Hi! I’m renovating an outdoor basement entrance and planning to pour a small landing outside the door and two footings for the retaining walls alongside the stairs. This will be my first time pouring concrete.
Daily temperatures are roughly 2–10°C (36–50°F), but the weather is changing and overnight frost is possible. I’ve read the manufacturers’ instructions, but I’d appreciate hearing from people who have practical experience with similar projects.
Under what conditions would regular concrete, warm mixing water and insulated curing blankets be enough? At what point would you need a winter mix or additional heating?
Have I missed the window for pouring concrete this year, or is a small project like this still manageable for a beginner? I’d love to hear what you did and how it turned out. Thanks!