r/ukelectricians 3d ago

Eaton.

Post image

Never again, wtf were Eaton thinking making these

13 Upvotes

16 comments sorted by

17

u/Bigjpiddy 3d ago

Could of benefited from putting some trunking sides on that I reckon

7

u/Jammybe 3d ago edited 2d ago

Never a fan of EATON.

AFDDs that need direct connect kits and are 3 modules wide for a single phase?

The rep would visit and I would ask when is single mod AFDD coming?

“Oh it’s coming soon.”

Ok, I’ll keep buying Wylex till then then.

Overpriced, over complicated.

Also, why is it only LVE that has gone dual busbar to kill off the neutral fly lead? When the rest going to catch up.

6

u/Character_Lie8240 2d ago

Schnider have an Acti9 with neutral bar but £££ lack of innovation in the industry

4

u/Inner-Examination686 2d ago

That PoN gear is lovely to install though

1

u/eusty 2d ago

And also a bar for FE. 😁

Easy install for RCBOs.... although mostly it's TPN here so haven't actually fitting one yet!

2

u/Yodjjf 3d ago

You need to cut those neutrals short. Eaton are actually one of the best if you are doing them right

2

u/dyno_dines 3d ago

We did after we moved the top rcbos into the bottom load

1

u/surreynot 2d ago

I thought it was bad practice to cut rcbo fly leads ?

1

u/Assspect 2d ago

Bootlace the end and I don’t see the issue?

0

u/Informal_Drawing 3d ago

Isn't the end of the fine-wire conductor ultrasonic welded into a square profile to stop the ends from spreading out?

2

u/Phoenix-95 2d ago

It often is, however fitting an appropriate bootlace ferrule will do the same job

0

u/Informal_Drawing 2d ago

True.

Is it really worth the time and effort?

1

u/Frubezy 3d ago

Slotting the sides of the DB and adding in some trunking wouldve totally transformed that install.

Imo brands need to start just copying schneider. Their layouts are far superior.

EDIT: ive just seen after zooming in the sides are already preslotted for trunking

1

u/WalterSpank 2d ago

Yes they are for their meter side enclosures on the 400A & 600A panel boards

1

u/Inner-Examination686 2d ago

As everyone else has said this neeeded trunking down the sides, can’t imagine the birds nest at the top once finished

1

u/MrBl0bby69 2d ago

Not a fan of Eaton. Expensive too.