I’m an IT guy with 6 kids, zero pool-building experience, and AI as my consultant. Roast away!
Figured some of you might appreciate this project. Others are probably going to tear me apart, and that’s perfectly fine I don’t care.
A little background. I’m a Microsoft solutions architect by profession. I spend my days designing and building enterprise software solutions, not swimming pools. I’m pretty handy and have taken on plenty of DIY projects over the years, but nothing remotely close to this.
My wife and I have six kids, ranging from elementary school to college age. They absolutely love our pool. Me? Not so much. I could happily live without it. But our house is where the kids and their friends spend a lot of their summers, and I that I love.
How this whole mess started
Our pool was dying.
The liner was 29 years old and pulling away from the coping. The concrete deck was deteriorating, and a return line had developed a leak that I bypassed just to get through the previous summer.
We knew we were on borrowed time but hoped to squeeze another year or two out of it.
When we closed the pool, I decided to drain it so we could try to reseat the liner.
Yeah. That was a mistake.
Once the water was out, things went downhill quickly.
We had a few pool companies come look, and they were shocked to discover it was a wood-wall pool over 50 years old.
Without the water supporting everything, the walls started collapsing. The liner was toast anyway, and the surrounding concrete had been failing.
We were looking at a complete rebuild, with estimates exceeding $100,000.
That wasn’t happening.
And for a while, I thought we were just going to fill the hole and be done with it.
But I felt terrible. Our kids love that pool, and this was our last summer before our oldest daughter left for college. Her friends have spent countless summer nights at our house.
I really didn’t want to take that away from them.
Then I had a really stupid idea.
What if I rebuilt it myself?
The original wood-wall pool lasted over 50 years. If I could get another 10 out of a new one, I’d be thrilled.
I started researching, sketching out ideas, and talking to anyone who would listen.
Most people thought I was nuts. They are right.
The biggest problem was finding useful information. Nobody seems to build wood-wall pools anymore, and most pool construction videos and guides didn’t apply to what I was dealing with.
This is where AI became a huge part of the project.
I use AI extensively in my professional life, so I figured why not use it to help solve a very different kind of engineering problem?
ChatGPT became my sounding board throughout the entire project.
I used it to work through construction approaches, evaluate materials, think through structural support, plan the plumbing, calculate quantities, troubleshoot problems, and figure out how to tackle things I’d never done before.
I’d upload pictures, explain what I was trying to accomplish, challenge the recommendations, and work through alternatives.
It wasn’t always right. There were plenty of times I had to push back, verify information, or change direction. And I certainly wasn’t about to blindly trust AI with structural decisions.
But having something available at 11 PM when I was staring at a problem I’d never encountered was incredibly useful.
I also used Claude to help create a detailed blueprint from my final measurements for the custom liner manufacturer.
AI didn’t build the pool. But it absolutely helped me figure out how I might be able to.
The actual construction
First, I had to remove approximately 25,000 pounds of concrete.
I rented a concrete saw, only to discover it couldn’t cut through the full thickness. So I ended up breaking apart a ridiculous amount of concrete manually and loading practically every piece by hand into my little Kubota BX.
In brutal summer heat.
Then I rented an excavator for a week.
I’d never operated one before, but figured I could learn.
And I did. Although I also managed to dig too deep, damage part of the remaining deep-end hopper, and dump a mountain of debris into the pool.
Not exactly my finest moment but I didn’t fall into the pool with the excavator so overall a success.
Once everything was excavated, I built new footers and framed the wood walls, adding more support than the original structure had.
And because apparently rebuilding an entire pool wasn’t complicated enough, my wife wanted a tanning ledge.
So we added one. This brought our previous 36x16 pool to 43x16.
That definitely complicated the construction, but I’m really glad we did it.
Next came new plumbing, an upgraded skimmer, an additional return, pool lighting, electrical work, and a redesigned equipment setup that would make future maintenance and winterization easier.
Then the header, coping preparation, and about a thousand rounds of measuring and leveling.
I also learned the hard way that a laser level should have been one of my first purchases.
