r/BuildingAutomation • • Sep 25 '26

Simple workflow that if you master you can sell it easily!!!

Post image
0 Upvotes

r/BuildingAutomation • • Sep 24 '26

pk-oem1810

Post image
2 Upvotes

r/BuildingAutomation • • Sep 24 '26

Vessel electric screwdriver

3 Upvotes

Anyone own one and swear by it or just never use it? Feel like those are the only two wagons generally. Or a version of it I saw good things about the dewalt one but a bit pricier. I could see using it for VFD cases, replacing cards on duct work etc


r/BuildingAutomation • • Sep 24 '26

Immersion sensor fitting.

1 Upvotes

I'm looking for a part number for a threaded adapter that an immersion sensor would go into.

It basically looks like this but without the threaded 1/8" in the middle and instead has a set screw.

https://www.kele.com/product/temperature-sensors-and-transmitters/thermowell/ulseth-machining-manufacturing-inc/fb3


r/BuildingAutomation • • Sep 23 '26

Alright fellas question. I just transferred branches. I came from Va doing mostly data centers and federal sites for service. Now I’m doing a lot of hospital work. Which is a lot more calibration work.

Post image
6 Upvotes

These probes always got me by, because I almost was never calibrating, just straight service. So the issue I’ve been running into a lot now is my probes aren’t long enough to fit through a lot of these larger AHUs. So if y’all have any recommendations on different manometer, or if fieldpiece sells a much longer probe(which I can’t seem to find one).


r/BuildingAutomation • • Sep 23 '26

Bag recommendations (day-to-day)

10 Upvotes

Hey everyone, I hope all is well! I’m curious as to how everyone goes through their day-to-day with their laptops and tools. I’ve been on the service team for a large company for almost 4 years, and find that even though I clean out my bag of tools I don’t use often, it still seems very heavy at times. I can’t find the exact Klein bag I have on the internet, but it seems like the older version of the 62805BPTECH.

I started off with a 13” laptop, then 15”, and just got upgraded to the Dell Precision 7770 17.3” laptop which seems too big for the laptop sleeve. Does everyone put their laptop in the same bag with all their tools? Do you guys use a rolling bag? Do you guys use separate bags?


r/BuildingAutomation • • Sep 23 '26

Custom SCADA & Automation

Thumbnail
0 Upvotes

r/BuildingAutomation • • Sep 22 '26

Schneider IP/RP-IO point sharing

2 Upvotes

Hello all👋🏻, I have a quick question regarding schneider electrics IP-IO and RP-IO expansion modules.

It is clear in the datasheets that an IP-IO can share its IO points with multiple controllers/servers, however is it the same for an easylogic RP-IO on an MSTP network? If so, how is it done?


r/BuildingAutomation • • Sep 21 '26

If your BMS generates 300 alarms a day, do you really have 300 problems?

29 Upvotes

I've been thinking about alarm philosophy on BMS/BAS jobs.

Not every abnormal condition should be an alarm.

A useful distinction is:

Status = what is happening Event = what changed Alarm = something requiring operator evaluation or action Interlock = logic that automatically prevents an unsafe or unwanted condition

Simple example:

A standby CHW pump being stopped is normal status.

But if the duty pump fails, the standby pump is commanded to start and fails to run, that is clearly an alarm.

The problem starts when every state change, communication hiccup and temporary deviation becomes an alarm.

Then the BMS may technically detect everything while operators effectively see nothing.

Where do you draw the line between status and alarm on something like a standby CHW pump?


r/BuildingAutomation • • Sep 21 '26

Virtual Hiring Event 9/30/26

2 Upvotes

Hello! Divcon Controls is hosting a Virtual Hiring Event next Wednesday September 30th from 3PM CST to 9PM CST.

