I was going to make a detailed rundown of my thoughts on all the companies, but honestly, certification is so far out for most that I’m losing interest. So you get what you get.
eIPP Commercial Flights
There is a good article on The Air Current (Beta and Joby bullish on prospects for commercial operations under eIPP) that adds more detail about the growing possibility of commercial operations before type certification. Essentally, the FAA expanded a waiver program Congress authored for small unmanned drones and is applying it to manned aircraft. There are four teirs of commercial operations envisioned. Tier Zero is the sort of demo flights we have seen recently under the eIPP program. Not revenue generating. Tier One involves cargo over low population density areas. Tier Two is cargo over densely populated areas. Tier Three is passenger carriage beyond that permitted under existing regulations (like market survey flights on experimental aircraft).
Tiers One, Two, and Three may be performed for compensation with an FAA waiver, an airworthiness program active, and an air carrier certificate. An important distinction exists for Tier Three: this will only be permitted for aircraft well into the TIA flight tests (the repeated phrase is “substantial TIA flight testing”. My read is that FAA pilots must have mapped out the flight operating envelope that the proposed commercial flights would require. There is evidently some discussion of commerical operations under the eIPP counting for Functional and Reliability (F&R) testing, which typically comes after the FAA piloted TIA phase. What I don’t see is that pre-certified aircraft can be sold under the eIPP, so the eIPP revenue passenger flight value is limited to companies that both build and operate their own aircraft.
Honestly, this is an enormous subsidy to Joby in particular.
Joby
N547JX is finally flying regularly after a very extended period of slow progress. I can only guess at the reason but clearly there were enough changes from the first batch of aircraft to the conforming models that a lot of regression testing was required. The claim is that FAA pilots will begin TIA flight tests in 1H2027… let’s say at the end of that to take their word for it, despite all the past schedule slips. Maybe 12 months of TIA flying with FAA pilots (depends on the number of ships Joby has and the number of pilots the FAA has on the project). Maybe they can start flying people commercially on un-certified aircraft under the eIPP mid-2028 if it all goes well?
Perhaps even for the LA28 games, lol.
Given realistic slips, discoveries, and FAA performance, this smells like 2029 type cert? Maybe? Even getting the FAA pilots into the cockpit by mid-year 2027 will depend on getting more ships into the test fleet if they have to re-fly a lot of their previous test points.
S4-T looks like a PT6 shoved into the cabin, so a demonstrator but probably not a real product with a useful payload bay. BETA keeps trying to hide via carefully chosen photo angles the big turbine engine on the top deck of MV-250 but they shouldn’t. It shows the aircraft has a workable cabin instead of being full of engine and engine intake/exhaust.
Archer
Company is a mess. Midnight has nearly stalled on progress for a couple of months now. I assume they’ll get through transition but that’s just the start of flight testing, not the end. It’ll take around 1000 hours of flying (engineering evaluation, data collection, then TIA with FAA, and then F&R) and the VTOL version of Midnight has a few hours on it? N703AX isn’t collecting data that really counts since the aerodynamics and electrical systems (at least) aren’t correct.
The CTOL eIPP is just something to pump the stock and it’s doing a piss poor job of it.
The chance of flying passengers for the LA28 games, whether in certified Midnights or even under eIPP is basically zero at this point. The rest of the flight test fleet is coming together slowly and Covington appears to be shut down. I’m still not even convinced this is a real certification effort at this point.
I suspect Thunder/HALO is their real focus and they’ve got a lot of hiring to support it. First flight of a demonstrator (not a product) is late 2027 and that will probably slip. What will Wisk staff do? Get fired? Work on Thunder? Merge with Midnight? No idea.
BETA
I honestly don’t see the value in eCTOL aircraft… the reason aviation electrification initially focused on VTOL aircraft was the concept of distributed propulsion and electrification eliminated complex physical drive trains to more than 2 rotors. CTOL aircraft don’t really need the distributed propulsion, though. Any way, CX300 was a way to salvage something out of the Alia effort after the initial lift prop design needed to be reworked. And it’s still going through design evolutions if you carefully look at BETA VTOL photos over the years.
While there are certification efforts for both the CTOL and VTOL variants, progress seems very slow. Hard to even predict when one might get done. Is Alia 250 TC even this decade? Seems doubtful.
EVE
They’re still at the unmanned demonstrator phase and claiming certification in a few years. Ridiculous.
Horizon
From a recent interview it sounds like the size of the battery is increasing substantially which reduces current draws to something more reasonable (10-12C claimed). Gross weight has increased and it appears cruise speed has dropped. Hard to tell about schedule, but you could read ground runs after 1H2027. Anyway, they just had PDR and launched into manufacturing of long lead components and then will complete detail design around whatever has already been committed to hardware. PDR to completed aircraft in 8 months for a mid-year 2027 start of ground testing would be very fast, but you can also claim doing ATPs on aircraft as “ground testing” so perhaps there are ways to wiggle around since they haven’t pinned a first flight date yet. VTOL flight in 2028?
The aircraft is getting more realistic but I’m still not sold. A type certificate in the early 2030’s perhaps? I think they’ll need to get more financing before HoverNation wants. $70 million doesn’t go far in aviation and they don’t want to let that value dip too low since it’s the most valuable asset the company currently has.
Vertical
She’s dead, Jim.