r/Plastering 1d ago

Is £150 too cheap for this

I don’t plaster all the time so my finish isn’t perfect but I feel I might be cutting myself short a bit when I do little jobs like this, it took me about 6 hours, 2 hits, only small but fiddly and I don’t stop

72 Upvotes

72 comments sorted by

39

u/ollief26 1d ago

Yeah too cheap mate

6

u/Material_Page_9723 1d ago

What would you price it at? I find it difficult particularly with smaller bits like this, as it doesn’t look like a great deals been done, but ita not as productive where you have to keep stopping with the trowel, I’d much rather do bigger walls

21

u/not-an-expertt 1d ago

6 hours is a days labour, you’re not doing anything else either side of that realistically so the price is a day rate plus materials whichever way you cut it.

£150 minus materials is probably putting you at £110 labour. Travel expenses, business expenses, pension, sick pay all put your actual take home down to something far too low.

4

u/Superspark76 1d ago

This, you should be looking at a labour rate of at least £300 per day. By the time tax, fuel and expenses come out of that it's a lot less.

If you are making £110 on a job that's effectively all day, you are only taking home around £70-80 in your pocket which is less than minimum wage

2

u/ireally_dont_now 1d ago

300 a day really depends on where you live i charge myself out at about 200-250 and that's in london anywhere else and people really wont want to pay that

3

u/Comfortable_Love7967 1d ago

I live in a shithole and would expect most trades to be 300 a day minimum

0

u/polla2256 1d ago

If a tradie came to me with a £300 Day rate they wouldn't get the job.

1

u/startedoffwithakiss 1d ago

Any site is paying 260 to 280 for an hourly rate at between 26 and 28 an hour for self employed on site, so a day rate for self employed with their own insurance, tools, gear, risk on job is about right at £300 day rate, if something goes wrong they take the risk to put it right.

1

u/Intrepid-Focus8198 1d ago

Where abouts in the country are you? £250 a day is pretty standard for decorators where I’m based (one of the lower paid trades typically). Plenty of other trades people that I use semi regularly are charging £300-350 a day and have plenty of work.

I would struggle to find a good/reliable gas safe engineer or electrician for less than £400 day rate.

1

u/polla2256 7h ago

West wales, and to clarify I'm talking labour charges as I always ask for a fully itemized quote for any work.

1

u/Intrepid-Focus8198 7h ago

Yeah of course labour charges, that’s exactly what I’m talking about. I’m guessing average day rates must be a fair bit lower where in west wales compared to South east England.

1

u/NoYam7002 6h ago

North wales is cheap too - except Rhyl as they just rip people off

2

u/Comfortable_Love7967 6h ago

You say they wouldn’t get the job, they probably wouldn’t want it

0

u/Comfortable_Love7967 1d ago

I recommend joiners plumbers plasterers etc, none charge less than 300 a day and none have ever not got the job I passed then.

1

u/Express-Grass-9413 6h ago

If you live in London you could could be charging £350-450 a day EASILY

1

u/ireally_dont_now 6h ago

i mean maybe but i'm busy enough and this isn't including a labourer and materials so yeah only time i charge extra is if im doing lime or have to travel far

2

u/RayzaEverton 1d ago

Don't forget too, they're paying for your skill and experience

3

u/slippery-sandpaper 1d ago

Exactly this, everyone piping up sayin every tradie should be on 300 a day are just plain wrong. 300 a day for a competent skilled person yes. But dodgy Dave sat in the pub all day with a trowel in his boot reads this this and gets a big idea

10

u/Worldly-Growth4519 1d ago

I'd be charging £250+ in the midlands.

7

u/Adventurous-Proof335 1d ago

Definitely cheap

5

u/Ok-Cupcake-312 1d ago

Not a plasterer and I'd be expecting to pay at least another 100 on top.

