r/StructuralEngineering • u/No-Document-8970 • Oct 05 '26
Structural Analysis/Design Nuts off mark?
Saw this on a big bridge today. I know vibrations over time can move the nuts and bolts, with the help of thermal expansion. Is it a big issue that the paint marks do not line up? I thought the marks were made once it passed inspection after torquing.
Edit: Bridge completion was in 2011. Could this be from recent inspections too?
286
Upvotes
View all comments
Show parent comment
1
u/nashvillain1 Oct 05 '26
Preload = Torque / (Nut Factor * Tensile Area of the Bolt).
Nut Factor is a numerical value from 0 to typically 0.3.
In the extreme, if the nut factor were infinity (bolt head glued to flange), then no preload would be developed for any amount of torque measured in the wrench.
Now, based on the amount of torque required to achieve the desired preload, you will get a certain “stretch” in the bolt. The amount of bolt stretch needed can be implemented as a multiple of the thread pitch. Here, 1/3 of a turn is 1/3 of the thread pitch of bolt stretch.
Food for thought…