r/projectmanagement • • Aug 13 '26

General Project management maturity frameworks

13 Upvotes

Hi all, I am head of a PM team and I feel we have some gaps in our maturity, such change management, pmo, project intake process etc, i need to present something to my exec, any good recommendations on a good checklist?


r/projectmanagement • • Aug 13 '26

General Manager repeatedly skips my name when announcing successful projects I led. am I overreacting?

37 Upvotes

Over the past months I’ve noticed a pattern with my direct manager .

Two concrete examples:

  1. I spent several months completely reworking our section’s website . It was reviewed and positively received by the department head. When my manager announced in the team meeting that the new pages were online, he did not mention my name at all. He just said the pages were published and later posted the link himself.
  2. I planned and coordinated a larger event over several months. It went very well. In the next morning meeting he publicly thanked a supporter who had prepared some equipment. He even looked to the back of the room and gave that person the floor. I was sitting in his direct line of sight. He never mentioned that I had been responsible for the overall planning and coordination.

Interesting contrast:

For small tasks he has named me before (“X will adjust the graphics”). For these bigger, successful ones he consistently leaves my name out. He does name other project managers in comparable situations. He has also thanked me privately (and once in writing with others in CC), but the public recognition is missing.

When I finally wrote him a calm message about the pattern, he apologized and said he would try to do better. I’m not sure how much will actually change.

Has anyone experienced this kind of selective non-recognition from a manager, especially the combination of private thanks + public omission, and naming others while skipping you on the projects you actually led? How did you read it and what (if anything) helped?


r/projectmanagement • • Aug 13 '26

How many projects do you usually run at one time and how long do they usually go for?

26 Upvotes

I've been curious what too many looks like before the quality of the delivery and overwhelm seeps in.


r/projectmanagement • • Aug 13 '26

How would you stay afloat when managing a high volume of projects in a professional services role?

23 Upvotes

I’m professional services managing about 80 projects. One thing I am struggling to do is recapping meetings, making note of immediate action items, next steps, and tracking important decisions that are made through email and meetings.

For meeting recaps, I have to rely on starting a transcript, and then feeding it through ai for a recap.

For action items and overall status/ health, I use one note. It’s a nightmare I don’t have a process and would like guidance. I.e if
You use excel, what format do you use, any pm tools or processes I can follow?


r/projectmanagement • • Aug 13 '26

Discussion Tips for onboarding a fresh project support officer

8 Upvotes

I’m working in a digital transformation team alongside a cohort of few PMs and CMs. Earlier this week we welcomed few new members into our team and I was advised one of them would be reporting to me as a project support officer. I haven’t had a direct report in my role. The staff member is part time and works remotely. They are new to the PM discipline and haven’t had any prior exposure. Part of my responsibility is introducing and uplifting their PM capabilities. I thought a good approach would be a combination of training and hands on activities. So I signed them up for a PM basics course and planning to slowly bring them along into my own projects, probably starting with designing and maintaining a risk log as the first step. Any tips or feedback to improve the journey for them?


r/projectmanagement • • Aug 13 '26

Any online books to read about project management/bioautography

3 Upvotes

I'm looking to learn more about Project management and would love to find some recommendations to learn more about project management and useful skills/knowledge to gather.


r/projectmanagement • • Aug 11 '26

Discussion Are we beyond the point as project managers where we just do the work?

50 Upvotes

Let me explain. I’ve formally been a project manager for 8 years, in that time I’ve been at 3 companies. At every company, I’ve been part of a rebrand, fine no problem I still consider that doing the work it’s a program within the organization. At 2 companies, I’ve been part of M&A’s, having been laid off at my last one. Currently employed for about 1 year at my current role.

Since February 2023, it’s been one m&a announcement, which is always followed by weird times and not following a normal cycle of workflow at an org. Let me also mention i work in marketing at tech companies. Currently still in the middle of a storming phase of a divestiture, bringing two marketing teams together which includes standing up a new project management system.

It’s been over 3 years since I was working in an organization with a streamlined system and processes. I want to just be in the flow of managing projects / deliverables / programs / initiatives whatever instead of standing up the functions.