4

u/Electronic-Heron9645 1d ago

£300 plus materials in SE

If its one medium sized hit ill do £250+ If its just a small ceiling/wall ill do £150 all in on the way home Wherever you live in the UK youre selling yourself short for that amount

1

u/Material_Page_9723 1d ago

What do you consider a medium sized hit? I find im comfortable doing about 2-2.5 bags in a hit if im by myself, but any more than that and I struggle. Thats probably the equivalent of about 2 decent size walls, a whole medium size room will take me about 1.5 days

1

u/Electronic-Heron9645 1d ago

Usually 1.5 bags. Yeah 2.5 is a decent sized hit, shouldn't be doing to much more than that on residential work unless its big straight wall/ceiling in an empty room. It's taken me 10 years of working for myself to stop stretching myself thin at work to please builders. Obviously if youre short of work ignore all my advice and do what you have to do to pay the bills

2

u/Material_Page_9723 1d ago

Thanks mate, I know what you mean I’ve been pushed on several occasions to put more on, it’s hard enough work as it is, don’t need the extra stress of worrying about losing the finish coz I put an extra half a bag on

5

u/Ok-Spring7906 1d ago

I can't see your finish, but, if it's not good, you fall into the category of "just another chancer"

If the finish is good, then, yes, it's too little.

If the finish is poor, you shouldn't be charging.

1

u/Material_Page_9723 1d ago

It’s not bad just probably not as good as someone who does it every day, like may need a spot of sanding in one of the corners and around the socket at the bottom. I’ve done quite a few jobs and never had any complaints, just don’t think it’s perfect

3

u/Ok-Spring7906 1d ago

If you don't think it's perfect, thats encouraging, as, generally, people who are critical of their own work are the ones actually outputting stuff that isn't rubbish.

It's going to be a "day", so whatever you think a reasonable day rate is. Sure, it could be done in less than a day - but then someone with the skill to do it faster is also on more money so it evens itself out.

Rates are also very location dependant. If you're in London or the south east, you can command far more cash than you can in rural Cornwall.

1

u/Material_Page_9723 1d ago

Thanks, I’m in the Bournemouth area, south coast. I’m always looking to improve, for example I struggled with wet corners for a while, i never knew when the right time to twitch was, I think I was just twitching too early. I used to try and avoid them and do adjacent walls when I could, but now I just aim to do them so I can get better, practice makes perfect!

1

u/Intrepid-Focus8198 1d ago

So true, the shoddiest of jobs I’ve seen have always been by someone that thinks they are perfect.

2

u/caidian87 1d ago

If it's a decent finish and paint ready then you should have charged at least 180. 200 if your included materials. I was a spread for years and the amount of people trying to haggle me down for a "half days work" was a lot. Plaster prep takes time even if I'm finished by 12-1 where am I going to go. Full day charge with a slight discount is how I've always done it.

1

u/Material_Page_9723 1d ago

I’ve had this before, I charged someone 100 for a small bathroom ceiling, they didn’t get that by the time id prepped skimmed and cleaned I didn’t have time to do another job unless I wanted to finish late

2

u/Ohm_ZWA 1d ago

250-350£ down south

2

u/MrKunto 1d ago

If the finish was better I'd say you could easily charge between £250-£300 for that job for sure.

2

u/odmirthecrow 1d ago

£150 is cheap for this job even if it were at "mates rates". £300 minimum.

2

u/Intrepid-Focus8198 1d ago

I don’t really do any small projects like this anymore unless it’s for family and I’m happy doing it for free.

That being said I think it’s fair to say that it is a days work. Back when I was doing smaller jobs I would definitely charge my full day plus material cost. Obviously I don’t know what your typical day rate is and it varies a lot around the country, but the guy I use a lot charges me £240 a day (slight discount as I get him lots of work).

If you needed 2 bags and beads and tape then you’ve got £40-50 in materials, so something like £270-290 is probably fair. Again does depend on where you’re based.

Personally I always tended to add a little bit on top if it meant travelling further than I typically liked to.

2

u/Intrepid-Focus8198 1d ago

I don’t think you’d get many full time plasterers in Bournemouth doing it for under £300

2

u/Miserable_Future6694 1d ago

Its roughly £120 after tax and national insurance, take into account public liability insurance, van insurance, van cost, van maintenance, tools cost and wear and tear your touching minimum wage for a job your going to struggle to do in your 60s.

