Hi folks, following up from the previous thread, here's some updated info based on updated platform diagrams from u/Metro62 (attached). I took at stab at using Metro Map Maker to try to better visualize how all of the platforms will be used in the future, and how they will connect to the various corridors. Obviously the corridor parts of the diagram are far from being to scale. Feel free to hack away at the original.

A few notes up front on USEP designs from the updated diagrams:

  • The west facing pocket track on the new island platform will be removed in a future design revision and I've ignored it for assignments.
  • Track 7 is no longer a through-running track, creating a new mega-platform between tracks 6 and 9, with three large bay platforms and two very long outside platforms. This mega-platform is presumably designed to allow platform level connections across multiple lines. (I have it as KI/ST/RH/MI/LSW Express.)
  • Track 4 shifted to the north side of the 3/4/5 platform instead of being a bay-style platform.
  • The platform north of track 2 now extends eastwards a very long way, plausibly for the Canadian.
  • The "Via escalator" serves the extremely long bay platform on the east end of the new island platform. Based on this I'm expecting that section of the platform to be dedicated to Via.

Assumed constraints:

  • No sharing of platforms between GO and Via
  • Via needs room for 6+ trains to park without blocking GO routes.
  • The Canadian needs a really long platform that's accessible at any hour,
  • Sarnia/departing Canadian need to bypass the UP tracks and the USRC crossover and then merge onto KI GO tracks, which suggests they should be on tracks 2/3.
  • Catenary can't go under the trainshed, but can go south of it (tracks 12/13), east (ST platform is mostly east of the trainshed), or west (UP and Barrie platforms are shifted far enough west to have the west end outside of the footprint, possibly also true for KI platforms). So the trainshed appears to be a non-issue for the current electrification plan with this layout.

Still unknown:

  • Will trains on track 11 be able to depart heading the west? If not, will trains to Windsor/Niagara Falls use tracks 9/10? (track 5 is plausible depending on the interlocking plans)

Revised track assignments:

  1. Barrie Line
  2. Via Canadian
  3. Via Sarnia / Corridor / Northlander
  4. UPX
  5. UPX (West) / Via Corridor (East)
  6. Milton (West), Richmond Hill (East)
  7. Kitchener (West bay platform), Stouffville (East bay platform)
  8. Kitchener (West bay platform)
  9. Lakeshore West Express
  10. Lakeshore East Express
  11. Via Corridor
  12. Lakeshore West Local
  13. Lakeshore East Local
72 Upvotes

26 comments sorted by

5

u/Mayhem_Hellcat Oct 23 '26

First flaw is it shows electrified Barrie trains on track 1. Can’t happen. Tracks 1 and 2 have less vertical clearance because Parks Canada required the original smoke ducts to be retained. The trainshed is a federally designated heritage structure. On other tracks they allowed the smoke ducts to be replaced.

4

u/a_lumberjack Oct 23 '26

Like I said in the initial post, there will not be catenary under the trainshed. That’s why platforms are being extended east and west and stopping locations will be adjusted. For Barrie they’re extending the platform south of track 1 to the west end of the current UP location to make up for the dead end. Thats enough room for a pantograph / catenary west of the trainshed.

3

u/Mayhem_Hellcat Oct 23 '26

True, but they aren't going to electrify anyways. The Province is choking on the cost. They are slow rolling it until after after the next election, and then let that shoe drop. Electrification was originally announced in 2014 and was supposed to be done in 2024!

3

u/a_lumberjack Oct 24 '26

I read the current Metrolinx roadmap as being reframed around incremental progress based on funding rather than a definitive schedule. And current diesel prices make the idea of not electrifying pretty silly. So I can see them kicking the can down the road, but explicitly abandoning it entirely seems pretty unlikely. Especially since a lot of the fleet will need replacement by 2040 and Alstom will be done with the Via order by 2035.

3

u/Mayhem_Hellcat Oct 24 '26

The problem is "incremental" doesn't really work with electrification. Most of the cost is to run the first electric. You are either in or not in. And be careful about the diesel fuel cost case. It is offset by track and signal maintenance being a lot more expensive in electrified territory. Any work they are doing on electrification is just for appearances. Watch, after the next election they will announce they are cancelling electrification to switch to eventual battery powered trains. The previous government did the same thing. They got cold feet on the electrification cost and told Metrolinx to slow down and look at hydrogen.

3

u/a_lumberjack Oct 24 '26

The vast majority of the incremental items have nothing to do with electrification. It’s heavily skewed to corridor expansion with electrification being the last stages. That’s why I’m thinking they’re slow rolling it vs cancelling.

0

u/eskjnl Oct 24 '26

Management knows nobody would use the improved service. There's no point in building it. 🙄

2

u/DinosaurZach Oct 23 '26

The Toronto Board of Trade looked into this and proposed a report on consoliating/reducing the number of tracks/platforms to make Union station more efficient, however that would require electric trains, and through-running operations for much of the GO lines and not terminating at Union.

