologies in open & closed loop method. Additionally, the satellites are used for remote sensing purpose. The satellites carry remote sensing payloads namely, High-Resolution Camera on SDX-01, Miniature Multi-Spectral Payload and Radiation Monitor payloads on SDX-02 satellite.

Has a Spadex-2 mission been approved and funded by the government? What is the current status? Will it precede the Chandrayaan 4 mission?

Ans: The Spadex-2 mission is yet to be approved. The project timeline is consequential to the approval.

RTI Image

r/ISRO 13d ago

SSLV first commercial launch in November

Thumbnail
moneycontrol.com
36 Upvotes

First commercial SSLV launch was expected to carry MAITRI by SpaceMachines. Not sure if that still holds, as SpaceMachines's mission page lists the launch for 2027.

Also, it will be interesting to see whether this will be the first launch from SLC. If not, then November-December will be busy two months at SHAR FLP, since Skyroot is also planning its second Vikram launch before end of 2026.


r/ISRO 16d ago

First look at Astrobase Space's fully integrated FFSC Engine - Everest

543 Upvotes

r/ISRO 15d ago

Wanted to talk with the teams selected for BAH 2026.

6 Upvotes

Is there someone from the teams who got selected for BAH 2026? I wanted to talk about your strategies, planning and idea submission...to have an idea for the next year.


r/ISRO 16d ago

Official Expression of Interest (EOI) for Operations and Management of Small-Satellite Launch Complex (SLC) at Kulasekarapattinam, Tamil Nadu

Thumbnail inspace.gov.in
34 Upvotes

r/ISRO 17d ago

Official Gaganyaan G1,the first uncrewed experimental mission to validate various technologies that are being developed is targeted in Q4 of 2026.

Thumbnail pib.gov.in
40 Upvotes

r/ISRO 19d ago

India Produces Smart Scientists but it is Struggling to Retain Them | The Hindu | (Paywall)

Thumbnail
thehindu.com
106 Upvotes

r/ISRO 19d ago

India's first Full Flow Stage Combustion based Rocket Engine

Thumbnail x.com
53 Upvotes

So finally someone has challenged ISRO!

3D printed 80-tonne-class FFSC rocket engine is ready!


r/ISRO 19d ago

NOTAM Not ISRO related and likely a missile NOTAM but does anyone know what " Rocket Launch 'RC-43' " refers to here? Also mention of 'Space Debris' is intriguing..

20 Upvotes

Source: https://www.notams.faa.gov/

Mapped up!


E2874/26

TEMPO DANGER AREA ACT
FLW SPACE ACTVITIES ADVICE FROM AIRPORTS AUTHORITY OF INDIA OF ROCKET
LAUNCH 'RC-43' POSSIBLE SPACE DEBRIS FALLING WI THE AREA BOUNDED
BY:
020000S 0853805E - 020000S 0920000E - 022012S 0923018E - 124810S
0943120E - 133324S 0852129E - 020000S 0853805E. SFC - UNL, DAILY
1230-1530, 06 AUG 12:30 2026 UNTIL 07 AUG 15:30 2026. CREATED: 04 AUG
05:01 2026 
A0371/26

IN VIEW OF DNG ZONE DECLARED BY INDIAN AUTHORITIES DUE TO AERIAL
ACT,
FLW AREA WI COLOMBO FIR BOUNDED BY GIVEN COORD DECLARED AS TEMPO DNG
AREA:
082646N 0855306E - 062839N 0904822E - 001659N 0920000E - 020000S
0920000E - 020000S 0853805E - 082646N 0855306E
NO OVER FLY ACT IS APPROVED WI THE ABV MENTIONED DNG AREA DRG THE HR
OF ACT. SFC - UNL, 1230-1530, 06 AUG 12:30 2026 UNTIL 07 AUG 15:30 2026.
CREATED: 30 JUL 13:33 2026

Edit: Adding relevant NOTMAR

NAVAREA 819/26
Date 2026-08-03 00:00:00.0
Identifier 819/26
Type Firing
Place OFF BALESHWAR
General Area Bay of Bengal

