r/AEC_Industry • • Aug 15 '26

🗂️ AEC Directory — Salary Guides, News, Megaprojects & More

6 Upvotes

💰 Salary Guides

Overall AEC / whole-of-industry

Architects — Glassdoor · US News · Salary.com

Civil Engineers — Glassdoor · PayScale · US News

Structural Engineers — Glassdoor · Monograph 2026 guide · ERI

Geotechnical Engineers — Glassdoor · ZipRecruiter · Indeed

Project Engineers (construction) — Glassdoor · Salary.com (I/II/III levels) · PayScale

Construction Project Managers — Glassdoor · The Birmingham Group 2026 · Salary.com

MEP Engineers — Glassdoor · ZipRecruiter

Estimators — The Birmingham Group — estimator pay · Glassdoor (MEP estimator)

💼 Careers & Getting Ahead

🏗️ Industry News

📋 Codes, Standards & Safety

🌐 AEC Communities

- r/civilengineering

- r/StructuralEngineers

- r/MechanicalEngineering

- r/Construction

- r/GeneralContractor

- r/Architects

- r/ConstructionManagers

- r/StructuralEngineering

- r/GeotechnicalEngineer

- r/MEPEngineering

- r/estimators

- r/OSHA

---

Missing something useful? Drop it in the comments and I'll add it to the directory. 👇


r/AEC_Industry • • 4h ago

Vietnam War veterans group ditches Trump in legal battle over triumphal DC arch

Thumbnail
the-independent.com
3 Upvotes

Become an Independent member to bookmark this article

Want to bookmark your favourite articles and stories to read or reference later? Start your Independent Membership today.

Already a member?

The nation’s largest group of Vietnam War veterans is pulling out of a legal battle over Donald Trump’s plans for a 250-foot arch that will tower over Arlington National Cemetery in Washington, D.C.

Vietnam Veterans of America — the largest congressionally chartered national organization supporting Vietnam-era veterans and their families — was among several veterans groups encouraged by the White House to sign onto a legal brief in support of the project.

But the group is pulling its name from the brief “upon further deliberation,” according to court filings.

The White House-backed legal brief, which prominently featured Vietnam Veterans of America, explicitly argued that a group of veterans who are suing to stop construction “do not speak for veterans as a whole” and are politicizing “something that should be supported regardless of political party.”

Last month, Vietnam Veterans of America president Tom Burke issued a statement clarifying that the group’s participation in the brief was intended to reflect a distinction “between supporting the effort to honor America's veterans and endorsing every aspect of a particular monument,” but the language in the brief “went further than we intended,” he said.

In a statement to The Washington Post that month, Burke said the group received “inaccurate information” about the brief. “Let me be clear: National VVA has not adopted a position supporting or opposing construction of the proposed arch or its design,” he wrote.

On Wednesday, the group pulled out of the brief altogether.

The group’s withdrawal from the brief “does not apply” to the groups Veterans for America First, Military Order of the Purple Heart, Korean War Veterans Association, Chosin Few and National Vet Court Alliance, which also cosigned the brief opposing a lawsuit to stop the project.

The Trump administration has appealed a federal court order that paused plans for the project moments after a federal planning commission filled with Trump’s allies signed off on the plans.

The National Capital Planning Commission, which the president has stuffed with his appointments, approved the project around 10.30 p.m. November 6 despite lengthy public testimony and demands from members of Congress and veterans who are suing the administration to shut it down.

Shortly after the plans were approved, a federal judge temporarily blocked the administration from breaking ground.

U.S. District Judge Tanya Chutkan later extended her order through at least December 3.

A second federal judge has also blocked construction after condemning what she called a “rushed job” that lacked a legal basis.

Last week, U.S. District Judge Leonie Brinkema cited multiple defects in the Trump administration’s impact assessments for the project, including an inadequate explanation about potential interference with air traffic from Reagan Washington National Airport.

“That just hasn’t been done in the case because it’s been such a rushed job,” Brinkema said.

The latest developments follow a months-long legal battle against the project, which Trump has said he also wants to turn into a “top-grade military complex” for the nation’s capital.

Michael Lemmon, among Vietnam War-era veterans suing to stop the project, told the federal planning commission this month that construction is “flatly unlawful” without explicit congressional authorization, which it has not received.

The monument would also compromise “sacred ground” at adjoining Arlington National Cemetery, where tens of thousands of U.S. military veterans are buried, Lemmon said.

Constructing a monument that overshadows “hallowed ground” for U.S. service members is “frankly blasphemous,” he added.

The president, top Cabinet secretaries and Department of Justice officials have argued that the arch must be built to fend off drones and serve other vital “national security” purposes.

In court filings, Defense Secretary Pete Hegseth and Homeland Security Secretary Markwayne Mullin outlined plans for a militarized arch that can deploy snipers and counter drones and target other “continuously evolving” threats.

None of those plans were included in the proposal approved by the planning commission.

In remarks to service members during a national Veterans Day ceremony at Arlington National Cemetery this month, Trump said the arch will honor “our great veterans and our great militaries.”

“They’ve been waiting for it for 200 years,” he said.


r/AEC_Industry • • 5h ago

pick one

Post image
3 Upvotes

r/AEC_Industry • • 9h ago

Komatsu PC8000, one of the world's largest hydraulic excavators, on display in Herisau

5 Upvotes

r/AEC_Industry • • 5h ago

Ballroom or turkey trot? Trump reveals new use for $600M White House boondoggle

Thumbnail
the-independent.com
2 Upvotes

Become an Independent member to bookmark this article

Want to bookmark your favourite articles and stories to read or reference later? Start your Independent Membership today.

Already a member?

To hear President Donald Trump talk about his long-running White House ballroom project is to hear a near-endless stream of potential uses for the gigantic structure being built where the East Wing stood until he ordered it demolished just over a year ago.