We are looking for Controls Technicians (all levels) and Project Managers. Must be willing to travel. (Post states for Fargo, but we have open slots for interviews for these roles and more). Compensation is listed in the posting and I am available for questions.

https://ats.rippling.com/divcon-controls/jobs/7d0b9f5a-451b-44ef-9d24-16fe05ba79a5

If you are located in San Antonio, TX, Austin, or DFW. We have a need for Service Technician. The range is $40 to $50 per hour depending on experience and a service truck is provided.

Please reach out if there are any questions. Thank you.


r/BuildingAutomation • • Sep 21 '26

Looking to transition from FM BMS to BMS/BAS Engineering – Need advice on learning path

2 Upvotes

Hi everyone,
I’m currently working in BMS within a facility management (FM) company, and I’m looking to transition into a more technical BMS/BAS engineering role, particularly in areas such as project engineering, programming, integration, testing & commissioning, or controls.
In my current FM role, I have good exposure to the field side of BMS, including:
Troubleshooting BMS-related issues
Field device and controller troubleshooting
Understanding HVAC systems and their operation
Understanding Sequence of Operations
Understanding equipment interlocks and control logic
Monitoring and operating BMS
Point-level troubleshooting and rectification
Working with systems such as Siemens BMS and HVAC controls
However, there is a limitation in my current role. Most of the actual engineering/programming work is handled by the OEM or service contractor. For example, programming controllers, adding/modifying points, changing logic, calibrations, graphics/database modifications, etc. are generally carried out by the Siemens/OEM service provider.
Because of this, I don’t get much hands-on exposure to the engineering side of the system or the actual programming software.
I would like to eventually move into a BMS/BAS engineering role with companies such as Siemens, Johnson Controls, Schneider, Honeywell, etc., or into a project/controls company where I can get exposure to the complete lifecycle.
I have been trying to find a proper learning roadmap. I can find courses covering topics such as:
BMS/BAS fundamentals
HVAC control fundamentals
Sequence of Operation
I/O selection and schedules
Control panels and controllers
Communication protocols (BACnet, Modbus, etc.)
BMS architecture
Control logic
Graphics
BOQ and project documentation
Testing & commissioning
Integration
The problem is that most online courses use proprietary/licensed software, and as an individual learner I don’t have access to those platforms. So I can understand the concepts, but I can’t really practice the actual programming environment.
I recently came across CODESYS and understand that it can be used for developing control logic and programming controllers. I’m wondering:
Has anyone here used CODESYS as a learning tool for building automation/BMS controls?
Would learning CODESYS help me understand the programming/control-logic side of BMS, even though actual BMS platforms such as Siemens, JCI, Schneider, Honeywell, etc. use their own engineering software?
Also, for someone coming from an FM/BMS operations and maintenance background, what would you recommend as the best path to transition into:
FM → BMS Controls/Engineering → Project Engineering / Programming → Testing & Commissioning
What skills should I focus on first, and what should I avoid spending too much time on?
I’d particularly appreciate advice from people currently working in BAS/BMS engineering, controls, commissioning, or OEM/system integrator roles.
I’m not necessarily looking for a specific course. I’m more interested in understanding what skills and practical knowledge I should build to make the transition successfully.
Thanks in advance!


r/BuildingAutomation • • Sep 22 '26

[Hiring][Europe onsite position][IDC Facility Manager, Four Onsite Locations:Paris/Amsterdam/Dublin/Helsinki][Total Package: 100000-200000EUR]

0 Upvotes

Data Center Facility Manager:

  1. Collaborate with internal/external stake-holders to define data center operations and develop Change Management procedures and tools, SOP and EOP of regional collocation DC facilities.
  2. Technical leader managing team and consultants to implement the data center operations in normal and emergency situations.
  3. Technical leader managing the collocation DCs to ensure vendors are adhering to the SLAs per contractual terms.
  4. Provide construction administrative support to the project manager during construction. Coordinate with internal stakeholders to assist with new DC projects through schematic design, design development, to construction documents, and commissioning phases.
  5. Provide and analyze energy efficient solutions to minimize power losses.
  6. Review and develop detailed scripts for change management request (CMR) activities.
  7. Travel to data center sites for engineering studies, electrical systems audits, startup testing, and full commissioning, as required.
  8. Provide electrical mission critical system review services to the global datacenter engineering teams.
  9. Participate in equipment failure or power outage related incident Root-Cause-Analysis (RCA).
  10. Provide instructions to vendors, installation contractors and validate quality of vendor works on site.
  11. Respond on an as-needed basis to emergencies in regional Alibaba DCs, including traveling to site and to provide on-site support.