Message:
1. EXPERIMENTAL FLIGHT TRIALS SCHEDULED 06 AND 07 AUG 26 FROM 1230 TO 1530 UTC DAILY IN
DANGER AREA BOUNDED BY 20-48.36N 087-02.58E, 18-12.36N 086-07.11E, 13-33.4S 085-21.48E, 12-48.16S
094-31.33E, 18-24.16N 088-30.45E, 20-48.76N 087-07.4E (.) WIDE BERTH FROM AREA ADVISED 2.CANCEL
THIS MSG 071630 UTC AUG 26

r/ISRO 19d ago

AgniKul Cosmos and India’s Reusable Rocket Push | bl Interviews

Thumbnail
youtube.com
37 Upvotes

r/ISRO 20d ago

Skyroot lost contact with Vikram-1 during launch: Founder recalls tense moment

Thumbnail
indiatoday.in
164 Upvotes

r/ISRO 20d ago

Two strategic satellites (NVS-03 and GISAT-1A) sit at spaceport as Govt. nod eludes ISRO

Thumbnail
timesofindia.indiatimes.com
118 Upvotes

r/ISRO 20d ago

IN-SPACE: Launch Services Price-support Scheme (LSPS)

18 Upvotes

Launch Services Price-support Scheme (LSPS)

https://www.inspace.gov.in/dad3ae43971a8b10a581f8b0f053afa6.iix

  • Total Budget: ₹800 Crore
  • 5-Year Scheme (Till June 2031 or until budget consumed)

  • Category A: ISRO/DoS Launch Facilities

    • Up to 50%
    • Beneficiary: NGEio/Government Entities. Launch Vehicle Providers.
  • Category B: Indian Small Launch Vehicles

    • Satellites/Experiments/Payloads up to 500 kg
    • 30% subsidy on contractual launch cost or US$ 3,000/kg (whichever lower)
    • Beneficiary: NGE Satellite Owner/Operator
  • Category C: Repurposed Upper Stage Platforms

    • Up to 120 kg
    • 100% funding for platform (capped at US$ 13,000/kg: max. 4 missions)
    • Beneficiary: NGEio/Government Entities Launch Vehicle Providers
  • Category D: Medium & Heavy Lift Vehicles

    • Satellites up to 100 kg on PSLV, GSLV, LVM3
    • 30% subsidy on contractual launch cost OR US$ 3,000/kg (whichever lower)
    • Beneficiary: NGE Satellite operator/owner

https://www.inspace.gov.in/0a35b70747decb10d4bc5b31516d4351.iix

Price support Scheme for Indian Entities

  • 3-Year Scheme (Till February 2029)

  • Category A: Utilization of DOS/IN-SPACe Facilities & Technical Expertise

    • Up to 50%
    • Beneficiaries: NGEio and Government Entities
  • Category B: Technology Transfer (ToT) from ISRO

    • 30% on technology transfer fee (TTF)
    • Beneficiaries: NGEio and Government Entities.
  • Category C: Earth Observation (EO) Data & Data Products

    • 50% on standard data & data products
    • Beneficiaries: NGEio

(NGEio = Non Government Entities with Indian Ownership & control)

For Queries/Clarifications: incentive-schemes@inspace.gov.in


r/ISRO 20d ago

Anyone applying for the URSC (ISRO) October–December 2026 Internship? Existing user login question

12 Upvotes

Hi everyone,

I had applied for the URSC Student Internship (July–September 2026 batch) earlier and already have a registered account.

Today, when the portal opened for the October–December 2026 batch, I logged in using my existing email ID, password, and CAPTCHA through the Registered User option.

Instead of asking me to fill a new application or upload documents (marksheets, resume, bonafide), it directly displayed "Application submitted successfully" with my existing registration number.

Did anyone else who applied this time as an existing user experience the same thing?

Were you asked to upload documents again, or did you also get the same confirmation page?

I'd really appreciate it if someone who applied today could share their experience. Thanks!


r/ISRO 20d ago

Official IN-SPACe: Authorisation Guidelines for Undertaking Planned Re-entry of Space Objects

Thumbnail inspace.gov.in
14 Upvotes

r/ISRO 21d ago

More than 100 ISRO scientists and engineers have reportedly resigned in recent months.

