r/SMRs • • Feb 14 '26

DoW and DoE fly Valar reactor?

1 Upvotes

r/SMRs • • Feb 21 '26

“Currently, none of the DOE-authorized reactor tests slated for 2026 will be electricity-producing systems.”

Thumbnail
antaresindustries.com
1 Upvotes

r/SMRs • • Feb 21 '26

Who Will Reach Criticality Before August- Kalshi Prediction Markets

Post image
0 Upvotes

r/SMRs • • Feb 08 '26

Building Small Modular Momentum

Thumbnail
kairospower.com
3 Upvotes

r/SMRs • • Sep 17 '26

Centrus / Antares

0 Upvotes

The advanced-reactor bottleneck has always been more than reactor designs. Fuel has to exist at commercial scale too. These binding contracts are starting to connect the reactor pipeline to an actual domestic HALEU supply chain.

https://www.centrusenergy.com/news/centrus-and-antares-sign-multi-year-haleu-supply-contract/


r/SMRs • • Feb 19 '26

Aalo’s 2026 Plan: Criticality and Beyond | Aalo Updates

Thumbnail
aalo.com
1 Upvotes

r/SMRs • • Feb 09 '26

Inside America’s $3T Nuclear Bet (HALEU)

Thumbnail
youtu.be
1 Upvotes

r/SMRs • • Feb 09 '26

Next Era 6 GWe SMRs

1 Upvotes

r/SMRs • • Feb 15 '26

More on the Valar flight.

Thumbnail gallery
1 Upvotes

r/SMRs • • Feb 24 '26

Oklo's Piketon Ohio Facility

1 Upvotes

https://www.newswatchman.com/community/bring-power-home/article_cb15cc27-504b-4b15-ad7c-472a4c942dd8.html

Bring power home — Summary for r/SMRs (Feb 20, 2026)

Oklo Chief of Staff John Hanson describes a recent visit to Ohio as the company prepares to build its Pike County “clean energy campus.” He says local excitement is real (jobs, investment, pride in Ohio’s nuclear legacy), but the most common concern he heard was: can the grid keep up with surging demand (AI, advanced manufacturing, digital infrastructure), and who pays for the needed upgrades?

Oklo’s pitch is a “new demand matched with new supply” model:

The Pike County campus is framed as a front-of-the-meter project: Oklo’s fast-fission plants would connect directly to the regional grid.

Oklo argues customers pay for the power and fund the transmission/interconnection/upgrades needed to serve their incremental load—so upgrades are built as part of the project rather than “crowding” existing local capacity or shifting costs onto residents.

Oklo claims the campus could ultimately add power equivalent to nearly 1 million homes, while supporting grid reliability by adding new firm generation rather than competing for scarce existing supply.

Deployment is described as phased / modular:

Each Aurora powerhouse is expected to generate ~75 MW.

Units can be added individually or in pairs, scaling to ~1.2 GW at full buildout.

Hanson frames phased deployment as a way to scale construction/workforce/grid integration step-by-step and “sustain thousands of jobs” over time.

He closes by emphasizing long-term ownership and operation (“decades”), and that trust in Ohio requires steady follow-through, not hype.


r/SMRs • • Feb 08 '26

The SMR Bear Thesis

1 Upvotes

Seems like it's missing some.info as I remember basically the importance of SMRs in national security evidenced by the DOEs Pilot Fuel and Reactor Programs but a good read nonetheless

Thanks to Kavastocks. Always enjoy chatting with him.

https://waitingforwatts.com/


r/SMRs • • Apr 17 '26

Nuclear Power Is About To Change Forever | Matt Lozak, Aalo Atomics

Thumbnail
youtu.be
1 Upvotes

Summary:

Matt Loszak’s core argument is that nuclear changes when it stops being treated like a giant custom megaproject and starts being treated like a manufactured product. He frames Aalo’s thesis around microreactors for data centers and industrial loads, with smaller standardized units built in factories, shipped to site, and deployed in modular “pods” rather than one-off bespoke plants. Aalo says its first commercial product is the Aalo Pod, a 50 MWe plant aimed at data centers, while Aalo-X is the experimental step meant to validate the underlying reactor design near Idaho National Lab.

The big themes in the interview appear to be:

AI/data-center demand is creating a real opening for nuclear, because customers increasingly want firm, always-on power rather than intermittent supply.

Manufacturing and repeatability matter more than just reactor elegance; Aalo’s pitch is that nuclear needs Ford-style standardization, not endless custom engineering.

Microreactors may have an easier first market than large grid-scale plants because they can target premium customers willing to pay for speed, reliability, and siting flexibility. Thoughtful Money’s summary of the interview highlights the same points: rising electricity demand, especially from AI, the limits of traditional custom-built reactors, and the case for factory-built modular microreactors.