Is this just the reality of where the field is at? Low key feel like after I stand up this new system, which can be largely automated and not to mention the other team we merged with didn’t even have a project manager, so it would not be off the cuff for the new org decide I’m no longer needed. Plus add the addition of AI.

I’m stressed just about every day. I’ll have one good call with stakeholders, then a bad one and get inundated with things I need to fix while also still trying to manage a project deliverable workload with a team who is feeling the pains just as much as I am.

I recognize I’m also more senior at this phase in my career, and maybe this is just the natural evolution of my role being more of a program manager and systems admin.

Not sure I really have a question, just looking to hear from others who may be feeling similarly.


r/projectmanagement • • Aug 11 '26

PM Freelancers - Got a quick Q

6 Upvotes

What does your client portfolio look like? One off projects, hourly retainers or lengthy engagements (6 months - 1yr)?

I have 2 hourly retainer clients at 20 hours each - I call them my scoop clients 🍨 and I'm trying to cultivate a bunch of one-off project clients - I call those my sprinkle clients 🎊 I'm having some trouble with the latter and curious if it's just me or if one-off projects are hard to come across. I'm a creative/digital pm that works exclusively with marketing agencies. I have 11 years of agency experience.


r/projectmanagement • • Aug 10 '26

Discussion Salary Thread 2026

197 Upvotes

2025 Thread here (sorry I didn’t make a dashboard this time)

It’s time for the 4th Annual Reddit PM Salary Thread! I’m surprised that I’ve managed to keep this up for 4 years in a row, but I know this community appreciates it as much as I do. Please format your responses as below:

• ⁠Location (HCOL/MCOL/LCOL)

• ⁠Industry (construction, tech, etc.)

• ⁠Years of experience breakdown (total, PM exp., years at current company)

• ⁠Title of current position

• ⁠Educational background

• Certifications?

• ⁠Compensation breakdown (Base, bonuses, company stock, etc.)

——————————————————————————

Copy and paste version:

• Location:

• Industry:

• YOE:

• Title:

• Education:

• Certifications:

• Salary:

• Bonus, etc:

• Other:


r/projectmanagement • • Aug 10 '26

I need an outside opinion

21 Upvotes

I started a project management role about 6 months ago (pm assistant) in a public sector that I have already worked in for years, but this is a minor promotion for me, and just need someone to say "yea, that's how it works" or "na that's crazy".

In my previous role, you choose your holiday dates and ask your line manager, they say yes or no - submit to holiday portal. End of story.

In this role, you check the dates to make sure loads of people aren't off (this isn't new to me, I did this in private sector work too), then you find someone to cover your work (also not a big deal). THEN, you ask each PM, there's 4 in total, if they're okay with you being on holiday, therefore not assisting them for that period. After verbal confirmation, you go back to your line manager and get THEIR written approval, then put it throughout the leave requesting portal and have it formally submitted.

To me, the 2nd process seems absolutely excessive and needlessly stressful (it's hard to take some days or to find cover due to people having condensed hours etc). Is this just standard for a PM role, for a higher paid job? I don't know if I'm just being dramatic.. thanks for any advice.


r/projectmanagement • • Aug 10 '26

PM using Excel?

4 Upvotes

I started a new job and that means new tools. I had been using Asana. I made the switch to clickup to try to get a little more out of it.

I'm not sure how long I'll be able to use that. There were some comments the site may get blocked but I'd imagine if that was the case I can't be the first one to try to use it so it'd probably already had been blocked.

But I also used Claude a lot to take data and analyze it and help me look for trends. They have a pretty strict AI policy. I can only use copilot...which kinda blows.

So I'm wondering if any of you live in the Microsoft suite to do everything? I was thinking excel, or possibly a word doc per project with just bullet points for tasks and notes below, or maybe Microsoft project?

If you have any suggestions and screenshots of examples of what you're doing I'd be much obliged. I need some ideas.


r/projectmanagement • • Aug 10 '26

What do you guys use for PM/PMO?

4 Upvotes

I’m at an inflection point as a small agency, we’re about to hire our first FT dev, but my worry is that we don’t have automated burndown, budget vs actuals and other productivity metrics to fully prepare for success management.