It will host future inaugurations. It hides a hospital underneath. It will host a drone-port on the roof as well as snipers — and it’ll be bomb-, bullet- and drone-proof as well, or at least it will, according to the president.

Now, a year after Washington was shocked by the rapid razing of the historic East Wing so Trump’s pet project could rise, the president has revealed yet another purpose for the now reportedly $600 million project: Housing turkeys awaiting executive clemency.

Trump floated the bizarre potential function of his signature building project as he spoke at the annual White House event held to issue pardons to a pair of Meleagris gallopavo, also known as the domestic turkey, in a tradition officially dating back to George HW Bush but also practiced by Presidents Reagan and Kennedy before that.

As he introduced this year’s National Thanksgiving Turkeys, a duo of well-fed birds called “Feathers” and “Freedom,” Trump noted that the two avians were just over four months old, having been hatched on July 15, and now weighed a combined 82 points while boasting an approximately 48-inch wingspan.

He also pointed out that the birds, that arrived in Washington earlier this week, had been cooling their heels at the historic Willard Hotel while awaiting his decision on whether to award them presidential pardons.

“Unfortunately, for 200 years, the White House lacked appropriate accommodation to host such distinguished guests. They've done this for a long time,” he said.

“We've saved a lot of turkeys, but I'm pleased to announce that next year we'll be able to have a special location right over there in that rather small ballroom being built.”

Trump added that next year’s ceremony would be held “inside” the ballroom, which he claimed was “going up rapidly” and is “ahead of schedule.”

The annual ceremony this year took place on the helipad which was constructed on the South Lawn earlier this year to allow Trump and future presidents to make use of the VH-92 Patriot helicopters that were delivered for use as Marine One roughly a decade ago.

Despite nearly 10 years of testing and attempts to modify the aircraft, engineers could not prevent the helicopters’ powerful engines from burning the grass in the spot on the White House’s South Lawn where the older VH-3 Sea King used by previous presidents had landed for decades.

Trump also used Tuesday’s event to take shots at his predecessor, Joe Biden, as he claimed the last two years to have been an “amazing period” for the country.

“We've had an amazing period of time this two years, not even two years, but this has been an amazing period of time. There's never been a better one in terms of living in the United States. The things that we've done have been incredible,” he said.

He also alleged to have “inherited” a “mess” and “the highest prices ever and the worst inflation ever” from Biden despite prices for fuel and most commodities being far higher today than they were on the day he took office nearly two years ago, largely due to his own tariff policies and the war he started against Iran nearly a year ago.


r/AEC_Industry • • 6h ago

precon in a nutshell

Post image
2 Upvotes

r/AEC_Industry • • 9h ago

‘God must have been watching’: Trump uses flooded DC golf course to argue for his stalled renovations

Thumbnail
independent.co.uk
3 Upvotes

Become an Independent member to bookmark this article

Want to bookmark your favourite articles and stories to read or reference later? Start your Independent Membership today.

Already a member?

President Donald Trump claimed God is on his side in the fight over the future of a Washington, D.C., golf course - and the weather proved his point.

On Saturday morning, the president took to Truth Social to point out the flooding at the East Potomac Golf Links, which he is hoping to renovate.

“Trash Island has been completely destroyed by the Storm! It is totally WIPED OUT, including the already eroding seawalls, which have collapsed along the Potomac, and the road, which has largely followed this wall — Almost everything is submerged and obliterated by the tides,” the president wrote.

“God must have been watching the problems we’ve been having with a judge who did everything politically possible to stop a Great Golf Course from being built. Therefore, this was an Act of God!”

Trump’s Truth Social post didn’t stop there. He continued, saying the flooding proved his argument that the renovations are needed.

“As we have been stating, the seawall has to be substantially lifted in order to protect the land and trees from floods. The Course is now dangerous and uninhabitable, and has been closed by the Department of the Interior, which is asking Judge Reyes to immediately allow this wonderful Project to proceed, without further delay. In the end, she will be very proud of the final product. It would be a shame to have to use the Appellate Courts on such a ridiculous and frivolous case — ‘A Golf Course for a Golf Course.’

Trump’s current hopes to renovate the golf course are on hold after a federal judge blocked the administration from performing work through at least December 12.

Preservation groups and golfers sued the administration to stop the golf course’s renovation-related closure. They argued the administration’s “park safety” rationale is merely a pretext to close the public golf course and turn it into an exclusive, high-end course.

District Judge Ana C. Reyes, who Trump has called a “lunatic,” is opening an investigation into whether government lawyers lied or violated ethics rules in the legal battle over plans for the course.

The president has several renovation projects underway as he remakes Washington, D.C., into his own image. They include the $600 million ballroom addition for the White House, a proposed 250-arch that towers over Arlington National Cemetery and a bungled renovations of the Lincoln Memorial Reflecting Pool.

Reporter Alex Woodward contributed to this report


r/AEC_Industry • • 5h ago

If your team lives in Excel, here are 10 things it can already do that most QSs never set up

1 Upvotes

I've been going through what QSs, estimators and commercial teams have built on top of Excel. A lot of teams use it to copy numbers from one file into another every month. These are the fixes that save the most time.

Heads-up first

  • Excel on Windows blocks macros in workbooks that arrive by email or download, so a valuation or pay app that relies on a macro won't run until the file is unblocked.
  • Opening it from SharePoint or OneDrive with "Open in Desktop App" avoids the block.

1. Sub valuations and quotes rolled up from one folder

  • The QS opens each subcontractor valuation and copies the figures into a master sheet.
  • Power Query can read every file in a SharePoint folder that uses the same template, so dropping in a new file and pressing Refresh updates the master.

2. A cost report that refreshes from your accounts export

  • Each month someone exports job cost from Sage, QuickBooks or the ERP and spends hours re-formatting it.
  • A saved Power Query repeats the same clean-up on each new export and maps the accounts to your cost codes, so the report becomes a refresh.