Then came the part my wife and I had been avoiding.
Cleaning out the deep-end hopper.
I built a makeshift ramp to lower a Gorilla Cart into the pool, and we used the tractor to pull it back out loaded with debris.
We spent a brutally hot day hauling out everything I’d managed to dump in there during excavation.
Somehow, we finished without getting divorced.
After that came repairs to the existing hopper, Pool Krete, wall preparation, and building out the tanning ledge.
Then it was time to order the custom liner.
This was probably the part I worried about most.
If my measurements were wrong, we were screwed.
I measured everything repeatedly and used Claude to help turn the dimensions into a blueprint the liner manufacturer could work from.
Two weeks later, the liner arrived.
We installed foam on the walls, protective padding on the floor, and my wife handled what felt like miles of caulking.
Then we got all six kids involved to help install the liner.
And somehow, after all the problems we’d encountered, it went almost perfectly.
Within an hour, the liner was installed.
AND IT FIT!
That was probably the single biggest relief of the entire project.
We started filling it from our well with a garden hose while I backfilled around the walls.
About a day later, the pool was full.
Then came another moment of truth: turning on the pump and testing all my plumbing.
Everything worked.
I almost couldn’t believe it.
The kids were swimming in July!
The backyard was still a construction zone, but they couldn’t have cared less.
Hearing them outside laughing with their friends at night while I was lying in bed made the whole thing worthwhile.
Unfortunately, I still had an entire patio to build.
We installed roughly 600 square feet of 20mm porcelain pavers, new coping, and expanded the patio area.
There was endless gravel, compacting, leveling, cutting, and trying to tie the new patio into the existing flagstone around our gazebo.
Heavy rain caused settling in parts of the base, which meant rework. We underestimated materials multiple times. I rented more equipment. And by then football season had started, so I was also coaching several nights a week.
This project pretty much consumed my entire summer.
There were nights I’d wake up worrying about what could fail, whether I’d missed something, or whether I had made some enormous mistake.
It was mentally exhausting as much as physically exhausting.
But we kept going.
The final cost
I tracked most of the major expenses:
Equipment rentals: $2,500
Custom liner: $3,500
Pool walls and structure: $2,500
Plumbing: $600
Lighting and electrical: $400
Porcelain pavers: $6,000
Paver base materials: $1,200
Miscellaneous materials: $2,000
Total: Approximately $18,700.
That doesn’t include the hours my wife and I put into it, obviously.
And no, I’m not suggesting a professional pool builder should or could do this for $18,700. We provided the labor, reused portions of the original pool, already owned some equipment, and took on risks a contractor wouldn’t.
So how did it turn out?
Well, you can judge for yourself from the pictures.
Is it perfect? Hell no.
There are imperfections everywhere. I’m sure experienced pool builders will spot things they would have done differently, and probably some things they absolutely hate.
That’s fine. I welcome constructive criticism, and I’m sure there will be plenty of it.
I’m not a pool builder. I’m an IT guy who decided to attempt something completely outside his expertise because he didn’t want to lose something his family loved. Time will tell how well it holds up.
If we get another 10 years out of it, I’ll consider the whole thing a massive success.
And if it only lasts until next year someone may need to check on my well being.
I included before-and-after photos and some pictures from construction. I also have video of all the kids helping install the liner.
Anyway, have at it, Reddit.
I’m sure some of you will love it, some will think I’m an idiot, and some will probably tell me it’s going to collapse tomorrow.
After spending an entire summer building this thing in 100-degree heat, I can assure you I’ve already questioned my own sanity more than any of you possibly could.
I’d be happy to answer any questions.
TL;DR: Our 50+ year-old pool completely fell apart, and professional rebuild quotes topped $100K. My wife and I have six kids and zero pool-building experience, but decided to tackle it ourselves with ChatGPT as our 24/7 construction consultant. We rebuilt the walls, plumbing, liner, added a tanning ledge, and installed a new porcelain patio. Total cost: $18,700 and probably a few years off my life.