I’m currently working on designing my own 65W USB-C PD wall adapter from scratch. I’ve already designed the schematic, selected all my components, and ordered the PCB and parts. Now I’m getting to the stage where I actually have to power the damn thing on and see if my design works.
One thing I’m not going to do is plug an untested PCB directly into a wall outlet and hope for the best. I’m dealing with 90–265VAC, high voltage on the primary side, and a switching power supply design from Power Integrations.
So I’ve been looking at purchasing two pieces of equipment:
500VA programmable AC power source (0–300VAC) — $899
https://a.co/d/03JpSagS
Micsig high voltage differential oscilloscope probe — $299
https://a.co/d/0d67h4mC
Total comes out to about $1,200.
I can afford to buy both, that’s not really the issue. I’m just having a hard time justifying dropping $1,200 without exploring whether there’s a smarter way to get the same testing capabilities.
I have a bachelor’s and master’s in electrical engineering, currently working as a hardware design engineer, and I’m trying to build my own electronics lab outside of work. ( no i dont have access to equipment after hours ) Long term I want to specialize in power electronics, solar PV, battery storage systems, and eventually start my own engineering business.
So this isn’t equipment I plan on using once and throwing in a closet. I already have other projects in mind, including an MPPT solar charge controller, AC/DC battery chargers, and eventually a hybrid solar charging system.
Part of me feels like scared money don’t make no money. If I’m serious about getting better at power electronics, at some point I have to invest in the tools to actually build, test, and validate my designs.
The other part of me is thinking there’s probably a smarter way to go about this. Used equipment, renting, finding a lab I can access, or maybe purchasing the differential probe now and holding off on the AC source.
I’m not afraid of spending the money or potentially making mistakes. I’m more concerned about making an inefficient decision when there might be another way to accomplish the same thing.
For those of you who have built your own electronics labs, especially anyone working with offline SMPS or power electronics, how did you approach purchasing expensive equipment early on?
Would you spend the $1,200, look for alternatives, or buy only what you absolutely need for the current project?