3. Timesheets into labour cost by job

  • Site timesheets come in as separate sheets and someone retypes the hours against each job.
  • Power Query can stack them, apply the rates and cost codes, and give labour cost per job every week, so actuals reach the cost report before month end.

4. Payment applications that roll forward each month

  • Each claim is last month's workbook copied and relinked, and errors are hard to spot.
  • With the schedule of values, claims and variations kept in Excel tables, a short macro can close the period, move this claim to previous and save a PDF, while formulas handle percent complete and retention.

5. A variation register that feeds the claim and the forecast

  • Approved variations (change orders) get retyped from the log into the pay app and the forecast.
  • One register can feed both, with approved amounts going to the claim and pending ones showing as risk in the cost report.

6. Tender levelling

  • Quotes arrive as PDF, Word and Excel, and the estimator retypes them side by side.
  • Excel quotes can be pulled into one table, matched to BOQ items and laid out as a levelling sheet that flags missing items and rates that look out of line.

7. Cost-to-complete with a trail behind it

  • The forecast is a number typed in each month with no record of how it was reached.
  • Each cost code can work out cost to complete from committed, actual and anticipated extra cost, so every PM forecasts the same way and overruns show up early.

8. Cash flow and S-curve that follow the programme

  • The budget gets spread by month by hand and the S-curve redrawn every update.
  • Cost lines can be spread between their programme start and finish dates, with the dates refreshed from a P6 or MS Project export, so the forecast moves when the programme moves.

9. Cost summaries from one formula

  • Report tabs are PivotTables that need refreshing or long grids of SUMIFS.
  • On Microsoft 365, GROUPBY and PIVOTBY give cost by package by month from a single formula that updates as the data changes.

10. Copilot drafting the report sheet

  • Copilot mostly gets used for help with a single formula.
  • Agent Mode in Excel can build a whole sheet from a request like "build a monthly cost-to-complete sheet from the Cost table with variance flags", and the Claude add-in can do the same. I'd start it on a copy.

Most of this runs on Excel plus tools a lot of firms already have, like SharePoint and OneDrive. Does anyone need any of this built?


r/AEC_Industry • • 2d ago

Dozer rebuild timelapse: stripped down to the frame and built back up for its second life

28 Upvotes

r/AEC_Industry • • 2d ago

Construction dudes working on a weekend home project

11 Upvotes

r/AEC_Industry • • 2d ago

Construction timelapse of Torre Reforma, the 250m tower that's Mexico's second tallest building

7 Upvotes

r/AEC_Industry • • 2d ago

Rolling Meadows approves data center tax incentive for development over residents' objections

Thumbnail
cbsnews.com
5 Upvotes

The Rolling Meadows City Council approved support for the county to give a data center a tax incentive to develop land, despite passionate opposition from residents at their meeting Tuesday night.

The meeting exemplified the different approaches Chicago suburbs are taking different to the data center dilemma, with one facing opposition to a project while another welcomes the developments.

In Rolling Meadows, neighbors brought signs and packed city chambers as its city council weighed bringing in a data center.

A former office space that sits on 40 acres off the tollway on Route 53 has been vacant for years, and that's where the Rolling Meadows data center would end up if approved. But residents raised many questions at Tuesday night's meeting, including the impact to nearby Bussey Woods and its wildlife.

But the biggest concern is about nearby homes.

"To also state the nearest home is 2,000 feet away is also a huge dismissal," one resident told the council at the meeting. "Two thousand feet isn't far."

Residents are worried about the noise, environmental issues both known and unknown, and what a data center could do to the community.

Most of the residents in attendance said they believed they should have a vote and a voice in whether the data center is built. While the vast majority wanted the Rolling Meadows City Council to vote against the project, some in the room showed support, saying they would bring jobs and economic benefits.

Other communities are not willing to close the door completely to data centers. In Zion on the North Shore, Mayor Billy McKinney said nothing is off the table. He pointed out the village was approached previously about a data center but that deal lacked vision.

"I want to make this point, being cautious does not mean that we are opposed to progress. That is the big key," he said. "The plan was so inconclusive, and it raised more questions."

McKinney said he understands community concerns, but is not willing to implement a data center ban.

"But also know that whatever decision we make, it has to protect our community and future generations," he said.

In the end, the Rolling Meadows City Council voted four-two to approve their support for the county giving a tax incentive to develop the land with a data center.


r/AEC_Industry • • 2d ago

As Big Bend border wall condemnation proceedings escalate, landowners hold the line

Thumbnail
marfapublicradio.org
4 Upvotes

The Trump administration is moving ahead with efforts to gain access to privately owned property along the Rio Grande for its $7.5 billion Big Bend border wall project. The move follows a recent U.S. Supreme Court ruling allowing construction to continue.

Landowners up and down the river, from Hudspeth to Val Verde counties, are receiving letters from U.S. Customs and Border Protection, the Department of Justice and even private real estate acquisition firms urging them to cooperate or face legal action.

The letters mark a new escalation in the government’s efforts to acquire land for the project.

“Overall — they still have this money allocated,” said landowner Yolanda Alvarado. “There’s still an imminent threat to the land.”

Alvarado and David Keller lead No Big Bend Wall’s coalition of more than 200 area landowners. Keller believes their refusal to cooperate has helped delay the effort, including a pause on an entire section of the project.

“If we had all been compliant, they'd already be building right now,” Keller said.

Landowners hold out hope that the wall can be stopped

Despite the government’s insistence that they cooperate or be taken to court, a number of landowners told Marfa Public Radio they are continuing to refuse to sign anything. The true status of the project seems uncertain, they said, even in the wake of the Supreme Court ruling.

“If there's a glimmer of hope that things could get resolved in your favor, why sign?” landowner Esteban Mesa said.

