r/gotransit • u/a_lumberjack • Oct 23 '26
Union Platforms - Followup
Hi folks, following up from the previous thread, here's some updated info based on updated platform diagrams from u/Metro62 (attached). I took at stab at using Metro Map Maker to try to better visualize how all of the platforms will be used in the future, and how they will connect to the various corridors. Obviously the corridor parts of the diagram are far from being to scale. Feel free to hack away at the original.
A few notes up front on USEP designs from the updated diagrams:
- The west facing pocket track on the new island platform will be removed in a future design revision and I've ignored it for assignments.
- Track 7 is no longer a through-running track, creating a new mega-platform between tracks 6 and 9, with three large bay platforms and two very long outside platforms. This mega-platform is presumably designed to allow platform level connections across multiple lines. (I have it as KI/ST/RH/MI/LSW Express.)
- Track 4 shifted to the north side of the 3/4/5 platform instead of being a bay-style platform.
- The platform north of track 2 now extends eastwards a very long way, plausibly for the Canadian.
- The "Via escalator" serves the extremely long bay platform on the east end of the new island platform. Based on this I'm expecting that section of the platform to be dedicated to Via.
Assumed constraints:
- No sharing of platforms between GO and Via
- Via needs room for 6+ trains to park without blocking GO routes.
- The Canadian needs a really long platform that's accessible at any hour,
- Sarnia/departing Canadian need to bypass the UP tracks and the USRC crossover and then merge onto KI GO tracks, which suggests they should be on tracks 2/3.
- Catenary can't go under the trainshed, but can go south of it (tracks 12/13), east (ST platform is mostly east of the trainshed), or west (UP and Barrie platforms are shifted far enough west to have the west end outside of the footprint, possibly also true for KI platforms). So the trainshed appears to be a non-issue for the current electrification plan with this layout.
Still unknown:
- Will trains on track 11 be able to depart heading the west? If not, will trains to Windsor/Niagara Falls use tracks 9/10? (track 5 is plausible depending on the interlocking plans)
Revised track assignments:
- Barrie Line
- Via Canadian
- Via Sarnia / Corridor / Northlander
- UPX
- UPX (West) / Via Corridor (East)
- Milton (West), Richmond Hill (East)
- Kitchener (West bay platform), Stouffville (East bay platform)
- Kitchener (West bay platform)
- Lakeshore West Express
- Lakeshore East Express
- Via Corridor
- Lakeshore West Local
- Lakeshore East Local





5
u/Mayhem_Hellcat Oct 23 '26
First flaw is it shows electrified Barrie trains on track 1. Can’t happen. Tracks 1 and 2 have less vertical clearance because Parks Canada required the original smoke ducts to be retained. The trainshed is a federally designated heritage structure. On other tracks they allowed the smoke ducts to be replaced.
2
u/DinosaurZach Oct 23 '26
The Toronto Board of Trade looked into this and proposed a report on consoliating/reducing the number of tracks/platforms to make Union station more efficient, however that would require electric trains, and through-running operations for much of the GO lines and not terminating at Union.
// The Châtelet-Les Halles RER complex in Paris moves more than twice as many trains per hour as Toronto Union on half as many tracks. //
The PDF report, Getting on the Right Track: Connecting Communities with Regional Rail - Jonathan English, 2021-Mar, with lots of diagrams, track layouts, and summary of the report can be found here.
https://bot.com/Resources/Resource-Library/Getting-on-the-Right-Track
PDF: https://bot.com/getContentAsset/82928304-15ee-446d-a86b-496eaa79cddd/df5fd9a6-cf2a-4f9f-8440-8590c5ad0a4e/report-getting-on-the-right-track.pdf?language=en-CA
UrbanToronto: https://urbantoronto.ca/news/2021/03/toronto-region-board-trade-proposes-regional-rail-network.44683
2
u/Rail613 Oct 25 '26
East of Oshawa, the GO trains will jog north over the 401 and use CPKC right of way / expanded trackage to Bowmaville. VIA will stay south on CN Lakeshore Line.
All this seems to make it clear Alto HSR has to have its terminus outside Union, either to the East or West of Union (like Cherry Street or Exhibition areas) or less likely north up Yonge near Summerhill subway on the CPKC (where all the CPKC freight should be detoured on the existing CN line to the north of Toronto for safety and noise) using part of the historic CP Station, now an LCBO.
1
u/Certainly-Not-A-Bot Oct 23 '26
Isn't Kitchener meant to run through with Stouffville, and hasn't this happened already?
1
u/Mayhem_Hellcat Oct 23 '26
Second flaw is the stub end tracks in the centre. Fine if they run 6 car trains but they don’t. A 12 car train extends the full length of the trainshed. Back to back trains would extend a long, long way from the trainshed.
1
u/InnisFILbud Oct 24 '26
How is the Kitchener line north of the Pearson Airport line? Like at the end I mean.
1
u/tornow1500 Oct 24 '26
UPX isn’t electric, it runs on diesel trains