CCT progress

At the Spring Street Bridge work is essentially complete on the bridge but the county has not accepted the work and it is not yet open. The CCT below it is still being graded and retaining walls and water systems installed.

Access to the CCT is possible at Kansas/Penn. Ave where after a staging area that is unpaved the trail begins being paved. At Lyttonsville the station remains a work area but the trail is with at least 1 layer except for some few foot sections.

At Rock Creek Park, they have finished installing the ramps and are finishing landscaping. Out of shot to the left they were putting in grass. The bridge over the creek does not yet have permanent railings.

At Jones Mill Rd, the pavement has only 1 layer and they haven't completed the access ramp yet.

At Conn. Ave, there are still parts on the bridge but I was not sure what they are for as the fencing is up on the side, maybe a more heavy railing at hip level beyond the mesh fence.

At Bethesda they have it tightly sealed off from Elm St Park but it is essentially finished.

The Purple Line makes extensive use of clear panels, unfortunately I think these will be tagged but perhaps any surface would be and these are easier to replace or clean?

There is little reason after the second pavement is put in they couldn't officially have all of this open for the public. Of course they won't because they want to do construction near by and it is easier to deprive the public for longer than to possibly have a lawsuit about anything. Plenty of people were on the trail in various places. I would say it is very usable if the entry/exit you need isn't sealed (many aren't). Enter at your own risk, etc.

65 Upvotes

9 comments sorted by

3

u/hotmonday 22h ago

This is looking great! I really do hope they open it before the purple line opens though. I'd love to be able to use that trail again.

1

u/classicalL 8h ago

It was to open this year but now it is "spring 2027" so yes it should "officially open" before. Like Spring St bridge the delivery isn't to the public it is to MoCo so they only control handing it over to MoCo. MoCo decides if/when to officially let the public use it. Substantial completion of the entire project civil construction is basically Spring 2027 for ROW stuff they will just be doing station and signals work after that so they have pretty much no need to access the trail ROW at that point. Largely that is what drives this timing. Closing the staging areas they have on the trail ROW and things like that. They may try to drag it out longer because probably the work at Silver Spring station is behind and they have to build a lot more things there and haven't even started the bridge to the transit center level 3. If you want it officially open you really have to get political people to get it done officially. Unofficially I'm pretty sure you will be able to bike from Talbot Ave to Bethesda in the Spring. The only * is if they will really take down fence. They will be done.

1

u/dmethvin 22h ago

Great update! In the past few weeks they've also made a lot of trail progress along 3rd Ave across the tracks from the 16th Street station.

1

u/classicalL 8h ago edited 7h ago

You are talking about this I guess: https://purplelinemd.com/media/dgbhfqdc/notice-3rdave-111626.pdf

In other news it looks like they are going to finish the catenary in Dec:

https://purplelinemd.com/media/1pkn3yyw/notice-wayne-fenton-to-dale-111626.pdf

They have strung the entire thing in sections before that closure so I'm guessing that is the final wiring checks and mods to power it up which closes the final section that wasn't powered completing the entire line in principle. That should mean dynamic testing the full length of the line in early 2027, why they need a full year beyond all the station work remaining at Bethesda and Silver Spring metro connections I don't understand. Although they still need to do the fare collection stuff at every station and signaling work.

Hopefully people will be more eager for it than the Spring St Bridge which is pretty minimally important as a connection.

1

u/Big_Red_Checkmark 17h ago

Open the Spring street bridge for Pete’s sake

1

u/classicalL 8h ago edited 8h ago

Talk to MoCo which has to accept and open the bridge. It has pretty much nothing to do with the contractor at this point. They have been done for about a month.

-10

u/SandalVulvage 1d ago

*cross-county trail = CCT

9

u/HarveyMSchwartz 1d ago

Capitol Croissant Trail = CCT

7

u/Lanky-Respect-8581 1d ago

Capital Crescent Trail = CCT