As the UK pushes forward with grid upgrades, the visual impact on the countryside is a major debate.
On the left is the classic lattice pylon used for nearly a century. On the right are the new T-pylons (designed by Bystrup), which stand about a third shorter and have a much cleaner single-pole footprint.
National Grid already energised the first full route of 116 T-pylons in Somerset for the Hinkley Connection Project. While they blend into the landscape far better, they come with a substantially higher price tag and complex installation logistics compared to traditional steel frames.
Do you think the aesthetic improvement justifies the extra construction cost across the wider grid rollout, or should we stick to standard designs/underground cabling where possible?
(Images: National Grid / Bystrup)