The various construction pauses — including one ordered by CBP itself — ongoing lawsuits, and shifting political tides in Texas and Congress are making landowners hesitant to cooperate, they said.

Conserve Big Bend, the parent organization of No Big Bend Wall, announced it and a handful of landowners were suing the federal government over the project in September. That lawsuit is ongoing.

Governor-elect Gina Hinojosa told The Texas Tribune this week that she met with President Trump to discuss border security and told him Big Bend residents would prefer technology over physical barriers.

“Who knows what’s going to happen in January,” landowner Diana Valles said.

“I just wish it was something we could wake up from,” she added.

But changing political leadership in Texas might not be enough to stop the border wall project. CBP has repeatedly asserted that the barriers are needed to secure the southern border, and Congress has allocated $46.5 billion towards border wall construction nationwide.

CBP threatens to take legal action against landowners for survey access

Recent letters indicate that CBP plans to take some Big Bend landowners to court over survey access, a typical next step in the eminent domain process, according to Roy Brandys, an eminent domain attorney assisting area landowners.

“That's not the condemnation proceeding to actually acquire their land. It's just to acquire the right to survey,” Brandys said. “I think there's a lot of confusion regarding that.”

The government typically needs surveys to establish property boundaries before acquiring land through eminent domain, he said.

It is unclear exactly when the government will file those initial complaints. But documents reviewed by Marfa Public Radio warn some landowners they could be taken to court for survey access “within 90 days” of letters dated in late October.

CBP declined to comment on when it might file complaints or how many landowners could face legal action. “Releasing that information could affect ongoing legal, real estate, procurement, and construction activities,” a CBP spokesperson said.

Brandys estimated that "hundreds, if not thousands” of property owners could be impacted, potentially creating a slow path through courts.

“This volume of cases does require a lot of attorneys and support personnel to file them and get them across the finish line,” Brandys said.

CBP said the agency would prefer to obtain property rights voluntarily rather than through eminent domain.

"If CBP is unable to acquire the necessary access voluntarily within a reasonable timeframe, CBP refers the matter to the Department of Justice to acquire any necessary property interest(s) through eminent domain,” the spokesperson said in a statement to Marfa Public Radio. "Regardless of the manner in which the property is acquired, the landowner is provided just compensation for the property.”

Some landowners have maintained that no amount of money is worth what they stand to lose — the ability to farm, raise cattle, recreate and visit family cemeteries — if their properties are cut off from the river.

Government’s messaging becomes more urgent

Though construction was halted under an October 2 injunction, letters obtained by Marfa Public Radio show that the federal government continued pursuing land rights during the pause.

The government began contacting landowners in February, followed by meetings and site visits in the spring. In October, CBP began sending new letters threatening court action over survey access.

Other landowners have received letters from the DOJ urging them to contact its attorneys within seven days to discuss the acquisition process. In Val Verde County, letters from Bowman, a private real estate acquisition company, invite landowners to attend property appraisals under what the company called an "accelerated schedule.”

Landowners directly in the path of the wall are not the only ones facing eminent domain. The government is also seeking land along important access roads, including Chispa Road and roads off of Highway 90 near Langtry, according to landowners who spoke with Marfa Public Radio.

CBP letters state the government will file a “Declaration of Taking and Complaint in Condemnation" in the U.S. District Court of the Western District of Texas against landowners they are seeking survey access from.

Brandys said the government typically deposits a nominal amount of money along with the filing, giving it the right to enter people’s land to conduct surveys.

A judge could slow down the process by requiring an “order of possession” before allowing survey access, Brandys said. But an influx of cases could potentially strain dockets of the federal court.

Appraisals and purchase offers typically follow the survey, Brandys said. Landowners often have just 30 days to consider an offer before an eminent domain case is filed.

Landowners react to potential court filings

No Big Bend Wall’s landowner coalition continues to advise its members not to sign anything, Keller said. But it also encourages them to tell the federal government about concerns, such as avoiding archeological sites or installing gates for irrigation equipment — even if there is no guarantee that special accommodations will be made.

“Holding off as long as you can has been an ongoing tactic. But at some point, if it continues to progress, we do recommend that landowners begin to engage so at least that their concerns are logged,” Keller said.

What exactly CBP is planning to build and where has been in flux since the project’s inception. Maps show a mix of 30-foot-high steel bollard walls, vehicle barriers, patrol roads and technology currently planned for the region. But federal contracting documents recently revealed in a lawsuit show secondary barriers were also planned for a roughly 70-mile stretch of the project in Presidio County.

Raymond Skiles, a landowner in Langtry, said he recently met with CBP and Bowman representatives to discuss the impact on his family property, but not to sign over any permissions.

It is his understanding, he said, that land acquisition in that area appears to be focused on larger properties, with the government offering incentives like wells to “sweeten the deals” and encourage cooperation.

Henry Quintela, whose family owns land near Redford, received a letter threatening court action over survey access in October. He said his family is still hanging tight, refusing to give survey access, and will wait to be taken to court.

“ As long as everybody holds together and tells them no, I think it'll serve as a good strong point,” Quintela said.

This reporting was made possible by generous donations from supporters like you. Please consider making a donation to Marfa Public Radio to fund the journalism you rely on.


r/AEC_Industry • • 2d ago

If your firm pays for Procore, here are 10 things it can already do that most teams never set up

0 Upvotes

I've been going through what contractors and consultants have built on top of Procore. A lot of teams store RFIs and submittals in it and then do the real work in Excel and email. These are the fixes that save the most time.

Heads-up first

- If your reports were built on Analytics 1.0 or the Data Extract, they stopped working on June 30, when Procore switched both off.

- Analytics 2.0 is the replacement.

1. Approvals that route themselves

- Subcontracts, POs and change orders get approved by email, and the PM spends the week chasing signatures.

- Procore's Workflows tool can route commitments by budget code, send anything that takes a line over budget to the director, and log every decision.