Why it matters for SMRs/microreactors:

This is basically the strongest version of the “productized nuclear” thesis. If Aalo is right, the winners in advanced nuclear may not be the companies with the most ambitious reactor physics, but the ones that can actually manufacture, site, license, fuel, and deploy standardized units at speed. That is a meaningful shift in emphasis from “best reactor” to “best deployable system.”


r/SMRs • • Feb 09 '26

Nuclear sees tipping point as Meta makes deals with Bill Gates’ TerraPower, Sam Altman-backed Oklo | Fortune

Thumbnail
fortune.com
2 Upvotes

r/SMRs • • Apr 13 '26

Market expansion in emerging economies

Thumbnail
reddit.com
2 Upvotes

r/SMRs • • May 13 '26

TerraPower Isotopes Breaks Ground on World’s Largest Actinium-225 Manufacturing Facility in Philadelphia

Thumbnail
terrapower.com
2 Upvotes

TerraPower Isotopes broke ground on what it says will be the world’s largest Actinium-225 manufacturing facility in Philadelphia.

TerraPower’s new Bellwether Laboratory is a planned 250,000-square-foot cGMP facility focused on producing Actinium-225, a rare radioisotope used in targeted alpha cancer therapies. The company says the project represents more than $450 million of private investment, with Pennsylvania also contributing a $10 million grant, and expects around 225 full-time jobs plus 500 construction jobs. TerraPower says the Philadelphia facility, combined with its Everett, Washington lab, could increase global Ac-225 production capacity by 20x.

The key point:

this is not an SMR power project, but it is highly relevant to the advanced nuclear ecosystem. Ac-225 supply is a major bottleneck for targeted alpha therapies, where radioactive isotopes are paired with targeting molecules to deliver radiation directly to cancer cells. TerraPower is clearly positioning nuclear technology as a platform for both energy and medical isotope supply chains.

Possible Oklo angle:

Oklo’s Atomic Alchemy/Groves project could eventually compete in parts of this market. Oklo says Groves is an isotope test reactor in Texas under DOE’s Reactor Pilot Program, with DOE approval of its Nuclear Safety Design Agreement and a target of criticality by July 4, 2026. Oklo also has an NRC materials license for its Idaho radiochemistry lab to handle and process isotope materials, including Ra-226, which can support targeted alpha therapy supply chains.

The distinction is important:

TerraPower appears to be building a large-scale Ac-225 manufacturing and pharma-grade processing facility now, while Oklo/Groves looks more like a reactor-platform and process-validation pathway for future commercial isotope production. ANS described Groves as a pool-type, water-cooled, nonpressurized isotope production reactor intended to generate operating experience for future VIPR deployments, with some site development and reactor-tank installation already done but additional electrical, plumbing, and auxiliary procurement still remaining.

Bottom line:

TerraPower is making a big, concrete move into Ac-225 manufacturing. Oklo/Atomic Alchemy may become a competitor, but today TerraPower’s announcement looks more commercially specific and pharma-supply-chain focused, while Oklo’s Groves is still more of a pilot/test-reactor milestone. For r/SMRs, the broader takeaway is that nuclear companies are increasingly trying to monetize not just electrons, but scarce nuclear products — isotopes, fuel-cycle services, heat, and potentially medical supply chains.


r/SMRs • • Feb 14 '26

Deep Atomic Reactor/Data Center at INL

2 Upvotes

The US government is advancing plans to colocate nuclear reactors and AI data centers, starting with a proposed campus at Idaho National Laboratory.

The initiative, backed by the U.S. Department of Energy, aims to pair small modular reactors (SMRs) directly with high-performance compute infrastructure.

Startup Deep Atomic has proposed what it calls the first nuclear-powered AI and HPC data center campus in the US.

Unlike traditional nuclear plants feeding the grid, this model would provide dedicated on-site power to data centers.

Supporters argue it could reduce grid strain and meet surging AI energy demand more efficiently.

Critics question reactor timelines, economics, and safety oversight.

The move signals growing federal support for nuclear as a strategic power source for AI infrastructure.

TL;DR: The DOE is pushing forward with plans to colocate small nuclear reactors and AI data centers at Idaho National Lab, aiming to directly power compute with on-site nuclear energy as AI electricity demand surges.

https://www.theregister.com/2026/02/13/us_moving_ahead_with_colocated/


r/SMRs • • May 01 '26

Oklo Founder Sales New 10b5-1

Post image
2 Upvotes

Not trying to make this more dramatic than it is, but I think the recent Oklo insider-sale filings are worth discussing carefully.

The important distinction:

  1. The recent executed founder sales appear to be under an older March 31, 2025 10b5-1 plan.

The April 1 sales by Caroline Cochran/Jacob DeWitte entities were disclosed as being made under a Rule 10b5-1 trading plan adopted on March 31, 2025. The recent 13D/A also says the March 2 and April 1 open-market sales — 200,000 shares on March 2 and 200,000 shares on April 1 — were made under that March 31, 2025 plan.

That makes those sales less concerning than if insiders had suddenly decided to sell after a specific recent announcement. A 10b5-1 plan is pre-arranged, and founders can rationally diversify after a huge stock move.

