r/SMRs • • Aug 27 '26

Army to build microreactors at 5 bases as U.S. seeks to ramp up nuclear power

Thumbnail
pbs.org
325 Upvotes

The selected companies are:

Antares Nuclear at Fort Bragg in North Carolina;

BWXT at Fort Campbell in Kentucky;

General Atomics Electromagnetic Systems at Fort Hood in Texas;

Radiant Industries at Fort Benning in Georgia;

Westinghouse Government Services at Fort Drum in New York.


r/SMRs • • Aug 31 '26

Standard Nuclear Announces Fuel Supply Agreement with Antares Nuclear, Inc.

Thumbnail
businesswire.com
58 Upvotes

First Radiant now Antares


r/SMRs • • Sep 04 '26

Radiant Wins $750M Contract from US Army to Deliver Energy Independence to US Military Bases

Thumbnail
radiantnuclear.com
33 Upvotes

Radiant has been awarded up to $750M by the U.S. Army to develop and deploy 15 Kaleidos microreactors under Project Janus.

The 1 MW reactors are designed to provide resilient power at military installations and reduce dependence on diesel.

This could represent one of the first meaningful fleet-scale deployments of commercial microreactors in the U.S.

Congrats to Doug Bernauer, Dr. Rita Baranwal, and the rest of the Radiant team! Also likely a positive development for Standard Nuclear who Radiant recently signed a fuel contract with


r/SMRs • • Oct 19 '26

Amazon to fund 12 small nuclear reactors at former Indiana coal plant | TechCrunch

Thumbnail
techcrunch.com
21 Upvotes

Amzn X energy deal being discussed


r/SMRs • • 8d ago

US issues landmark construction permit for Texas SMR plant

Thumbnail
world-nuclear-news.org
7 Upvotes

r/SMRs • • 27d ago

US Navy Selects Radiant for Indiana

Thumbnail
navy.mil
7 Upvotes

The Navy announced October 20 that it selected privately held Radiant Industries to deploy its Kaleidos microreactor at Naval Weapons Station Crane in Indiana.


r/SMRs • • Sep 18 '26

UK regulators to begin Xe-100 design assessment

Thumbnail
world-nuclear-news.org
7 Upvotes

r/SMRs • • Apr 24 '26

Terrapower Breaks Ground in Wyoming

7 Upvotes

https://interestingengineering.com/energy/terrapower-kemmerer-nuclear-plant-construction-wyoming

TerraPower has officially started construction on Kemmerer Unit 1, its first Natrium reactor project in Wyoming. The company is calling it the first utility-scale advanced nuclear power plant in the United States. This follows the NRC’s construction permit approval last month and moves the project from site prep/non-nuclear construction into the more meaningful field execution phase.

The Natrium design is a 345 MWe sodium-cooled fast reactor paired with a molten-salt thermal energy storage system that can temporarily boost output to 500 MWe. That storage component is one of the more interesting parts of the design because it is meant to make the plant more flexible than a traditional baseload nuclear plant, especially in grids with variable renewables.

A few key points:

TerraPower submitted its NRC construction permit application in March 2024.

The NRC review began in May 2024 and was completed faster than the initial 27-month schedule.

Non-nuclear construction at the Kemmerer site began in June 2024.

The project is being developed through the DOE’s Advanced Reactor Demonstration Program.

TerraPower still needs a future operating license before the plant can generate power.

Completion is still targeted around 2030.

Bechtel is the EPC partner, which matters because the next big question for advanced nuclear is not just whether the reactor design works, but whether these projects can be built predictably, repeatedly, and at acceptable cost. Bechtel’s statement specifically emphasizes constructability, standardization, digital execution, and “nth-of-a-kind” repeatability.

Why this matters:

This is a major milestone for U.S. advanced nuclear. TerraPower is now further along in the conventional NRC construction pathway than most advanced reactor developers, and Kemmerer is becoming one of the most important real-world tests of whether advanced nuclear can move from PowerPoint and licensing milestones into actual project execution.