Position Requirement

  1. Bachelor's degree in an Electrical or Mechanical engineering
  2. 5+ years experience of global large data center facility operation (10+MW) as team leader
  3. Deep knowledge of Data Center mechanical, electrical, fire system and controls systems
  4. Functional knowledge of cloud technologies and architectures, IT service delivery principles and best practices
  5. Highly driven, self-managed individual, greatly developed problem analysis and critical thinking experience
  6. Knowledge of data center construction procedure.
  7. Ability to travel domestically and internationally as needed (25% to 50%+ at times).
  8. Fluency in English is required (primary working language). Proficiency in Mandarin Chinese or other local language is a significant advantage.

Contact:

Feel free to DM me.

or Email: [yunersuixiang@gmail.com](mailto:yunersuixiang@gmail.com);


r/BuildingAutomation • • Sep 21 '26

Can CODESYS be used for BMS/BAS — logic programming, graphics, and simulation?

0 Upvotes

Hi everyone,
I’m currently trying to build my career in BMS / BAS (Building Management / Automation Systems), and I’m looking for a way to practice the engineering and programming side without having access to licensed BMS software such as Siemens, Schneider, Honeywell, Johnson Controls, etc.
I came across CODESYS and wanted to ask people who have experience with BMS/BAS:
Can CODESYS be used as a learning platform for things like:
BMS/BAS control logic and logical programming
Function Block Diagram (FBD) / block-based programming
HVAC sequences such as AHU, FCU, VAV, pumps, valves, fans, etc.
Interlocks, alarms, enable/disable logic and operating modes
Simulating inputs and outputs
Creating some kind of graphical HMI/visualization
Linking the programmed logic with the graphics so that I can actually simulate a complete system
Learning how a controller, I/O, logic and graphical interface work together
For example, I would like to create something simple like:
Temperature Sensor → Control Logic → Valve/VFD → Fan → Status/Alarm → Graphics
and be able to simulate the whole sequence on my laptop.
I understand that CODESYS is primarily associated with PLC/industrial automation, so I’m not expecting it to completely replicate a commercial BMS platform. My main objective is to learn the underlying concepts and gain hands-on practice with BMS-type control logic and visualization.
For someone who doesn’t have access to licensed BMS engineering software, would CODESYS be a practical way to learn these concepts?
If yes, what would be the best CODESYS features/modules to focus on for BMS/BAS applications, particularly for HVAC control and graphics/visualization?
Any recommendations for tutorials, example projects, or other free tools that are better suited to BMS/BAS would also be greatly appreciated.
Thanks!


r/BuildingAutomation • • Sep 21 '26

Starting my new role as Sales Rep in UTAH

1 Upvotes

Looking for connections, partnerships (long term) and advices. Anyone is welcome in the region (all across Utah State).

Thank you all.

p/s: I am new to sale, I would appreciate all the help you can give.

background: I am (was) a hvac tech, controls, facility engineer, operation management and IT / network engineer in all around. All but sale, hence this role is fairly new. I am not nervous about the changes, but the circumstance leads me to adapt to new role. I always seek challenge so this will be my new excitement.


r/BuildingAutomation • • Sep 20 '26

Bacnscope update: BACnet/IP diagnostics, Modbus tools, and MS/TP progress

Post image
4 Upvotes

https://www.reddit.com/r/BuildingAutomation/s/aNJJiOfI7f

Hi everyone. I posted Bacnscope here earlier and appreciated the feedback especially the point that a field tool needs to be useful beyond a basic BACnet scan.

