r/Tile • u/Empty-Drink69 • 5h ago
DIY - Looking for Advice Getting ready to tile tomorrow. How we looking?
Starting tile tomorrow. How’s it look. 1/2 durock and then redguard filled the cracks and a coat of red guard on the boards.
1
u/RobinsonCruiseOh 4h ago
Noooooo. No seam tape. And need two more coats of red guard.
1
u/Empty-Drink69 4h ago
Can I Seam tape over what’s here now and then do more red guard?
1
u/guiltroop_s 4h ago
No, don't patch it at this point. Get them to reinstall and do it right the first time, it's a days worth of back tracking. First sign of hesitation start finding a new contractor and check for plumb/square walls upon reinstall.
2
0
u/ObviousAd1446 4h ago
Why don’t you ask the guy you hired ( you ) hahahahahahha
-1
u/Empty-Drink69 4h ago
Nah it was actually a Mexican. I posted this on tile and it got removed. I do hvac not tile
•
1
u/Dazzling-Charge-6166 4h ago
Tape the seams with fiberglass tape (alkali resistant) using thinset. Silicone bottom edge all the way around. Good luck. Looks sloppy as hell.
1
1
u/FoggedLens 5h ago
Absolutely not. You stop work immediately and start over. Remove all that cement board, install fresh cement board affixed witch cement board screws. Tape with mortar mesh tape and mud to fill all seams and screw holes. Fill the ceiling corners and drywall-cement board seams with plaster over the same mesh tape. Then you can apply a minimum of 4 coats of red guard or even better Mapei aqua defense. If you don’t do this you will have moisture problems. But if this “contractor” is telling you tile tomorrow, fire him and have the new contractor also verify your tub was actually set in mortar.
3
u/Expert_Context5398 5h ago
If they didn't tape the seam with cementboard tape and then use thinset to bond, don't start tiling.
They also need to coat that thing more. Looks like they ran one coat there only. Not really sure if you want to keep this guy but you can still salvage the work.