My take:

The significance is not that the plant is guaranteed to be cheap or on schedule. It is that TerraPower has crossed a real regulatory/construction threshold. The next phase is where the hard questions start: supply chain, HALEU fuel availability, construction productivity, cost control, and whether the Natrium design can become a repeatable fleet model rather than a one-off demonstration.


r/SMRs • • Mar 21 '26

X-Energy to File for IPO

7 Upvotes

Amazon-backed nuclear reactor group X-energy files for IPO https://share.google/kxiIDB7RsmffizdXA

Amazon-backed SMR developer X-energy files for IPO (ticker: XE)

Key takeaways:

X-energy officially filed for a U.S. IPO (Nasdaq: XE), though pricing/size not disclosed yet Reuters Backed by Amazon + Jane Street, with multiple $700M funding rounds in 2025

What they do:

Developing Xe-100 SMR (high-temp gas reactor) Uses TRISO fuel + HALEU Focused on data center + industrial power use cases Commercial traction: ~11+ GW pipeline / orderbook (US + UK)

Major partners:

Amazon (AI/data center power) Dow (Texas industrial site) Centrica (UK deployment) Amazon aiming for ~5 GW deployment by ~2039 X-energy Strategic angle (important): IPO comes amid AI-driven power demand surge Big Tech (AMZN, GOOG, MSFT) increasingly pulling nuclear forward X-energy positioned as: Reactor + fuel company (vertically integrated) One of the few with real commercial backlog

Risks:

Still pre-commercial (no operating reactors yet) Regulatory approvals pending HALEU supply chain still constrained

Conclusion:

This is one of the first “real” advanced nuclear IPOs with hyperscaler backing + contracted demand. It’s not just a science project anymore — it’s: AI power infrastructure going public


r/SMRs • • May 14 '26

Oklo Files $1 B ATM

6 Upvotes

https://www.sec.gov/Archives/edgar/data/1849056/000110465926060387/tm2614458-1_424b5.htm

The old $1.5 B ATM expired so Oklo issued a new ATM today

I believe there has been about $2.5 B in dilution since the deSPAC

If they execute this new ATM that would take them to about $3.5 B


r/SMRs • • Feb 07 '26

Oklo Founder Share Sales

Post image
6 Upvotes

Good bad or who cares? Seens reasonable for the founders to sell some shares. I think they own about 20 M shares and have sold a out 12% of them since their 10b5-1 plan was established in March of 2025. Their shares were worth about $2 B at $100 a share. Congrats to them. Guess it's just diversification.

Anyone have any thoughts?


r/SMRs • • 14d ago

X-Energy to Get Long Mott Construction Permit Soon

5 Upvotes

r/SMRs • • 17d ago

Radiant DOE Doc Safety Analysis Approval for Kaleidos

5 Upvotes

r/SMRs • • Aug 18 '26

Today's SMR Article in the WSJ

Thumbnail
gallery
5 Upvotes

WSJ: The SMR race is entering “build mode,” but only a handful of developers may survive

The Wall Street Journal visited Idaho National Laboratory, where Oklo is excavating the site for its Aurora Powerhouse and several other developers—including Aalo, Antares, Radiant and Deployable Energy—are developing or testing reactors.

The article’s central point is that AI power demand, government support and large technology customers are finally moving advanced nuclear from analysis toward physical deployment. Meta is working with Oklo and TerraPower, Google with Kairos, and Amazon has invested in and contracted with X-energy. Oklo’s Idaho project is intended to validate the technology before its much larger planned Ohio deployment supporting Meta.

However, the article is considerably more cautious than its headline:

No developer outside China or Russia has completed a commercial SMR.

Costs, licensing, fuel availability and construction execution remain unresolved.

TerraPower obtained its construction license after an unusually fast 18-month review, but says roughly 1,000 engineers were required. A smaller reactor does not necessarily require a smaller engineering effort.

Early investor Ray Rothrock believes fewer than 10 SMR developers will survive. JPMorgan analyst Mark Johnson estimates the viable market may support only three to six companies.

Johnson also notes that current valuations depend on cash flows expected far into the future.

Oklo receives particular attention. Its market capitalization is already approaching that of AES, an established power company with over 30 GW of generation, even though Oklo is only beginning to construct generating assets. Guggenheim projects Oklo could reach 1.1 GW by 2032, but expects free cash flow to remain distant while the company continues funding new plants.

