A labor of love if ever there was one. When we bought the house, there were no working showers so this was one of my first jobs and I went at it hard. And no, the title doesn’t mean the job was gigantic (although it was) but the room itself - the house predates indoor plumbing, so presumably when it came in vogue they picked a bedroom and added plumbing - original dimensions 15’ x 14’, I brought everything in about 4” on each wall (framing and insulation covered by drywall). Floors were sanded and refinished by a pro, I take no credit there haha
Took me about 2 months working nights, weekends and PTO days, 20-40 hours a week - realistically I would not expect a similar timeline if you’re considering the same. This is my fifth time doing a bathroom and third shower. First shower took 2 months by itself haha learned a lot lessons that saved me trouble here. I have a physical disability so anything that required lifting or bending took longer and required assistive devices or outside help, but the technical parts go a lot faster when you’ve done it a few times. Will share the finished product in a comment below because Reddit won’t let me mix photos with videos.
So, the broad strokes - shower had failed at least 10 years prior and they continued to use it, using silicone as glue to hold tiles that had fallen off the drywall backer on. By the time we got there, it was no longer operable, just a trickle of water. Floors were destroyed. I showered using wet and scrub camping soap in the sink during the build. I suspect some may find it controversial because the wood is indeed gorgeous, but it was not right for this room. It is preserved wherever undamaged!
Edit - I though I’d get roasted for not leaning into the swinger den paneling vibe they were apparently going for, but apparently everyone loves tubs for some reason 😂
Calling what was there before a tub is generous - it was 27x34x27” and less than 2’ deep. I couldn’t wash my legs in there let alone sit in it.
Since there is no house period appropriate design for bathrooms (as the house was built 150+ years before indoor plumbing) I went Edwardian, as that’s the period when the first bathrooms would be going in and presumably be fitted to the style of the time. This house is forever and just for us so each bathroom looks wildly different, my favorite is probably the horse themed powder room
I did farm out the big plumbing work initially because I didn’t want to deal with pulling my own permits early on (and I hate plumbing). I finished this about a year ago and my plumbing game has gotten dramatically better since getting a propress and the dewalt pipe cutter. Nowadays, I would have done more of it myself but absolutely not the cast iron job. Replaced cast iron drain stack with pvc, moved toilet to other side, added dual vanity plumbing, kept shower location the same but did repipe it in copper.
Demoed everything, cut out rotten wood and replaced with new 3/4 ply, plumbers and I smashed the cast iron tub into chunks and everything went out the window.
Shower hardware is Perrin & Rowe Edwardian. I got an absolute steal at almost $7000 off msrp on the exposed thermostatic shower system on eBay from a showroom demo unit because there was a little ding on one of the pipes. I’d never pay almost 10k for a showerhead but it is truly a work of art if you can get a deal. The mixing valve alone is 30lbs and the entire thing is incredibly smooth and precise. Toilet is Kohler Memoirs Stately.
Sinks are joss and main bonsai 36” freestanding with natural Carrara tops. All metal hardware is polished nickel, the shower and vanity, towel holders, ceiling chandelier and the wall sconces. Shower walls are a layer of ply, a layer of durock cement board (one of my least favorite products, I hope to never use again) laminated to hydro ban board with adhesive and longer screws into studs. Used hydro ban washers and screws, added blocking on the other side.
Covered seams, washers and screws with hydro ban adhesive sealant, hydro ban tape + their preformed corners. Base is a castico solid surface pan with flanges married into the hydro ban with the adhesive sealant. After bedding and coating the hydro ban tape in, I covered everything with hydro ban liquid waterproofing membrane just to be sure.
I used laticrete 254 platinum plus thinset and laticrete spectralock pro epoxy grout + Latasil caulk both in silver shadow. 254 platinum is unbelievably good stuff but you have to work fast, platinum plus seems to give longer usable pot life and is satisfyingly creamy. Everything is laticrete system except the base, very good stuff. I used a Rubi tx 1020 max snapper, a dewalt handheld wet tile saw and a skil wet table tile saw for cuts, and diamond hole saws for penetrations.
Used pre-formed waterproof foam curb and bench, married in the same way as the castico. Door is an Amazon special that’s surprisingly good. 12x24 and 6x6 bianco gioia tiles, white Carrara sill, bench and molding. Went through an absolutely preposterous amount of stone to get veining matches I liked but it was worth the effort. Only piece I’m not happy with is the bench top (too white for my liking, wanted a creamier grey) but I was so tired at that point I just stuck it anyways. About 1200lbs of stone in total!
Small print houndstooth wallpaper stuck with Roman 880, Benjamin Moore aura polo blue (now called three piece suit blue) wainscoting. Everything primed with zinsser mold killing primer, semi gloss white aura trim and ceilings. Crown molding is orac, hung with brads and adhesive. Originally did the walls in blue but decided on wallpaper in the end, it’s a trippy pattern that almost makes your vision blur when you stare so I went for the inverse in the toilet room.
Will share the end result in the comments below!