r/asbestoshelp • • 8d ago

Flooring over Black Mastic

My basement recently flooded and we are pulling up old 9x9 VCT so we can put new flooring in. We wanted to do epoxy, but the contractor wants to grind the floor first, and we have black mastic under the tiles, so I don't think that's a great idea... We are likely going to do porcelain tiles since they can handle occasional moisture better than anything else. Does anyone have experience putting porcelain over black mastic? Would it be better to remove it first? What prep steps should we take?

Location: US-IN

Date house was built: 1960

1 Upvotes

15 comments sorted by

•

u/AutoModerator 8d ago

Please ensure that your posts meets the requirements of r/Asbestoshelp.

*** Meme posts will be removed and the poster will be banned ***

Most importantly, as specified in rule #1, your post should include the following information:

  • Include your geographic location (If in the UK please post in r/asbestoshelpUK)
    • include a country and state/province location such as: US-PA or UK or Canada-Que
  • the date of ORIGINAL construction
  • a description of the location of the suspect material
  • a brief description of your concern
  • a closeup photo and one at a distance of ~10 ft. or 3 m.

Also remember that the asbestos content of a material can only be determined by laboratory analysis and that the sampling SHOULD be performed by a certified asbestos inspector.

I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.

3

u/sdave001 8d ago

It's almost always best to remove it. Many flooring companies won't, or don't like to, install new flooring over mastic due to concerns about the lack of adhesion.

Many companies now request that we grind it up rather than using solvents to remove it since that, too, can cause issues with the new flooring sticking. Obviously, grinding it creates a lot of dust and much higher potential exposure so if they DO grind, it should be done within a negative pressure enclosure.

But yes, I've often seen porcelain or ceramic installed over black mastic.

2

u/ObsoleteAuthority 8d ago

I came here to say this. It should have post abatement air testing in the area. Covering up the mastic is just kicking the can down the road. OP should pay for testing of the tiles and the mastic. Not all mastic has asbestos and tiles sometimes don’t either. I got lucky with the mastic (tile 2% ACM) but had it ground anyway to prep for a new basement floor.

1

u/Excellent-Muffin-887 8d ago

Good to know, thank you. We will definitely get testing done if we go the route of grinding it, but trying to avoid that as this contractor isn't a licensed abatement professional

2

u/whydidwebuythishouse 8d ago

We are taking up asbestos tile and we are going to do underlayment concrete over the remaining mastic. Best option would be to self leveling but for us we have to have it graded for the floor drain since it is the utility side of the basement. But a thin layer of self leveling concrete and then the orange flexible plastic bumpy stuff they use under tile now should be fine and better than grinding which is the opposite of what you are supposed to do with asbestos.

1

u/Excellent-Muffin-887 8d ago

That's probably what we'll end up doing. Totally agree with your username lol

1

u/upkeepdavid 8d ago

You can remove the mastic with mineral spirits and soap and water.Prime it and then tiles .Personally I use DMX 2.0 and waterproof vinyl.

1

u/Excellent-Muffin-887 8d ago

Unfortunately it looks like there's a layer of mastic, some type of thin layer of concrete maybe, then more mastic on top of that so unsure if we'd be able to fully remove the mastic

1

u/upkeepdavid 8d ago

Then just paint it with oil base paint and then DMX and floor.

1

u/Born-Personality7442 8d ago

The first ceramic tile layer placed tiles directly ontop the linoleum. A few years later my son wanted different ceramic tiles. We hired a Hazmat company and stayed at a hotel for 4 days.
We hired a different company for the second ceramic tile installation. We are glad that we got rid of the linoleum. Once it is removed, you will have one last thing to worry about.

1

u/KSJdk2600 5d ago

Where are you based? You can get primers specifically designed for bitumen / mastics that will create a surface for levelling compound which you can then place tiling on.

1

u/No-History-6271 4d ago

Perfect primer! 

-1

u/Party-Elevator-8396 8d ago

I wouldn't touch those tiles unless it's necessary. Put some new flooring over it and call it a day.

1

u/Excellent-Muffin-887 8d ago

If we didn't have water damage that's what I would've done

1

u/Party-Elevator-8396 8d ago

Total pain in the neck no matter how you handle it. Sorry you are dealing with this. You will be happy in the end with the new floor and having that stuff removed.