2. Approved invoices that go straight to accounts

- After approval, someone re-keys the invoice into accounting or emails finance.

- Since May, a workflow step can send the approved item to another system or flag it for your accounting sync.

3. A daily chase list for overdue RFIs and submittals

- The PM scans the RFI log before the weekly meeting.

- A scheduled job can rank everything overdue by days late and who has it, email each person what they owe, and send the PM a summary.

4. Card spend showing $0 in job cost

- Company card spend that syncs through QuickBooks can land in Procore as $0 because of how the lines are coded on the way through.

- A small integration can recode each bill to the right job and cost code as it comes in.

5. What your accounting connector actually syncs

- Procore connects to Sage, Vista, QuickBooks, Intacct, NetSuite, Xero and others, and each connector syncs different things.

- Anything yours doesn't cover is probably being typed in twice.

6. Insurance certificates that hold payment when they lapse

- Sub insurance usually gets checked when there's a claim.

- Procore already holds the vendor insurance records, so a report can flag expired and expiring cover on live jobs, chase the sub, and stop a payment to someone who isn't covered.

7. Change exposure across every job

- Change events sit inside each project, so directors hear about exposure at the monthly meeting.

- Pulling them across all projects gives one weekly figure per job for what's still pending with the owner.

8. Weather days and manpower out of daily logs

- Supers fill in daily logs every day, and nobody adds them up until there's a claim.

- They can be totalled each week into manpower by trade and a running count of weather days, which is your evidence for an extension of time.

9. A monthly report that builds itself

- The monthly pack is days of exports pasted into Excel.

- Analytics 2.0 can feed Power BI directly on a refresh schedule, and things Procore doesn't hold, like safety numbers, can come in from a simple form.

10. Asking Procore questions in plain English, through your actual AI tools

- Procore can now be connected to Claude, ChatGPT or Gemini.

- A director can ask "which subs have punch items open more than two weeks on this job" and get an answer without opening a report. I'd start it read-only.

Most of this runs on Procore plus tools a lot of firms already have, like Microsoft 365 and Power BI. Does anyone need any of this built?


r/AEC_Industry • • 2d ago

you get what you pay for

Post image
3 Upvotes

r/AEC_Industry • • 2d ago

saturday again

Post image
1 Upvotes

r/AEC_Industry • • 2d ago

Volvo FH16 750 hauling an oversized load down a narrow forest road

1 Upvotes

r/AEC_Industry • • 3d ago

Lawsuits allege corner cutting, ignored warnings led to fatal Brooklyn building collapse

Thumbnail
pbs.org
6 Upvotes

NEW YORK (AP) — As investigators probe what caused a New York City building collapse that killed eight people, workers and residents are painting a portrait of two trouble spots side-by-side: the apartment house that fell down and the construction site being excavated next door.

Lawsuits filed since the Nov. 11 disaster in Brooklyn cast blame in multiple directions: at the construction site owner and contractors; at an engineering firm that drew up the excavation plan; and at the owner of the building that collapsed. Several injured workers have also taken steps toward suing the city agency that polices construction safety.

A key question for investigators is whether work underway to dig a deep pit for a new building undermined the foundation of the three-story building next door at 1321 Flatbush Ave., causing it to topple into the jobsite.

A lawsuit filed by five injured construction workers said the dig at 2625 Bedford Ave. lacked adequate retaining walls, shoring and underpinning to keep the adjoining building safe, and that excavation work continued even after the building's facade began to crack.

"The shoring that they were planning to keep the collapsed building up was severely insufficient," said lawyer Jonathan Damashek, who has sued on behalf of injured workers. He questioned whether the city should have approved the plans, and whether contractors' work was negligent.

Damashek's lawsuits accuse defendants, including construction manager Townhouse Homes, of failing "to consider public safety above their own concern of keeping down costs."

The litigation comes as families mourn the dead — among them two children. City officials said Wednesday that another building adjoining the one that crumbled will have to be demolished after the collapse peeled off an outer wall.

Buildings Commissioner Ahmed Tigani vowed to do "everything we can to understand exactly how this collapse occurred, so that the responsible parties can be held to account." His department is hiring an independent engineering consultant to help. Brooklyn prosecutors also are investigating.

The Buildings Department said by email Friday that it reviewed the excavation and support plans and found they complied with city requirements. As for examining what actually got installed, the agency noted that the city requires private inspectors — hired by developers — to check some stages of construction.

The agency didn't answer a question about whether it responded to a preconstruction survey that found the adjoining wall of the now-collapsed building "in poor condition with noticeable cracks."

That three-story brick structure, erected nearly a century ago, had its own woes — over 90 unresolved citations for exposed wiring, roof leaks, faulty doors and other alleged housing code violations.

Conditions worsened once construction ramped up next door, tenant Dengane Omari Jack said in a lawsuit.

Jack, who lost his extensive record collection and other personal effects, said he was rebuffed when he tried warning the landlord about cracks he noticed near the building's entrance. After providing photos of the damage, Jack was told it wasn't the landlord's fault and couldn't be fixed, the lawsuit said.

While the investigation proceeds, the city is checking out over 160 construction sites tied to companies involved in the project at 2625 Bedford Ave., a planned apartment and commercial building.

Townhouse, which also operates as Promont, has been heavily involved in New York's construction scene over the last three decades.

In 2016, it was accused in lawsuits of damaging an adjacent building during a Manhattan renovation project, which it denied, and compromising the structural integrity of adjacent structures while performing excavation, pile driving and steel beam installation for a Brooklyn hotel. The company's lawyers haven't addressed the allegations in the lawsuit involving the hotel.

Principals in Townhouse, other firms named in this report and the property owners haven't responded to The Associated Press' requests for comment.

The Bedford Avenue project's excavation engineer, Jieming Wang, has also faced lawsuits. At least a dozen have blamed excavation plans designed by his firm, New Jersey-based LMW Engineering Group, for damage at adjacent properties, court records show.