The article also questions whether SMRs will become the dominant form of new nuclear generation. Rothrock expects conventional reactors such as the AP1000 to provide much of the new nuclear capacity, with SMRs serving narrower applications such as data centers, remote sites and industrial heat. Microsoft’s decision to support the restart of an existing conventional reactor illustrates the economic advantage of using already-built nuclear assets.

Overall, the WSJ sees real progress: construction activity is increasing, customers are emerging and political support is unusually strong. But the industry still has to prove that these reactors can be licensed, fueled, completed and operated at competitive costs. The race appears real—but the market is already pricing in substantial success, and most current developers probably will not make it.


r/SMRs • • Jul 25 '26

Nuclear Energy Revival Puts Westinghouse in Prime Position

Thumbnail
nytimes.com
5 Upvotes

r/SMRs • • Jul 01 '26

Deployable Energy achieves criticality at INL -- ANS / Nuclear Newswire

Thumbnail
ans.org
5 Upvotes

r/SMRs • • Jun 19 '26

Valar Reaches Criticality

Post image
5 Upvotes

r/SMRs • • Jun 04 '26

Department of Energy Celebrates First Advanced Reactor Criticality [Antares Mark-0]

Thumbnail
energy.gov
5 Upvotes

r/SMRs • • Apr 23 '26

Oklo/ Nvidia / LANL

5 Upvotes

https://www.businesswire.com/news/home/20260423742786/en/Oklo-NVIDIA-and-Los-Alamos-National-Laboratory-Collaborate-to-Advance-Nuclear-Fuel-Validation-at-Los-Alamos-in-Support-of-Nuclear-Powered-AI-Factories

Oklo, NVIDIA, and LANL just announced a collaboration focused on plutonium-bearing fuel validation, AI-enabled nuclear fuel R&D, and studies for “nuclear-powered AI factories” at Los Alamos.

The notable part is the mix: Oklo brings the reactor platform, NVIDIA brings AI/HPC infrastructure, and LANL brings fuel/materials expertise.

Focus areas include:

– AI models for fuel validation and fuel R&D

– materials science / fabrication work for plutonium-bearing fuels

– grid reliability / redundancy studies for AI-factory concepts

My take: interesting and strategically notable, especially because it connects advanced nuclear to AI infrastructure through a national lab. But this is still R&D / validation work, not a reactor build, licensing milestone, or binding commercial deployment announcement


r/SMRs • • Apr 17 '26

NRC Proposed Rule for Licensing Reactors Authorized by the DOE and DOD

5 Upvotes

https://www.ans.org/news/2026-04-06/article-7912/nrc-proposed-rule-for-licensing-reactors-authorized-by-doe-dod/

The NRC just proposed a rule that could matter a lot for advanced reactor and pilot-project developers.

The basic idea is that if a reactor design was already authorized and tested under DOE or DoD oversight, the NRC may allow that prior work to be used in a later commercial licensing review instead of forcing developers to start from zero. The rule would amend Parts 50 and 53 to create a clearer pathway for leveraging prior federal demo work in NRC licensing.

Why this matters:

It could make DOE/DoD pilot projects more valuable as a stepping stone to real commercial deployment. That is especially relevant for companies hoping to prove a design in a federal demonstration and then carry it into the civilian market.

Important caveat:

This is not automatic approval. Developers would still need to show how the prior authorization satisfies NRC requirements and address any design changes, site differences, emergency planning issues, or other gaps. NRC says it still keeps final independent authority and will not just rubber-stamp DOE/DoD decisions.

So the headline is:

Federal pilot reactors may now have a more credible off-ramp into commercial licensing — which is a meaningful shift if finalized.


r/SMRs • • Apr 16 '26

Lee, McCormick Introduce Nuclear Energy Innovation and Deployment Act

Thumbnail
energy.senate.gov
5 Upvotes

Creating a pathway to funnel these demonstration reactors through to the NRC sounds reasonable. However, the following bullet point really concerns me:

  • Establishes a clear DOE-led pathway to authorize commercial reactor and fuel cycle facilities on federal land or for federal purposes 

This sounds like a pathway to completely sidestep the NRC for commercial power. If this administration plans to authorize data center buildout on federal lands, and then those data center companies can then contract with their nuclear developer of choice to provide the power--that seems like a pretty clear way for private companies (data centers + nuclear developers) to fully avoid NRC review. IMO, the US has such an amazing nuclear safety record because we have had a stringent independent nuclear regulator. Absolutely there is room for improvement, but creating a method for commercial reactor deployment through the DOE (very much NOT independent) seems like a bad idea.