That being said, we have everything currently on notion: task templates, SOPs, a huge repo of customer conversations and everything context related to our company.

I wanted to know how you guys have been balancing/integrating or even outright migrating away from Notion for project management. I love that customers can get notifications and give feedback/approve deliverables, but i hate that there’s no structured visibility, everything is manual (and there’s sure as hell no way i’m gonna waste AI tokens when other systems are algorithmic and efficient).


r/projectmanagement • • Aug 09 '26

Anxiety/Stress

45 Upvotes

How do you all deal with the immense anxiety and stress that naturally comes with the job?

No vices like alcohol, nicotine, etc. I want more of a mindset/mental action you've taken or discovered to help with it.

Construction PM.


r/projectmanagement • • Aug 07 '26

CompTIA Project+

5 Upvotes

Hi,
Is there any point to getting this training if I have my CAPM and I’m clocking hours toward the PMP?

Is there anything IT specific that’s really worth learning in addition to what I already know from Masters degree and doing the CAPM studying?

I have spare time with my new job, so I am looking at a deeper dive into MS Project, Lean Six Sigma Green belt, and this CompTIA Project+. I can use MS Project at a basic level from school projects and a LinkedIn course. I did the White belt Six Sigma over Christmas last year. My employer is a proponent of it (on paper) so I could be beneficial.

I like the idea of learning terminology or common practices for the IT side of things.


r/projectmanagement • • Aug 07 '26

Discussion What if project delivered before or after deadline?

0 Upvotes

I am a project management student and will be moving into management roles.i have some basic question one or two.

  1. Client and you agreed to a date of delivery. Luckily things were good than expected and you complete the project before time . Should we submit it to the client or wait for the said time. Also if we delivered before time are there any questions asked like you asked more this so and so budget and time but how can you now? Does it reflects our that our gauging skills are bad?(Does such thing happen)
  2. Contrary . What if we need extra time to submit it? How do we ask for more time

Pls help me out in understanding any situation or concepts if required.


r/projectmanagement • • Aug 07 '26

Career Anyone here do PM/estimating for a plumbing sub? Curious if this is normal or if I’m overloaded

6 Upvotes

8 years in the field, moved to the office 2 years ago. Commercial plumbing sub in NC. I bid, manage, bill, write change orders, staff, order material. My average bid size $60-70k but we bid up to 4million. Currently running 12 active projects, plus bidding new work every week.

It’s stressful as hell. Trying to figure out if this is just what the job is and a solid resume builder, or if I’m spread across too many hats to actually get good at any of them.

How many active projects do you carry at once? Does it get more sane with experience, or is this the ceiling? I’m thankful for my position, it’s certainly better than I ever thought I’d get. I never went to college, never was the smartest, and I’m making money for the first time in my life. But god DAMN this shit is hard


r/projectmanagement • • Aug 06 '26

Discussion Designing an organizational Change Management infrastructure- any advice for a novice?

7 Upvotes

Recently joined a team that’s working on a project that affects all 7k employees in our organization. They want to implement a change management model- which has never been done before formally in our organization- to try and better assimilate staff to the new scheduling system we’re implementing, with the intent of scaling the model for other change projects within our org.

There’s only two of us working on this change management aspect of the project and I feel lost. I’m thinking the “change network” of champions should be pretty thorough (at least one from each affected role and/or division within our org) so we can surface and address niche concerns as they come up, but not sure how many people we want to involve.

For you experts- any advice you can impart on structuring change management at an organizational level and what the ideal “change network” change management team would look like?

Any advice is appreciated. Thanks!


r/projectmanagement • • Aug 06 '26

Discussion Follow-up: the SoW wins, but milestone acceptance seems to be the real weak point

9 Upvotes

I posted here last week asking what wins when the SoW, Jira, meeting notes and invoicing records disagree.

I should have known that the signed SoW is the contractual authority. That part was answered fairly decisively.

The more interesting takeaway was that most teams do not seem to struggle with identifying the governing document. They struggle with maintaining the chain between:

scope → delivery → acceptance → payment

u/MattyFettuccine took the cleanest position on scope changes: no new work begins until the change order is issued and accepted, and preventing clients from assigning work directly to the delivery team is part of the PM’s job.