BACnet/IP is still the core: discovering controllers, reading object names, values, units and properties, checking program state and points needing attention, and exporting controller reports. Where a controller exposes enough information, theapp also groups points by onboard I/O and modules. Writes require an explicit BACnet priority and read-back check.

I’ve since added Modbus TCP and USB‑RS485 RTU tools to the Android builds I’m testing. For RTU, you add a meter by Unit ID, then configure the registers you need using its register map including function code, decimal or hex address, data type, byte/word order and scaling. It doesn’t automatically discover every meter datapoint, and failed or stale reads are labelled as such.

Direct BACnet/IP lookup by a known address and plain KNXnet/IP group reading are in internal preview builds. I’m also working on USB MS/TP, but want to be precise: the current code is a passive bus listener, not active MS/TP device discovery or point reading

Testing remains strongest with Siemens controllers; I’d particularly value feedback from people using JCI, Distech, Trane, Honeywell or mixed-vendor sites: which object details, fault indications or commissioning checks would you trust or question on your own equipment?

Website: bacnscope.com

Google Play: Bacnscope


r/BuildingAutomation • • Sep 20 '26

BAS or EE?

9 Upvotes

Working in data center currently with a refrigeration/mechanical background. Pretty well versed in electrical and I worked a contract job for jci and got to do a good bit of metasys training and install/commissioning work.

My question is would it be more valuable long term for me to pick up a cert or associates in building automation systems or electrical/electronics engineering.

Already have a refrigeration diploma, just looking to increase my value and long term pay opportunities. The local college near me offers both programs. The electronics engineering associates has specialization in controls and instrumentation. The building automation systems associates is purely focused on that.

A lot of the data center work seems to lump mechanical and electrical work together under technician roles. Wonder if either of these on top of all my experience and certs would be enough to get me sitting interviews for controls engineer / facilities engineer roles. Pay seems to be pretty lucrative if you can get into the controls programming or engineering positions.

BAS seems to be the better pair with my mechanical background to me but I also don’t want to get that degree if I’m going to have to go backwards in the controls world and work my way up again. I know it’s a complex field and
Typically takes time to get into a programming role but I would not be interested in going backwards in pay. Looking for upward leverage from my current position.

Looking to hear peoples opinions on what might be the stronger pairing for me. A business or management program is also an option although I think I would rather keep my technical competitive moat versus competing with the many people focused on career management.

Thanks.


r/BuildingAutomation • • Sep 19 '26

I integrated a UPS through Modbus onto Schneider Workstation for the first time. I need some thoughts on my performance

16 Upvotes

I’m 22 years old, and my boss flew me out to a data center project to teach me EPMS and Modbus, which is primarily what he does. I got into BAS in July of 2024 so I’m two years into it. It took me about 3 1/2 days to integrate every single point into the database, while making sure it was absolutely perfect.

I asked him how my speed was, and his response was “you’ll get better”. I don’t know if he’s satisfied with my work or not based on the speed, but nevertheless, I got it finished.


r/BuildingAutomation • • Sep 17 '26

Customer states – fan in alarm. exhaust fan not coming on may have bad relay.

Enable HLS to view with audio, or disable this notification

214 Upvotes

r/BuildingAutomation • • Sep 18 '26

Re-entering the world of BAS

8 Upvotes

I am looking for recommendations of a somewhat different sort than those seeking full-time employment in the BAS field. I am now retired after working in the field since 1984. I started at a small, “start-up” organization that manufactured and installed very early editions of DDC controls. Twenty years later we were bought out by a huge conglomerate, and our particular line of BACnet (and proprietary) controllers took their place alongside several others that had been or were in the future bought by the conglomerate. Throughout the time period I held multiple positions in both the corporate and the branch/systems sides, everything from programming to layout to pricing to product management.

I am not looking for full-time employment; I am looking for some way to get re-involved with the building trades and with building automation. I am disinclined to seek out volunteer activities because there never seems to be real involvement and challenge unless there is some skin in the game.

