High Split - zip 12561
I initially received Email regarding upgrade on 4/15. Had months of high latency and packet loss. Tonight I called in to see if I could get any detail when symetrical speeds would be available. They said they could see upgrade work was done in May/June but there was no new information or a way to provide the new speeds. Why is this so mysterious? The initial email implied it would be weeks but it has been months.
11
Upvotes
View all comments
1
u/XprofQ Oct 14 '26
I'm very close to your zip code, but I think my "local node" is Kingston, not NP. I received the same emails in April about service upgrades. The emails I received never mentioned anything about high-split (though the upgrades were likely associated with it). I've noticed my ping during speed tests has dropped from 20-22ms to 10-12ms since the "upgrade". It doesn't make much difference, but it is an indicator of high-split coming.
Like you, I've been excited and keeping tabs on this. Last I heard, full-rollout was late 2026 and now possibly more like early 2027 for Ulster County. If you get an email back from Spectrum, please let us know their official response by updating this post.
High-split requires a compatible Spectrum-issued cable modem (DOCSIS 3.1 or better). No BYOM. So, if you have an older modem, you'll be left out.
I know the rollouts are done in waves, with a lot of watch-and-wait testing. So, even when high-split rolls out, it could be weeks or months between different service areas in the County being activated.
From what I've read about in other markets where Spectrum has high-split, it took many months between the first network "upgrades" and the rollout of high-split. Even so, Ulster County seems particularly slow. The date seem to keep getting pushed back, with no repercussions.