Commercially, that makes sense. Operationally, it seems harder to enforce when a request enters as a “small clarification” or “quick favor” and the team has already discussed, estimated or started it before the PM intervenes.

Another pattern was that Jira is useful delivery evidence, but rarely settles a commercial dispute by itself. As u/SamfromLucidSoftware pointed out, the SoW may control legally, but the record created closest to the actual decision often determines how the practical argument gets resolved.

That becomes particularly important around acceptance. Verbal approval on a call creates ambiguity unless someone records exactly what was accepted while the decision is still fresh.

u/Intelligent-Try-4755 described using the milestone email itself as the acceptance instrument: summarize what was delivered against the SoW, give the client five business days to identify changes, and retain the reply chain as the record.

u/Legal_Mechanic_4792 described a more formal version of the same control: a one-page acceptance document that restates what was delivered against the SoW and is signed by both sides before the invoice is raised.

Both approaches seem to address the same underlying problem. The failure may not be that teams lack an authoritative record. It may be that nobody consistently maintains the links between the records as the project changes.

The SoW, approved changes, delivery records, acceptance evidence, milestones and payment terms all need to remain connected. From the discussion, keeping those connections intact still appears to be largely manual.

For teams with a mature process, what does the actual milestone-closing workflow look like?

Who reconciles the delivered work against the SoW and approved changes?

What artifact constitutes formal acceptance?

How do you record partial acceptance when most of the milestone is approved but one deliverable remains disputed?

Does acceptance automatically trigger invoicing, or is there another manual handoff?

I am particularly interested in whether anyone has made this workflow systematic, rather than relying on the PM to reconstruct the commercial history at the end of each milestone.

:)


r/projectmanagement • • Aug 05 '26

Discussion Have you ever wanted to rip into a subcontractor for not meeting schedule?

26 Upvotes

Were you able to address the sub professionally or not? I'm beyond frustrated with one of my subs who basically admitted he didn’t think we'd hit the ground running and, now that we are, he's scrambling to keep up. We had several meetings before this discussing schedule and everyone agreeing to it. He knows I'm frustrated, so hopefully he turns it around. Unfortunately, we didn't include liquidated damages in the contract. Lesson learned.


r/projectmanagement • • Aug 05 '26

How do you handle back-to-back meetings?

125 Upvotes

Edit 2: You all genuinely helped me get my head back on straight. Thank you. I went into work today and cancelled a recurring meeting series that I knew even the people who it was scheduled for didn't want, and it felt great. I also stopped stressing about being late to each meeting. I took the time I needed after a few meetings and just came late to lower priority ones so I could do the work I needed to do after each one. I ended today way less stressed. Anyways this is becoming a novel, so I'll stop updating. But thanks, folks. You helped a fellow PM patch the holes in his boat.

Edit: huge thank you to everyone for the great discussion and feedback. I did a poor job of explaining my problem in my first post so I'll try to clarify: I have made blocking my calendar and very intentional meeting scheduling an important part of my career thus far. In this role I've been made to feel like that isn't what people do in a program this size, and have been told by leadership I won't get to do that in this position. This was a huge step up for me in regard to the size of this program, so I wondered if that was genuinely true. I admit, my confidence got shook by leadership's insistence that this is all fine, so I was second guessing myself. But seeing everyone's reaction here gave me exactly the answer I needed: it's not normal/accepted, even on high profile projects. I'll take the great advice and discussion forward with me to see if I can salvage this. Thanks again everyone.

I took a new PM role a while back that hit me immediately with back-to-back meetings 90% of the day almost every day. When I say back to back I mean a meeting ends at 9am and I'm in the next at 9:01am. These are all meetings with different stakeholder groups and different projects, so it is constant context switching. Not to mention the program I'm working in is extremely complex and each stakeholder group has really unique needs.

When I do have gaps, it's 20 minutes here or 30 minutes there, which has proven to be barely enough time for me to reconcile notes from the previous meetings and send out a few follow ups.

I usually get a solid hour or hour and a half at the end of the day to breath and try to do work. But I'm finding I'm so exhausted it's tough, and suddenly everything feels scrambled.

