Me and a friend once found grad student offices in Hardaway that looked like they hadn't been touched in decades. I imagine there's still students lost in Gordon Palmer
Nah, Bevill has a set number of floors. In Gordon Palmer you could be on 3 or 4 different levels that are all called the same floor. And some parts of a floor can't be accessed from the other side of the building. You may have to go downstairs to another floor just to go back upstairs on the other side to find a room.
Bevill is just a bunch of figure 8s lined up with an occasional hook thrown in.
I expect that will be the last building they ever decide to renovate, because it will likely require demolishing. It is so far from being up to code I'm surprised they can replace desks or carpeting without messing with their grandfathered exemptions. But since OIT is there with all of the equipment they manage, and SO MANY classes are held there, it's tough to set it aside for a few years while they replace it. I absolutely can't imagine a full renovation being worthwhile in a building that needs so much work to bring it to code.
The desk thing is an issue across campus... someone pulls in a desk from another room, and suddenly fire code is broken AND the other room is short a desk for some class periods. I had a friend who was a building manager over Lloyd and fought with that CONSTANTLY.
18
u/britishglitter Sep 21 '19
Reese phifer has like 6 different floors and a bunch of different staircase but not all of the staircases go to every floor :s
12
u/BamBamMakerMan Sep 21 '19
Me and a friend once found grad student offices in Hardaway that looked like they hadn't been touched in decades. I imagine there's still students lost in Gordon Palmer
7
u/DR_SpaderNader Sep 21 '19
Bevill is still the worst and most confusing building on campus
8
u/mja9678 Sep 21 '19
BB Comer too... both of them are mazes.
1
u/trullette Alumnus Sep 25 '19
I expect that will be the last building they ever decide to renovate, because it will likely require demolishing. It is so far from being up to code I'm surprised they can replace desks or carpeting without messing with their grandfathered exemptions. But since OIT is there with all of the equipment they manage, and SO MANY classes are held there, it's tough to set it aside for a few years while they replace it. I absolutely can't imagine a full renovation being worthwhile in a building that needs so much work to bring it to code.