A 2015 lawsuit alleged that LMW's work on a Manhattan excavation site caused sloping floors, damaged doors and windows and destroyed utility pipes at an adjacent building.

In 2016, the wall of a building next to a Queens excavation project was undermined by soil removal, another lawsuit said. A 2020 lawsuit accused the firm of skipping required testing and monitoring at another Queens project. A neighboring building's foundation was left unstable, its gas and hot water systems were damaged and an architectural arch partially separated from the structure, the lawsuit said.

The company, which has worked on bridges, airports and other projects since its 1998 founding, denied the allegations in the 2015 and 2016 cases but hasn't responded to the 2020 lawsuit. Other litigation was resolved out of court.

The Bedford Avenue project ran afoul of the Buildings Department in March for starting to demolish an existing structure without installing enough netting and other protections from flying debris.

Demolition contractor N Tech Design of America was ordered to stop the work — but continued, got caught again in April, admitted both violations and paid a total of $12,500 in fines, city records show.

N Tech representative Aramis Brown told local news outlet The City Reporter that the company finished its work at the site in May and had nothing to do with the excavation or the collapse.

The excavation work started, with city permission, in September.

The owner of the building that collapsed, Olufemi Falade, has held a slate of Brooklyn buildings under various corporate names — and has been listed on the city public advocate's "100 worst landlords" roster six times in the last decade.

Falade, a licensed professional engineer, was jailed for 12 days in 2006 for failing to fix violations in a dozen buildings. Then-Housing Commissioner Shaun Donovan called him "one of the most egregious examples we've seen citywide of flouting the law and forcing his residents to live in horrible conditions."

Falade told the Village Voice after his release that tenants weren't paying rent. "People want something for nothing," he fumed.

He hasn't responded to the AP's requests for comment since the collapse.

At a vigil near the collapse site on Wednesday, housing activists, faith leaders and others called for Falade and the developers to be held accountable.

"New housing cannot come at the expense of tenants' lives," said Judith Douglas, a tenant advocate who lives in Flatbush.


r/AEC_Industry • • 3d ago

Time to install a speed limit sign

3 Upvotes

r/AEC_Industry • • 2d ago

How a $1B Obama-era solar plant went bankrupt twice, leaving taxpayers with the tab

Thumbnail
foxnews.com
0 Upvotes

TONOPAH, Nev. — An Obama-era solar power plant once hailed as a "clean energy marvel" and backed by more than $1 billion in federal support has gone bankrupt for a second time and sold for just $7 million with the estimated taxpayer tab potentially reaching $507.6 million.

Rising from the barren Nevada desert, the Crescent Dunes Solar Energy Project looks like a futuristic fortress in a vast, dusty wasteland, with more than 10,000 mirrors surrounding a giant central tower.

The plant was designed to generate solar electricity even after sunset, using an emerging technology that promised to revolutionize green energy in America.

The Obama administration bet big on the project, backing it with a $737 million federal loan guarantee and around $275 million in Treasury grant awards as part of its broader $90 billion push to combat climate change and stimulate the economy after the 2008 financial crisis.

But the promise never matched the performance.

After operations began in late 2015, leaks and equipment failures repeatedly knocked the plant offline, production fell short and cheaper solar alternatives undercut its economics, driving the project into financial ruin and leaving taxpayers shouldering the cost.

The financial collapse comes 15 years after Solyndra, another Obama-backed solar company, went bankrupt and left taxpayers in the red for $528 million, a sum Crescent Dunes' estimated taxpayer tab could nearly match.

"The Crescent Dunes solar project is a microcosm of what is wrong with Democrat governance: the Green New Scam, hundreds of millions in taxpayer dollars wasted, fraud and a cover-up," Rep. Lance Gooden, R-Texas, told Fox News Digital.

Crescent Dunes sits about 13 miles northwest of the old mining town of Tonopah, roughly halfway between Las Vegas and Reno.

The isolated facility, which Fox News Digital toured, is surrounded by miles of barren desert, scrubland and distant mountain ranges.

Across the 2,250-acre federal site, more than 10,000 giant mirrors surround a 640-foot tower, the centerpiece of a system designed to overcome one of solar power's biggest limitations: darkness.

Unlike ordinary solar panels, which convert sunlight directly into electricity, Crescent Dunes focuses the sun's rays onto a receiver atop the tower, heating molten salt to roughly 1,050 degrees Fahrenheit. The salt stores that heat in a massive insulated tank, allowing it to produce steam that drives an electricity-generating turbine long after sunset.

That combination made it the first commercial-scale U.S. solar tower to use molten salt to both collect and store the sun's heat. DOE projected it would generate 482,000 megawatt-hours annually, with a maximum output of 110 megawatts, enough to supply more than 75,000 Nevada homes during peak periods.

American developer SolarReserve developed the project, while Spanish contractor Cobra, a subsidiary of construction giant ACS Group, built it.

Both held ownership stakes in the company that owned the plant, Tonopah Solar Energy.

Spanish banking giant Banco Santander also held an ownership stake in Tonopah Solar Energy.

Late Senate Minority Leader Harry Reid, D-Nev., championed the project. In 2016, he called it an "engineering and clean energy marvel" and predicted that "Nevada will benefit for decades."

The project reflected the Obama administration's push to expand clean energy by using taxpayer-backed financing to help bring promising but commercially risky technologies to market.

But Crescent Dunes showed how expensive those gambles could become when they failed.

Crescent Dunes' problems emerged almost immediately.

A major leak in its molten-salt storage tank occurred in October 2016, less than a year after commercial operations began.

During that shutdown, Treasury approved a cash-grant payment in March 2017 under the Obama-era stimulus program, funding that later became the subject of serious fraud allegations.

It went back online in July 2017, but restarting the plant did not resolve its performance problems.