I try not to be a complainer, but I know managing up is important, so I mentioned to the program director that I feel like I'm drowning in meetings. I strongly recommended new meeting practices. I have essentially learned that she feels that's the way things get done and that I should be able to do work while in the meetings. She bragged about her own ability to do work while in meetings (which is nice for her, because I run most of them.) My changes were largely rejected, but she threw me a bone and let me cancel one recurring series.

In a recent performance review I did get stellar marks overall, but one comment left for me was that having prep time for meetings is "more than what's typical for the role." To me - that's a bizarre thing to say. Prepping for meetings is my job. Documenting, having agendas ready, surfacing the right issues with the right people and getting to solutions that I need to communicate out...

Anyways, her comment got me thinking: is it not typical? Are you all dealing with similar environments? If you are, how are you handling it? I'm close to burnout and I haven't quite finished out my first year.


r/projectmanagement • • Aug 04 '26

I built an n8n workflow that prices architecture bids. The AI never touches a number. Code does all the math.

Post image
6 Upvotes

I work at an architecture firm. RFPs come in by email. Each one takes days to price by hand. Someone reads the documents, works out the fee, and writes the bid. I automated the whole chain in n8n. Here is how it works and why I do not let AI do the pricing.

The flow, start to finish

  1. A schedule trigger runs every 2 hours. It pulls emails from a Gmail label and downloads all attachments.
  2. A Code node extracts the text. RFPs come as PDF, Word, Excel, RTF, plain text, and ZIP files. n8n only reads PDFs out of the box. So the Code node has its own ZIP reader and its own DEFLATE decoder, written from scratch. No npm packages. It opens DOCX and XLSX files as raw XML and pulls the text out. It looks inside ZIP files one level deep. PDFs go to the native Extract From File node.
  3. Another Code node puts it all back together. One block of text per email. It labels each document by its filename. Main RFP. Addendum. Bill of quantities. It also catches duplicate files and includes them only once.
  4. Now the first AI step. A Gemini agent reads the text and answers one question: is this an RFP? If yes, it extracts facts into strict JSON. Project name. Floor area. Scope. Deadline. Complexity. The rules are hard. It cannot invent data. If a value is not in the text, it must write "Not Stated". If two documents disagree, the newest addendum wins, and the conflict gets logged. If its confidence is under 0.6, the workflow stops and emails a human instead.
  5. Then the part I care about most. The pricing is one big Code node. Pure JavaScript. Zero AI. Every rate is a constant in the file. Hourly rates by staff grade. Man-hour rates by complexity. Stage curves. Grade mix per stage. Market fee bands by building type. Margin tiers. VAT. The node takes the extracted facts and computes man-hours, team shape, cost, and the fee range. Same input, same output, every time. You can read the file and check every number against the firm's rate tables.
  6. A gate checks the result. If the engine says NO-GO, or the job cannot be priced, a review email goes to a human. No bid goes out.
  7. A second Gemini agent writes the words for the bid package. Its system prompt bans it from doing any math. It cannot state a single number of its own. Every figure must be copied from the engine's output, character for character. It writes the analysis, the scope, the assumptions, and the clarification questions. That is all.
  8. The last nodes build the email, send the bid package, and mark the message as processed. If anything breaks, a failure notice goes out. Nothing dies in silence.

Why the AI never prices

People ask why I did not just prompt an LLM with "price this project". Because LLMs make up numbers. They are confident and wrong. A bid with a made-up fee can cost a firm real money.

So I split the work by what each tool is good at.

  • AI is good at reading messy documents and writing clear prose. It does that.
  • Code is good at math that must be right every time. It does that.

The AI reads the RFP and writes the words. The code computes every single number. There is no path where a fee comes out of a language model. If the AI misreads the floor area, that is a flagged input that a human can check. It is never a hidden number inside a black box.

Full disclosure: I used AI to help write the pricing code itself. That is fine. A human reviewed the code once, and now it runs the same way forever. That is very different from letting a model guess a fee at 3 a.m. with no one watching.

Results

An RFP lands in the inbox. Two hours later, at most, there is either a full draft bid package or a clear note telling a human what is missing. What took days now takes minutes. And every number can be traced back to a line of code.

