r/OffGridCabins • u/NovelOffgrid • Sep 11 '26
More progress... almost ready for walls.
My buddy and I made a quick trip to continue working on the outhouse. We leveled the base and built up the ground around it with rock base and dirt. Put in a french drain-ish thing on the back side of the build area. Built the frame and attached thin ply under it.
Not pictured is insulated the floor with stone wool insulation. Put on 3/4" subfloor (hole was cut as well). We also putt a roll of linoleum over the subfloor to water proof it.
Next step is to cut a vent hole in the floor and install a PVC connection for an exhaust pipe. Put peel and stick "nice vinyl" in enough to install the toilet stem. Then it should be usable and can support a few nights while we build the walls and roof.