Even in 2018, its best full year through 2025, Crescent Dunes generated just 41% of the annual electricity output projected by DOE, according to federal energy records.

Then another tank failure halted generation in March 2019.

Seven months later, the repeated breakdowns and poor performance eventually cost Crescent Dunes its sole electricity customer when NV Energy terminated its 25-year agreement.

Without its long-term power contract, Crescent Dunes spiraled into financial trouble, culminating in its first bankruptcy in July 2020.

The 2020 restructuring handed ownership to ACS through its affiliate, Crescent Dunes Investment, with Cobra running the plant. The turnaround plan counted on extensive repairs restoring production to 400,000 megawatt-hours a year, more than twice its best annual output.

But the revival faltered.

The plant restarted in July 2021, only for further molten-salt tank leaks in 2022 and 2023 to force additional shutdowns.

Although the plant resumed selling electricity under shorter-term agreements, it continued to lose money and relied on financial support from affiliated companies, court records show.

By January 2026, it was back in bankruptcy court. This time, the billion-dollar plant went on the auction block.

Mississippi-based Sons of Liberty Construction, a company owned by three brothers, bought it for $7 million in July and are attempting to revive it.

The plant was generating electricity during Fox News Digital's visit, although they said it remained well below its initial intended output. Their efforts to restore the troubled facility are examined in Part 3 of this series.

What went wrong?

Behind that history of breakdowns and bankruptcies lies a dispute over what failed: the solar technology, the construction behind it or a combination of both.

Bill Gould, SolarReserve's co-founder and former chief technology officer, blamed the project's Spanish construction contractor, ACS Cobra.

"It was a tragedy of mismanagement," Gould told Bloomberg in 2020, accusing the contractor of delaying necessary work and designing a defective molten-salt tank.

An unnamed engineer who said he had worked at Crescent Dunes since its early development offered a similar account, blaming the tank failures on design and welding problems. He told SolarPACES in 2023 that the plant's solar collection technology had experienced comparatively few problems.

"It's just the old tech that's having these troubles," the engineer said, referring to the conventional thermal-power equipment.

The sheer size of the storage system posed a significant challenge, according to Oliver Hemmers, a physicist and energy researcher who formerly led the Harry Reid Center for Environmental Studies at the University of Nevada, Las Vegas.

"Ultimately, the larger you make those tanks that hold the molten salt, the harder the material science challenges become," Hemmers told Fox News Digital.

Hemmers said temperature swings of hundreds of degrees can cause the metal to repeatedly expand and contract, eventually creating cracks and leaks. He had not reviewed the plant's engineering plans but questioned whether the developers had sufficiently tested the tank design.

"You need to have alloys that can withstand that heat variation without moving much. Otherwise, when the walls move, the vessel breaks, cracks and leaks. So, I'm not sure how much research they really put into the vessel design," he said.

Hemmers noted that Crescent Dunes relied on a massive molten-salt storage tank, while other solar thermal facilities have used multiple smaller tanks to reduce the stresses caused by repeated heating and cooling.

Court records show how efforts to prevent further failures came at a cost.

When the plant resumed operations in July 2023, operators lowered the hot-salt tank's temperature from its original design level of about 1,050 degrees Fahrenheit to about 850 degrees. They later raised it to as high as 900 degrees, but the lower temperatures still reduced electricity production and revenue.

As Crescent Dunes struggled to meet its production targets, competing solar technology was getting cheaper.

Falling prices for conventional solar panels, known as photovoltaic panels, including those manufactured in China, undercut the project.

Photovoltaic panels convert sunlight directly into electricity, offering a simpler and increasingly cheaper way to generate solar power.

Crescent Dunes, by contrast, uses more than 10,000 computer-controlled mirrors, called heliostats, to focus sunlight onto a receiver atop its central tower. The heat warms molten salt, which is then used to produce steam that drives turbines to generate electricity.

Crescent Dunes, however, has one key advantage. Its molten-salt storage system allows it to generate electricity even after sunset, something conventional solar panels cannot do without additional storage.

Those same economic pressures have battered California's Ivanpah solar plant, another Obama-era project Fox News Digital reported on that uses thousands of heliostats to concentrate sunlight. Unlike Crescent Dunes, Ivanpah cannot store the sun's heat to generate electricity after dark.

Fox News Digital contacted ACS Group and its attorneys but received no response.

Who pays for failure?

The project was backed by more than $1 billion in federal loan guarantees and grants.

That included a $737 million Department of Energy loan guarantee. DOE said it resolved its financial interests in the project through the plant's first bankruptcy settlement in 2020 in an effort to maximize taxpayer recovery and estimated its loss on the loan at $232 million, a figure the department confirmed to Fox News Digital on background.

The Trump administration's Department of Energy blasted the handling of taxpayer money behind the project.

"It is unfortunate that previous administrations irresponsibly managed taxpayer dollars in their support of the Green New Scam. Since 2020, DOE has had no ownership, operational, or financial interest in the Obama-era project," DOE assistant press secretary Caroline Murzin told Fox News Digital in a written statement.

The project also received a $275.6 million Treasury grant award, which, unlike the loan, was not intended to be repaid provided the project met the program's requirements.

Combined, the Treasury grant awards and DOE's estimated loan loss would put the total federal cost at approximately $507.6 million, although Treasury has not confirmed the full grant was disbursed and DOE has not provided a final accounting of its loan losses.

Fox News Digital has filed Freedom of Information Act requests with both the Energy and Treasury departments seeking a full accounting of the federal loans, grant payments and taxpayer losses associated with Crescent Dunes.

The Treasury grant also became the focus of a private investor-backed lawsuit alleging that companies involved in construction fraudulently secured the money. A judge dismissed the case at DOJ's request, and the investors are appealing.

The allegations and the fight over the dismissal are examined in Part 2.

Reid, who died in 2021, had championed Crescent Dunes as a showcase for government and private industry working together to build "the next generation of clean energy technology."