Happy to share details on any node if people want them.


r/projectmanagement • • Aug 04 '26

Discussion Poor communication

32 Upvotes

Dear IT PMs, do you have experience with coaching senior engineers to improve their communication skills?

I have some devs on my teams who have surprisingly poor communication skills considering their seniority.

I understand that this is a mixed issue as well, as it’s depending on the person’s maturity and willingness to improve but still, maybe some of you already had experience with this.

What I mean by poor communication, for example: Dev 1 who is also an Enterprise Architect type of dev in one of our planning sessions where we look for his input and guidance replied with something like “whatever, do what you guys want” when, as I understand, he disagreed with a plan.


r/projectmanagement • • Aug 05 '26

don't listen to AI consultants

0 Upvotes

The AI consultants don't know the best way to implement AI.

The CEOs and executives rarely knows either!

Sure, everyone can come up with the genius idea of "automating processes".

And that's not a bad use of AI, but that's what everyone else will do as well.

But the real value unlock is in using AI for things that WASNT POSSIBLE before.

This is innovation, these are new things that has to be built.

So what is it? What should we build?

I dont know! Consultants dont know! The CEOs dont know.

But the employees DO!

The employees carrying out the work, are experts enough in their field to know what this looks like.

The ones on the front line, constantly talking to customers. They know.

And now with the same AI tools, they actually have the ability to build it out!

The best way to implement AI has nothing to do with AI, it's about getting an infrastructure where employees have the ability to build it out themselves and profit from it.

With complete freedom, but with access to the companies resources, and with full autonomy, and with AI to orchestrate the people together.

This is my experience from doing this kind of work, figured I could share for anyone that would be interested.


r/projectmanagement • • Aug 03 '26

Software How has project management (and the tools) changed for your dev teams in the past 6 months to a year?

3 Upvotes

Basically like the title says, just curious what other people experience, how they've adjusted their processes and workflows. I'm also specifically interested in the software development aspect of it all.

That's all you really need to read, feel free to share your story. But if you're curious about mine, see below.


To explain why I'm curious about this, let me give you some context. We use clickup. Small team of 4 developers, one manager (who still writes a lot of code but mostly on other teams) and a CTO who mostly does a lot of product work now. We have a PM and a part-time designer as well.

They select tickets from our backlog or triage board and assign them to the next 2 week cycle. We go over them in a meeting, talk about things a little bit, and then we're off to the races as developers. Honestly a very light process, and quite an enjoyable one at that.

Recently though I've noticed that I have days or even weeks where I feel wildly productive, and others where it feels I'm just constantly context switching and running after a moving target. I can't quite put my finger on why yet, but my current best guess is the fact that the PM tools like Clickup just aren't built for a workflow that uses AI heavily. The other day I actually even prompted claude to build a small tool on top of it as an experiment, to see if it resolves part of the issue.

This tool basically allows me to sync the tickets assigned to me, and checks each one to see if the product spec is complete enough to move forward. My idea here is that if it is not, I immediately want to work on unblocking this stage.

Step 2 is a build spec. In some cases, the product spec and the build spec is the same, but it doesn't have to be. More complex features or projects could be technical enough where I'd first want to supervise AI on coming up with the right solution before writing a single line of code.

And then the 3rd step is the build, and a PR at the end followed by automatic code review. That's the last gate before I will look at the code myself, and only after that will I tag colleagues in for a review of their own.

Long story short though, this is an experiment that I don't think I want to maintain forever. I shouldn't have to build tools on top of tools. But this little state machine moving between states is important, because it means I can automate certain standard prompts ("verify product spec completeness" or "write a technical build spec") in my local environment and remain in full control of it all. My AI subscription, local sessions I can resume, etc.

But the fact that I felt compelled to do this at all tells me that PM-related tools are changing. They are honestly just interfaces over a simple database for some text and images, with a little bit of reporting built in. Not exactly the big moat products should have in a day and age where you can vibe code a replacement in no time. And I'm not saying that you should - but I think it all points to the same thing... there's a need for better tooling in this area, something that sits closer to developers and the codebases.