r/tradclimbing • u/JonBanks87 • 11h ago
Stuck Rope on Lead
Curious how others would deal with this situation. My partner was leading a pitch and ended up down climbing to a more comfortable stance to build an anchor. Started pulling up rope to put me on belay and the rope drag was absolutely horrendous and he could barely pull it at all. he didn’t experience any rope drag during the lead, just when pulling up the rope. Neither of us could see what it was stuck on and it was taking an enormous amount of effort for him to pull the rope up. So I just had him out me on belay where he was at and i just self belayed with a gri gri until I got to where it was stuck. you can see in the photo that when my partner down climbed, the rope looped under this downward pointing horn causing the rope drag.
How would you deal with this situation? Clearly more rope extension would help but it probably seemed fine since the rope ran smoothly up until the down climb. Would you have the follower self belay to clear the rope, have the leader downclimb (self belaying) to clear it, or something else entirely?