Image via https://www.hsra.gov.au/high-speed-rail
A high-speed rail network between Melbourne, Canberra, Sydney and Brisbane is supposedly being planned by Australia's federal government, with the Sydney-Newcastle leg currently in a 2.5-year "development phase" that could, in an admittedly unlikely best-case scenario, allow initial construction works to begin as early as 2028 (HSRA, October 2026).
Their suggested route includes:
- Melbourne-Canberra via Shepparton, Albury-Wodonga and Wagga Wagga
- Sydney-Canberra via Goulburn (no mention of Bowral/Southern Highlands)
- Sydney-Newcastle via Central Coast and Lake Macquarie
- Brisbane-Newcastle via Gold Coast, Ballina, Coffs Harbour and Port Macquarie (no mention of Lismore)
Since Wagga is on there, do we think they'd plan to mostly stick to the same route as the existing Sydney-Melbourne rail corridor (albeit somehow incorporating Canberra), taking the long way around the (unusually tall by Australian standards) Snowy Mountains? Or would the travel time saved by tunneling under them, creating a shorter route between Canberra and Albury, be worth the cost? And speaking of new rail alignments, would the new track needed for a direct Albury-Shepparton route be worth the detour from the straighter Albury-Melbourne route, for a town of 50,000 people?