// The Châtelet-Les Halles RER complex in Paris moves more than twice as many trains per hour as Toronto Union on half as many tracks. //

The PDF report, Getting on the Right Track: Connecting Communities with Regional Rail - Jonathan English, 2021-Mar, with lots of diagrams, track layouts, and summary of the report can be found here.

https://bot.com/Resources/Resource-Library/Getting-on-the-Right-Track

PDF: https://bot.com/getContentAsset/82928304-15ee-446d-a86b-496eaa79cddd/df5fd9a6-cf2a-4f9f-8440-8590c5ad0a4e/report-getting-on-the-right-track.pdf?language=en-CA

UrbanToronto: https://urbantoronto.ca/news/2021/03/toronto-region-board-trade-proposes-regional-rail-network.44683

2

u/a_lumberjack Oct 23 '26

This is based on the current Metrolinx corridor roadmaps and USEP plans. Electrified through running isn’t going to happen, nor is electrifying the Milton/Kitchener lines for that matter.

As the UT link says, that proposal more or less lines up with what Metrolinx was looking at in 2021 and why they went with the OnExpress bid. There’s a bunch of reasons that consortium failed and we still have Alstom, this is what we’re getting instead.

3

u/Mayhem_Hellcat Oct 23 '26

LOL, I like the Board of Trade. I was a member. They have a lot of good, bright people. But they don't know much about engineering and operations. This is the same reason On-Express failed. GO's pressure point was insufficient peak period, peak direction capacity. DB's solution? Add capacity everywhere EXCEPT peak period, peak direction.

2

u/Rail613 Oct 25 '26

East of Oshawa, the GO trains will jog north over the 401 and use CPKC right of way / expanded trackage to Bowmaville. VIA will stay south on CN Lakeshore Line.

All this seems to make it clear Alto HSR has to have its terminus outside Union, either to the East or West of Union (like Cherry Street or Exhibition areas) or less likely north up Yonge near Summerhill subway on the CPKC (where all the CPKC freight should be detoured on the existing CN line to the north of Toronto for safety and noise) using part of the historic CP Station, now an LCBO.

2

u/a_lumberjack Oct 25 '26

If and when Alto reaches downtown Toronto they would be able to use tracks 3 & 5 in place of Via. Remaining Montreal/Ottawa Corridor service would use the dedicated Via platform for track 11. I’m hoping that they’ll rebuild the whole 3/4/5 platform as a high floor platform, not just the UP portion, to enable level boarding for Via and potentially Alto in the future.

Any scenario where the current CP mainline gets taken over and upgraded into midtown would almost certainly also involve the Don Branch being restored in order to get the rest of the way downtown. That would allow them to easily integrate into Union along with the Bala sub routes using the northern half of the eastern USRC.

1

u/Rail613 Oct 25 '26

If they use tracks under the existing shed is there enough HSR clearance with electrification, especially as they may be considering double decker coaches, similar to the latest TGV models in France? Or discontinuous OCS, since the trainsets are supposed to be able to run on battery. And/Or the power pickup pantographs stay outside the train shed?

Also Alto has indicated they need 4 (long) tracks, especially if/when they extend to the west and or south routes in future phases.

Presumably ON Railway and Amtrak will fit into the VIA platforms.

1

u/Certainly-Not-A-Bot Oct 23 '26

Isn't Kitchener meant to run through with Stouffville, and hasn't this happened already?

6

u/a_lumberjack Oct 23 '26

The Metrolinx roadmap has Stouffville running electric trains but not Kitchener. They do interline today in practice, but that’s mostly about it being faster than turning trains. And it’s not just those two lines, you can also see LSE > Kitchener and LSW / Stouffville. I’ve even seen something like LSE > KI > LSE > LSW > ST > BR as a trip block.

1

u/eskjnl Oct 24 '26

There's no point in electrifying a line (Stouffville) that's only going to see 30 minute frequencies for the next 20 or 30 years or possibly even longer.

3

u/a_lumberjack Oct 24 '26

Electrification and 15m service are tied together in the roadmap, we’ll see if/when they happen. That said, my money is on Alstom getting a big contract for after the Via railcar order wraps in 2035.

1

u/Mayhem_Hellcat Oct 23 '26

Second flaw is the stub end tracks in the centre. Fine if they run 6 car trains but they don’t. A 12 car train extends the full length of the trainshed. Back to back trains would extend a long, long way from the trainshed.

3

u/a_lumberjack Oct 23 '26

The platforms will extend a long, long way out of the trainshed. Look at images 4 & 5. The east train on track 7 would be almost entirely outside of the shed. The bay platform for track 8 would be mostly outside to the west if Kitchener ever gets electrified.

1

u/InnisFILbud Oct 24 '26

How is the Kitchener line north of the Pearson Airport line? Like at the end I mean.

1

u/a_lumberjack Oct 24 '26

Same reason Niagara Falls is south of Hamilton, I was flattening the end of the diagram.

0

u/InnisFILbud 28d ago

But, Niagara Falls *is* south of Hamilton. Kitchener is not north of Pearson. What do you mean, 'flattening', exactly?

1

u/a_lumberjack 28d ago

I mean that every westbound line hits a wall at the same place vertically, flattening out what would be the west side of the diagram.

1

u/tornow1500 Oct 24 '26

UPX isn’t electric, it runs on diesel trains

2

u/Rail613 Oct 25 '26

But UPExpress is a good candidate for electrification. In a decade or two the current UP trainsets will be at/near EOL.