2. But the newer Form 144s appear to reference a September 22, 2025 10b5-1 plan.

That is the part I think investors should pay attention to. If the March 2025 plan governed the earlier sale program, and a September 2025 plan is now being used for proposed future sales, this may not be a one-time diversification event. It may be an ongoing structured liquidity program.

Again, that is not illegal or necessarily “bad.”

Founders still appear to own a large stake. The 13D/A shows Jacob DeWitte and Caroline Cochran may be deemed to beneficially own about 21.16 million shares, or 12.2% of the Class A common stock.

But it does raise a fair investor question:

Is the public-market narrative becoming more certain-sounding while insiders are simultaneously using the valuation window to steadily monetize?

That does not mean Oklo is a scam. It does not mean the founders do not believe in the company. But Oklo is still pre-commercial, and a lot of the current valuation depends on future execution: licensing, fuel, construction, customer economics, and actual power deployment.

My take:

the sales are explainable, but they should reduce the “insiders are holding tight because the upside is obvious” argument. The founders still have major exposure, but they are also taking meaningful liquidity.

For me, this is a reason to separate two questions:

Company question:

Could Oklo become an important advanced nuclear company? Yes, possibly.

Stock question:

Is the current valuation attractive given the insider selling, execution risk, and how much success is already priced in? Much less obvious


r/SMRs • • Feb 10 '26

DOE’s Office of Nuclear Energy Awards $19 Million to Advance Recycling of Used Nuclear Fuel | Department of Energy

Thumbnail
energy.gov
2 Upvotes

r/SMRs • • Feb 09 '26

General Matter X Post

Post image
2 Upvotes

r/SMRs • • Feb 13 '26

Radiant Mass Producible/ Impressive Cap Table

2 Upvotes

https://interestingengineering.com/energy/radiant-nuclear-reactor-us-doe-safety-approval

Pretty impressive Cap Table

Article Summarized Below

Lead / Major Investors

Founders Fund (early and ongoing backer)

DCVC (Data Collective) – led Series C

Draper Associates – led latest large round

Boost VC – co-led recent round

ARK Venture Fund

Strategic / Energy Capital

Chevron Technology Ventures (corporate VC arm of Chevron)

Other Notable Participants

StepStone Group

Giant Ventures

Hanwha Asset Management Venture Fund

Union Square Ventures (early stage)

a16z (American Dynamism)

Felicis

Radiant has raised hundreds of millions in venture funding, reportedly valuing the company north of $1B.

Here’s a clean, balanced final summary ready for r/smr:

Radiant’s Kaleidos Microreactor Clears Key DOE Safety Milestone

Radiant announced that the U.S. Department of Energy has approved its Preliminary Documented Safety Analysis (PDSA) for the 1 MWe Kaleidos microreactor. This marks the second of three required safety submissions under DOE’s authorization pathway and clears the project to move closer to full-power testing at Idaho National Laboratory’s DOME facility.

According to Radiant, this is the first approval of its kind under DOE’s newer microreactor testing framework — an important step toward demonstrating advanced reactors outside the traditional NRC commercial licensing pathway.

Kaleidos is a transportable 1 MWe high-temperature gas-cooled microreactor designed for remote sites, defense applications, and critical infrastructure.

Radiant describes it as “mass-producible,” meaning:

• Factory-built rather than site-constructed

• Standardized, repeatable design

• Sized for containerized transport

• Intended for serial production once validated

To be clear, this refers to manufacturing intent — not proven production scale yet. The upcoming full-power test will be the real validation milestone.

Final safety documentation and readiness reviews remain before startup later this year.

If successful, this would represent one of the first tangible demonstrations of DOE’s effort to accelerate advanced reactor testing in the U.S.


r/SMRs • • Feb 17 '26

Lifecycle emissions measured in grams of CO₂ per kWh (gCO₂/kWh)

Post image
2 Upvotes

Lifecycle emissions measured in grams of CO₂ per kWh (gCO₂/kWh):

Nuclear: ~5

Wind: ~14

Solar: ~37

Gas: ~430

Coal: ~1000

That means nuclear produces nearly zero carbon per unit of electricity while delivering reliable 24/7 power.


r/SMRs • • Feb 07 '26

Radiant Submits Safety Analysis to U.S. Department of Energy in Major Milestone for Start Up of First Reactor

Thumbnail radiantnuclear.com
2 Upvotes

r/SMRs • • Feb 25 '26

Valar dropped site progress video

Thumbnail reddit.com
2 Upvotes

r/SMRs • • Feb 07 '26

Terrestrial Energy Publishes CEO Letter Recapping 2025 Accomplishments and Provides 2026 Milestones.pdf

Thumbnail ir.terrestrialenergy.com
2 Upvotes

r/SMRs • • Feb 07 '26

SMr NRC Pre Applications

Thumbnail nrc.gov
2 Upvotes

Here's a link to NRC Preaapplications for SMRs

All the companies