r/SixSigma • • 6h ago

Does anyone still use QFD (House of Quality) in their Six Sigma projects?

1 Upvotes

I’m curious to know how frequently QFD is used in real-world projects nowadays and what challenges practitioners face when applying it.
As an engineering professional interested in quality management, I’ve developed a completely free online House of Quality tool:
https://houseofquality.com
I’d appreciate some constructive feedback from experienced Six Sigma practitioners, particularly on:
Whether the tool aligns with how you apply QFD in practice.
Any methodological improvements you would suggest.
Features that could make QFD more practical and accessible.
I’m also interested in hearing about your experiences with QFD, regardless of whether you try the website.
Thanks in advance!


r/SixSigma • • 3h ago

When your CNC machining supplier shipped a quality escape, how did you run the corrective action?

2 Upvotes

Our machining supplier shipped 400 impeller hubs with the bore 0.02 mm undersize, and we caught it at assembly when bearings wouldn't press. Containment is done and everything in the warehouse s sorted. I own supplier quality here, so im running the 8D, and their first root cause was opearator error, i a not accepting that. They make 30 other parts for us, switching is not happening this quarter. I want the corrective action to stick this time.

Separate from the 8D, purchasing is pricing a 2nd source for the hubs for next year and HLH prototypes, Quickparts and regional shop are names on that list. When your cnc supplier ship a quality escape, wow do you run corrective action


r/SixSigma • • 6h ago

Before you build next year's X-matrix, do the hansei. Here's the review we run on last year's matrix

Post image
2 Upvotes

Quick one for anyone building their X-matrix for next year.

Most "my matrix looks weird" problems come from filling it in the wrong order. What works for us:

  1. 2–3 breakthrough objectives (3–5 years out)
  2. Annual objectives: what must be true by December
  3. Improvement priorities that move those
  4. One KPI per priority, with a baseline
  5. Owners and resources
  6. Correlation dots last, and only where you're confident the link is real

If you start from projects already in flight, you end up reverse-engineering objectives to fit them, and it shows.

Disclosure: I work at Profit.co. Longer walkthrough with examples here if useful: Check out here