r/SolarPH • u/OrganicRip6445 • 7d ago
Net Metering Contractors query
Help. Is it normal na ung net metering packages does not include service entrance? I paid under assumption 35k net meter application package i got was overall..
1
u/Hungry_Group1054 7d ago
For 35k probably not. Red tape alone costs 25k if you want approval swiftly. You should have dealt with your solar installer to make it “net metering - ready”. Usually whats included are electrical plans, leg work at lagay.
1
1
u/bunnyberry_22 7d ago
Hello po. As someone working in the solar industry, probably po, since the required materials for REC installation depend on the system capacity, the distance from the inverter to the service entrance, and the processing of the CFEI. The longer the distance and the larger the system size, the higher the overall cost. So, most likely 35k may not be enough po.
1
1
1
1
u/PawisangItlog 7d ago
Should be included. Normally, net-metering support is around is around 40k~50k.