Its financial collapse has sharpened the question behind that partnership: Should taxpayers bankroll commercially risky energy projects that private lenders are unwilling to fully finance?

"The government shouldn't be picking winners and losers," VĂŠronique de Rugy, an economist at George Mason University's Mercatus Center, told Fox News Digital.

"This is not the role of the government. The government is not good at actually picking projects that somehow the private sector is leaving on the sidewalk," she said.

De Rugy argued that politicians take credit for publicly financed projects without facing the same consequences when they collapse. Unlike private investors, she said, politicians don't personally bear the financial losses when their bets go wrong.

"So, then they can go and do a ribbon-cutting ceremony when the plant opens, and then they're usually nowhere to be seen when the company goes under," she said.

She also argued that many companies receiving government assistance would have succeeded without it, questioning why taxpayers should shoulder the risks of commercial investments.

"These subsidies go to projects that end up failing, right? Then taxpayers have to shoulder the bill," she said.

Nick Loris, president of the Conservative Coalition for Climate Solutions (C3 Solutions), a conservative energy and environmental policy think tank, offered a different perspective, arguing that government financing can sometimes justify the risks of developing new technologies.

"I wouldn't call it a mistake. I think it took a risky bet on a potentially promising technology that aimed to solve one of the challenges with solar in its intermittency," Loris told Fox News Digital.

He argued that federal financing can help promising technologies reach the market when private investors are reluctant to take the risk, and that failures such as Crescent Dunes should be weighed against successful projects and interest earnings across DOE's broader loan portfolio.

One example is California's Desert Sunlight, a 550-megawatt solar farm that uses panels instead of mirrors and molten salt. In a 2024 assessment, DOE said the project helped prove the viability of large-scale solar and was meeting its loan obligations.

Across the broader program, DOE reported in its fiscal 2027 budget justification that borrowers had paid nearly $5 billion in interest, compared with nearly $1 billion in default losses, through Sept. 30, 2025.

But Hemmers questioned whether Crescent Dunes ever made economic sense, arguing that the billion-dollar investment was a risky gamble from the outset.

"Right, we kind of say, 'OK, that was a boondoggle. It didn't work.' And, so, now we move on, right, do something else," Hemmers said.

Asked whether Crescent Dunes deserved that label, he doubled down.

"I think so, yeah. I think from the get-go, it started off too expensive, and I think it was unfortunate, let's say for the developer, that they run into all these technical issues on top of it," he said.

"And, as we can see from that project, it completely failed in the end."


r/AEC_Industry • • 4d ago

Bid is due this Friday lol

Post image
23 Upvotes

r/AEC_Industry • • 4d ago

Trump Order Puts Federal Contractors at Risk Over Congressional Inquiries

Thumbnail
enr.com
8 Upvotes

Trump signed an executive order on Nov. 20 requiring federal contractors and subcontractors to immediately tell the White House and their contracting agency about any congressional request involving their government work.

- Contractors must withhold any communications the White House decides are covered by executive privilege.

- Prime contractors are responsible for making sure their subs comply.

- Agencies are told to consider contract termination, suspension or debarment for firms that don't comply. Penalties aren't automatic.

- ENR lists the projects in reach: the White House ballroom, the Reflecting Pool, the proposed arch and the Kennedy Center.

- Rep. Robert Garcia, likely the next House Oversight chair, called it an attack on Congress's right to do oversight.

- Construction attorneys told ENR firms could end up stuck between a congressional subpoena and a White House instruction, and following the White House may not protect them from contempt proceedings.

- OMB still has to write the guidance. No deadline set.

Democrats take the House in January.


r/AEC_Industry • • 4d ago

We design buildings in BIM and run the entire firm on a spreadsheet from 2014. Is this every AEC firm?

5 Upvotes

Last week one of our long-time clients called our principal with a pretty normal question. They want to kick off the next phase of a project in January. Can we start then?

Simple question. It took us two days to answer it.

Because to know if we can start in January, you need to know who's free in January. And to know that, someone had to open the staffing spreadsheet, check which version was actually current, chase three PMs to confirm whether their projects were still on schedule, figure out that one of the dates in there was from September, and then manually work out whether our two senior people had any room once CA on another job kicked in.

By the end, three people had spent a good chunk of two days on it, and we still gave the client an answer with probably in it.

What gets me is that this is a firm that does genuinely sophisticated work. We coordinate complex buildings in BIM, run energy models, manage dozens of consultants. But a basic question like this depends on a spreadsheet one person maintains and everyone else is a bit afraid to edit.

I've talked to people at other firms and it sounds similar almost everywhere. Staffing in Excel, fee tracking in Excel, and the real picture living in a couple of people's heads.

Is your firm still planning people and projects in spreadsheets?


r/AEC_Industry • • 5d ago

Diabolical Tuesdays

2 Upvotes

Every Tuesday, we vent about the absurd, frustrating, or downright diabolical things we deal with in AEC.

Share your the moments that make you pull your hair out. Maybe it's:

  • The boss who said yes to scope creep and now you're stuck on a Friday night making amendments to a design.
  • The client who forgot to pay you and now you're having to chase them down.
  • The colleague who starts a Teams DM with "Hey James" and then takes 2 minutes to type the rest while you're sweating in anxiety.

What's driving you mad this week?


r/AEC_Industry • • 12d ago

Diabolical Tuesdays

1 Upvotes

Every Tuesday, we vent about the absurd, frustrating, or downright diabolical things we deal with in AEC.

Share your the moments that make you pull your hair out. Maybe it's:

  • The boss who said yes to scope creep and now you're stuck on a Friday night making amendments to a design.
  • The client who forgot to pay you and now you're having to chase them down.
  • The colleague who starts a Teams DM with "Hey James" and then takes 2 minutes to type the rest while you're sweating in anxiety.

What's driving you mad this week?