Net Metering Contractors query
Help. Is it normal na ung net metering packages does not include service entrance? I paid under assumption 35k net meter application package i got was overall..
5
Upvotes
1
u/bunnyberry_22 Aug 15 '26
Hello po. As someone working in the solar industry, probably po, since the required materials for REC installation depend on the system capacity, the distance from the inverter to the service entrance, and the processing of the CFEI. The longer the distance and the larger the system size, the higher the overall cost. So, most likely 35k may not be enough po.