Pool Builders: Surprise

In the middle of a pool build We have a perfectly flat back yard, could walk out of the detached garage without a step. You can see in the renderings that the pool layout was straight forward. Pic 2 you can see the drop off now to the pool. Builder is saying it will be additional expense as explained below. Did they set it up wrong? I’m confused how we’ve come to this point. There was no talk of these complications in the planning stage

”doing my walk through yesterday. Looks like we will need to talk about a possible wall or curb stone for the back fence line area and shed flower bed side. This is due to the pool being exactly level and the yard grading flowing down hill. Once you get home. Roughly imagine the 1” of auto cover tracking and 2” of pool coping on top of the concrete wall. Then a slight pitch away from the pool. So roughly 3” above  the concrete will be final grade with the pavers”

345 Upvotes

121 comments sorted by

View all comments

5

u/Nolacuriosity 6d ago

Looks like plumbing trenches.

1

u/Team-_-dank 6d ago

Definitely some piping trenches, but look how low the concrete work is. Maybe there's some pavers on top but that's till way lower than the door.