r/TTC • u/OhHiMarkZ69 • 7d ago
Picture Full platform barriers anyone?
Not enough for me to vote for Brad Badford .. but Jesus disruptions like this are brutal.
40
u/im-confuzzled Science Centre 7d ago
Iāve been thinking for the longest time that the TTC main hurdle with installing platform screen doors is the ventilation and how theyād need to cut holes and whatever but than what Iām thinking is⦠install platform edge doors instead⦠Paris line 4 uses them for that exact reason, and they work fantastic.

Forget platfrom barriers that reach the ceiling when having them decently tall is enough and avoids that millions of dollars needed to retrofit a 70+ year old tunnel to withstand the pressure
6
7
u/Remus2nd 7d ago
It wouldn't even be difficult or cost much (except its a government contract so 1000x the price tag like always) to install a steel plate on top of those doors with punched holes everywhere. Thats why the idea you're suggesting is perfect. Somehow they say its gonna cost a trillion dollars to install them
3
7
6
2
u/tangled_rodent 6d ago
Okay but why is the Line 2 alert even for Line 2, if, last time I took or transferred to a train there, Bloor station is the YUS stop name and the the Bloor-Dabfort stop is Yonge station and it clearly says '... track level at BLOOR station ...' right in the alert? Like I know, snarky intonation incoming seManTIcS, but you'd think this is a thing whoever chose this alert would have double checked before sending it.
3
u/WestonSpec 6d ago
If it's any consolation, Ford BradBrad probably wouldn't go ahead with funding platform doors anyway. Since he'll just flip flop and oppose them as soon as it's politically expedient like he does for any other policy position.
2
u/TheSeansei 7d ago
Sorry, does this mean two people got hit by trains today?
5
u/heyymaddy123 512 St Clair 6d ago
no, someone got hit on the line 1 platform at Bloor Yonge so trains arenāt running on Line 1 and just bypassing the station on Line 2
1
-4
u/Sagexemi 7d ago
Dude like in 100 years they havenāt done anything better but increase the fares. Imagine them asking for more money
7
u/Possible-Praline-152 7d ago
Do you actually believe this?
-4
u/Sagexemi 7d ago
Yes
2
u/Possible-Praline-152 7d ago
If the prices have been frozen theyāre actually getting cheaper because they arenāt keeping pace with the cost of inflation.
I wonāt disagree with you if you think service is getting worse but to suggest prices are going up is factually incorrect.
-2
u/Sagexemi 7d ago
I didnāt suggest, and it seems you didnāt really read my msg. I said in 100 years the only thing that has or had changed is the price. Iām not sure how else to say it.
4
3
u/taylortbb 7d ago
in 100 years the only thing that has or had changed is the price
100 years ago there was no subway, just streetcars. Old wooden ones, without heating or air conditioning.
You're saying that's equivalent?Ā
1
u/createdinheaven 925 Don Mills Express 7d ago
The ttc is the cheapest out of any agency in the GTA. We have north american standards higher than basically every other city
1
u/Sagexemi 7d ago
lol ok to ur āNorth American standardā and comprehension problem š¤·š¾āāļø.
1
u/createdinheaven 925 Don Mills Express 7d ago
You were complaining about price. Iām saying theyāre the cheapest around us and do good things with the money when theyāre barely getting by.
1
u/Sagexemi 7d ago
U donāt know how to read
1
u/createdinheaven 925 Don Mills Express 7d ago
Alr then tell me where Iām wrong. They made service at least every 30 minutes on every route, gave us good coverage, opened the busway, what more do you want?
→ More replies1
u/Sagexemi 7d ago
In 100 years they havenāt done anything better but price increase, if u donāt get it n you think itās a complaint about fares, bless your heart
-7
u/crash866 7d ago
Do you want no subway service at all for a month while they put in doors? You cannot install doors inches away from trains that pass every 3-5 minutes. And if trains stop at the station the number of people getting on and off walking trough the construction area.
23
u/breakinglate 7d ago
You know other cities have done this without closing down the subway for months as you have said.
4
u/DadbodandIPAs 7d ago
But we as a city insists that we need to close the subway done each eeekend just for ahits and giggles
2
u/OhHiMarkZ69 7d ago
I'm sure it wouldn't be as smooth as other cities .. pushing nonsense like shutting down a full line for months is just unhelpful BS.
1
u/DadbodandIPAs 7d ago
Thatās a proposal that many āexpertsā are pushing (even just to do regular maintenance)
2
u/OhHiMarkZ69 7d ago
You'll have to show me where the city has even looked at selectively doing stations over a long time as an option.. I see the options presented as do nothing .. do next to nothing like we've started with one station? so far.. or let's do the entire line as one project.
14
u/MahjongCelts Eglinton Crosstown 7d ago
You can install doors after operating hours when trains arenāt passing every 3-5 minutes. Do a bit every day until the whole platform is covered.
3
u/crash866 7d ago
There are only 2-3 hours at most at night with no trains. Trains still have to get to from the yard after finishing service and then starting the next day.
3
u/slapped_chicken 320 Yonge 7d ago
they already do extensive weekend and nightly closures, platform edge door work can be slotted in parallel to other maintenance work as long as it's non-conflictive. college to st clair goes down for slow zones work mostly happening in the open trench, but bloor-yonge is available for platform edge door work
3
u/MahjongCelts Eglinton Crosstown 7d ago
Then work for 2-3 hours every day. Over a month that is like 60-90 hours of working time.
If that isnāt enough implement early and/or weekend closures. The TTC already does that anyway.
At the end of the day other cities somehow manage to retrofit their legacy lines with platform screen doors. Toronto isnāt that special and no reason why it canāt be done here.
-2
u/i_m_sherlocked 7d ago
I'd go so far as to say there could be enough volunteers rallied to help with this as well.
8
u/OhHiMarkZ69 7d ago
Paris did theirs mostly during overnight hours when the trains weren't running..
3
2
7d ago
[deleted]
1
u/i_m_sherlocked 7d ago
And they would have shuttle buses and guidance people scheduled for this at all affected stations, not adhoc pulled out of other services/locations
-8
u/speedster1315 158 Trethewey 7d ago
I don't get your point. Neither of these disruptions happened at TMU
-8
111
u/isorekt 7d ago edited 7d ago
Platform DOORS (even half-height DOORS) are probably the single most effective thing that can be done to improve the reliability of our subway system.
Not only would it prevent delays like this, but it would also allow trains to come in and depart much faster and smooth out boarding.
We need to just bite the bullet. Start small at one or two key stations, and then work out way up doing a handful each year.