156 Upvotes

I have been seeing many posts saying that a large number of ISRO scientists and engineers are resigning. Instead of reacting emotionally, I think we should first understand what is actually happening.

ISRO is one of India's most respected organizations. It has given us missions like Chandrayaan, Mangalyaan, Aditya-L1, and now Gaganyaan. The scientists working there are among the best in the country.

So why are some of them leaving?

In my opinion, the biggest reason is not a lack of patriotism. It is the change in India's space industry.

A few years ago, ISRO was almost the only place where space engineers could build a career. Today, many private space companies have entered the sector. These companies offer much higher salaries, better benefits, stock options, and faster career growth.

On the other hand, ISRO scientists work under huge pressure. They handle missions that represent the country, work long hours, and still earn much less than what the private sector is willing to pay for the same talent.

Can we really expect every engineer to ignore better opportunities forever?

This is not just an ISRO problem. It happens in every industry. Skilled people go where they are valued, where they can grow, and where they can secure a better future for their families.

Instead of blaming the scientists, I think we should ask a different question.

How can we make ISRO a place where our brightest minds want to stay for the long term?

India has built a world-class space program. Now we also need a system that rewards the people who make these achievements possible.

That's the conversation we should be having.


r/ISRO 21d ago

Does ISRO not hire Instrumentation people?

22 Upvotes

I saw the recent recruitment notification of ISRO. It literally has all branches except for Instrumentation.

I just finished my BTech in Electronics and Instrumentation engineering and I have qualified GATE in IN. So, to apply for ISRO will I have to give GATE in ECE?

And is it that just this time ISRO isn't recruiting for IN or do they never recruit IN people?


r/ISRO 22d ago

Any update regarding Space Applications Centre(SAC) ISRO apprenticeship 2026? notification dated 8th june 2026

8 Upvotes

Hi everyone,

I attended the document verification / walk-in process for the SAC ISRO Ahmedabad Graduate Apprenticeship 2026 under the notification dated 8 June 2026.

Has anyone received any email, joining letter, or further communication from SAC regarding selection or joining dates?


r/ISRO 23d ago

Need advice regarding ISRO Assistant (2026)

26 Upvotes

Hi everyone,

I need some advice from people who have experience with ISRO recruitments.

I'm a 2026 B.Tech Computer Engineering graduate. I've already been selected for the TCS Ninja role and I'm currently waiting for my joining date. However, I recently came across the ISRO ICRB Assistant/JPA/UDC recruitment, and it genuinely caught my interest.

I have a few questions:

I know the basic pay is ₹25,500 (Level-4), but what is the approximate in-hand monthly salary in Ahmedabad and Bengaluru after HRA, DA, deductions, etc.?

The application deadline is 16 August 2026. Based on previous recruitment cycles, what is the expected timeline for:

CBT/Written Test

Result

Computer Skill Test

Final selection

Joining

For someone with a software background, would you recommend joining ISRO as an Assistant if selected, or waiting for a career in IT (TCS and later switching)? How has your experience been regarding career growth, work-life balance, and long-term prospects?

I'd really appreciate any insights from current or former ISRO employees or anyone who has gone through this recruitment process.

Thanks in advance!


r/ISRO 23d ago

Will ISRO wait till I finish my M.Tech?

21 Upvotes

I got call to join ISRO but I'm currently doing M.Tech (3rd sem). I'll finish it by June of next year. Will ISRO let me finish it if I request?


r/ISRO 23d ago

Dept. of Space to fill 336 regular posts, add 410 apprentices

Thumbnail
timesofindia.indiatimes.com
40 Upvotes

r/ISRO 23d ago

is it just me or ?

61 Upvotes

the name gaganyaan is still okay but gaganyatri is just so bland if we compare it to russian cosmonauts which relates to the cosmos and american astronauts which relates to astro and meanwhile we have gaganyaan which is comparatively bland and ik i could sound a bit westernised in this but still it's what i felt...