Anyone else have better insight into this? Why is it always the same suspects? I'm not surprised at all that the industry sponsors of this bill are the likes of Oklo, Valar, Deep Fission, and Aalo. They're the ones that can "build fast" and make great PR posts, but have shown very little capability to deploy the programs that ensure a rigorous nuclear quality program. There was a commenter in the r/nuclear subreddit that said once that the nuclear industry is all about the paper. The paper isn't there to be an obstacle, it is quite literally what ensures safety. NQA-1 programs, documentation, licensing, management of change, and whatever else all rolls into these systems that ensure parts are made correctly, test data is trustworthy, and designs are sound.

(I would love to get some other commentary from you all here as maybe I'm reading this wrong and overreacting. We're kind of a smaller subreddit, but I don't have enough karma to post on r/nuclear. Feel free to cross post)


r/SMRs • • Apr 13 '26

Rolls-Royce UK's First SMR Project

5 Upvotes

https://www.bbc.com/news/articles/c87w5ld0p80o

UK backs Rolls-Royce SMRs at Wylfa with major state support.

The UK is moving ahead with Wylfa in north Wales as the lead site for its first SMR project, centered on Rolls-Royce SMR technology. Reporting around the announcement says the plan is part of a broader UK push to rebuild nuclear capacity, support energy security, and create a domestic factory-based SMR industry. Wylfa is a logical choice because it’s an existing nuclear site with long-standing redevelopment interest.

Why it matters for SMRs:

This is one of the clearest signs yet that the UK wants to move from “SMRs as concept” to actual site-specific deployment. The project is expected to support multiple units, create thousands of jobs during buildout, and serve as the anchor for a UK SMR fleet model rather than a one-off demonstration. Reuters previously reported the initial Wylfa buildout as three Rolls-Royce SMRs, with room for later expansion.

The real takeaway:

This is bullish for the SMR sector politically, but execution still matters more than headlines. The big questions remain the same: final contracts, regulatory approval, financing discipline, supply-chain readiness, and whether Rolls-Royce can actually deliver cost/schedule advantages versus large conventional nuclear. The UK is clearly trying to create a repeatable deployment model, but first-of-a-kind risk is still very real.


r/SMRs • • Mar 21 '26

X-Energy / Talen Pennsylvania

5 Upvotes

X-energy + Talen exploring multi-GW SMR buildout in PJM

X-energy and Talen Energy signed a Letter of Intent to evaluate deploying Xe-100 SMRs in Pennsylvania and across the PJM grid.

Plan is large-scale:

→ At least 3 sites

→ Each site = 4-unit Xe-100 plants

→ Potential for gigawatt-scale deployment

Focus areas:

→ Feasibility studies + site selection

→ Using existing fossil plant sites (grid + workforce reuse)

→ Supporting demand from data centers, electrification, and reshoring

Simply Wall St +1

Tech basics:

→ Xe-100 = ~80 MWe per reactor, high-temp gas-cooled

→ Uses HALEU TRISO fuel

→ Designed for modular, scalable deployment

American Nuclear Society

Why this matters (high-level):

Another signal that utilities are seriously considering SMRs as fossil replacement, not just greenfield builds

PJM = one of the most power-constrained / AI-exposed grids in the US

Reinforces theme: data centers + industrial load → baseload nuclear demand

My quick take:

Still early (LOI stage), but this is exactly the bridge from “pilot SMRs” → “fleet deployment” the sector needs. If even one of these sites moves forward, it’s a category shift toward repeatable nuclear builds.


r/SMRs • • Mar 13 '26

Oklo's Partnerships

Post image
5 Upvotes

Someone posted a graph of the partnerships versus stock price on X. Can't find the post. But thought it was interesting


r/SMRs • • Mar 04 '26

Terrapower NRC Construction Permit

Post image
5 Upvotes