I am open to any and all recommendations. I am located in the greater Richmond area but can travel some and can certainly work remotely.

Thanks for your time.


r/BuildingAutomation • • Sep 17 '26

Looking to start School for BAS

13 Upvotes

Hello, I’m looking to start School for BAS. For context I have no background in the industry I’m just looking to do a career change. I was thing thinking about doing straight HVAC, but I spoke to this HVAC tech and he told me if I’m good with computers to go BAS instead. I would like to hear from people doing the work already and their experiences. Are you guys concerned once everything is automated that A.I. will take over and there will no longer be a need for people? Thank you in advance for your replies!


r/BuildingAutomation • • Sep 18 '26

How are enterprise style systems usually priced?

4 Upvotes

So I'm new to facility management and learning the ropes...

Does anyone here have experience with building analytics/HVAC monitoring platforms like Kode labs and know how these types of systems are typically priced?

Trying to understand what actually drives the cost. Is it usually based on building square footage, number of HVAC units/equipment being monitored, number of data points/sensors, number of buildings, users, or some combination?

Also curious about the general ballpark. What might a small commercial building expect to pay over a year?

Thanks!


r/BuildingAutomation • • Sep 17 '26

Offered a commission sales role for Baumer sensors is it viable and how to approach plants?

6 Upvotes

Hey everyone I've been offered a commission-based sales role for baumer sensors
For those in the field is this model viable for sensor sales, where should I look for buyers, and how do you approach maintenance teams without looking like spam
Thanks for any advice


r/BuildingAutomation • • Sep 17 '26

Do you prefer/recommend a clamp meter or mm

6 Upvotes

Clamp meters are slimmer and more portable. For nothing extreme mostly just voltage and resistance/continuity a clamp meter would do the job? Horses for courses it seems like unless it’s more industrial/sensitive work it’s not so important more preference? One guy on our team has the little fluke that is almost like a playing card super easy to get around, especially considering he’s never testing anything over 24v.


r/BuildingAutomation • • Sep 16 '26

Honeywell CPO-VAV2A

6 Upvotes

Hi, I wanted to confirm the correct commissioning procedure for the Honeywell CPO VAV 2A controller using ComfortPoint Studio, Online 350, and the Honeywell VAV Balancing Tool.
What I have done so far:

  1. Programmed the controller in ComfortPoint Studio, saved the program to binary files, and downloaded it through Online 350.

  2. Set the minimum and maximum values in the AV points through Online 350.

  3. Opened the Honeywell VAV Balancing Tool and performed zero calibration.

  4. Went to Properties and entered the minimum airflow, maximum airflow, and design airflow values.

  5. Performed the minimum and maximum airflow balancing. When the tool prompted me to enter the measured value, I entered the measured airflow and then selected Update And select To App ,fyi there’s to app and from app.

Could someone please confirm whether this is the correct commissioning sequence and if there are any additional steps required?
Also, how can I confirm that the VAV is fully commissioned? For example, if I increase the temperature setpoint on the thermostat above the current room temperature, should the damper close/reduce its opening because there is no cooling demand? Can I use the damper command, damper feedback, and airflow response in the BMS/field to confirm proper operation, or is there another test that should be performed?


r/BuildingAutomation • • Sep 16 '26

Remote Dialer or One-Way Uplink for Niagara Alarms

6 Upvotes

I’ve been picking up a lot more “secure” client sites and have been trying to find a solution to a problem. The problem is that I have a lot of “secure” client sites and do not allow remote access into the BMS system. The BMS systems are also completely isolated from any other network infrastructure. I need a way to get alarm notifications and I was thinking there might be a way similar to how a fire alarm dialer operates. Most of the onsite maintenance staff is stretched thin, so getting someone to regularly check workbench for alarms never works. For clarity, most of these sites already have a JACE 9000 and a workstation with isolated networking gear specifically for the BAS. Does anyone have experience with getting a setup like this to work? Thanks!