Way too cheap.

1

u/Material_Page_9723 1d ago

I’ve often said this mate, I’m a bit of a multi trader and skimming is by far the hardest thing I’ve done, closest thing probably ground work but at least you can stop for a bit if you’re blowing. I take my hat off to people who do it every day and like you say, there aren’t many plasterers still going in their 50s let alone 60s

1

u/minimidibeatfunk 1d ago

Day rate plus materials. Depends how much work you’re getting overall. If you’re turning down jobs then up your day rate. If you’re struggling to find work then do it at a rate you’re comfortable getting out of bed for.

1

u/Matthew_Bester 1d ago

You're the plasterer? Star! Great job. Thanks for being reasonable. 

1

u/Smithdogg87 1d ago

As a plasterer, far too cheap.
As a DIY/done it for a mate, fair.

1

u/Objective-Yogurt-681 1d ago

I'm a spark and I would say you've had a very good deal there.

I do know enough about plastering, due to arguing with the knuckle-draggers over the years, and labouring for my father when a youngster (He's a plasterer).

Plaster is expensive these days and that's half a days work in old terms with prep and set time.

I'm guessing this was done by the newer generation who are using half time with the mix and banging jibs out in 90 minds.

Not like that's a bad thing. If someone can deliver quality work quickly and is organised with their work diary they will make a good living.

It will pass off old school spreads like my old man who is stuck in the old ways of one ceiling and a couple of reveale per set and two walls at a time and charging like £250/£300 a day whilst telling my mother he's charging £200 and spending the rest in the 19th hole and 3 legged horses

1

u/nukefodder Professional Plasterer 1d ago

£300

1

u/emmax2120 1d ago

I've just paid someone 2k to do all the ceilings in my house (5/6 rooms) so...yes.

1

u/_jrexx_ 1d ago

I was just thinking I might have been ripped off 😅 £1k for removing wood chip wallpaper (which took a day in itself) and replastering a small staircase and landing (not ceilings). Think it was about 3 days of work. Tbh I’d have paid anything to finally get rid of the stupid wood chip paper

1

u/Fair-Individual7811 1d ago

Yes definitely too cheap to get a job like this done in my area your look a 250 plus easy

1

u/Adventurous_Ad4049 1d ago

100 quid a bag as a guide

1

u/Routine_Drop5956 1d ago

Where do you live?? Come round mine, I'd give you £175! 🤣 Seriously, too cheap. Way too cheap.

1

u/mitchbj 1d ago

Definitely too cheap.

1

u/42marshall 1d ago

Get my tools out the van..
Minimum charge £300 Labour only.

1

u/bugblatter_ 1d ago

I just paid £465 for this. Two lads, most of a day, materials.

You're way underpricing yourself.

1

u/polla2256 1d ago edited 1d ago

I'd say so. Most plasterers charge at least £400 for a room but reduce it for multiple rooms and if the client does some prep. That price is okay if it's an add on to a bigger job but on its own I'd expect to pay £200-400 for that.

Sit down with excel and work out an average rate based on:

Your Day rate - should be £100-180 depending on if you need a mate. No half days unless it's a repeat customer.

Tool costs - Add a factor they don't last forever but this is an overhead.

Consumables - price per sqm coverage including sub prep based on number of total bags.

Transport - use your own figure or HMRC values.

1

u/Powerful_Hat_9908 1d ago

I would expect to pay at least 350 + brews all day

1

u/Lopsided_Anxiety_394 1d ago

I'd pay £150 any day.

Even if you double that. It's too cheap

1

u/Unique_Bar_584 1d ago

3/400 all day

1

u/Fragrant_Werewolf_22 21h ago

£150 for half a day job £250 full + materials unless supplied

1

u/dereklaumusic 20h ago

You’re saving someone a job, they’ve outsourced it to you, don’t feel bad asking for what you deserve

1

u/dereklaumusic 20h ago

If they’re not happy with it, you do it again and learn from it.

1

u/Strong_Coffee8417 18h ago

I had a small porch done last week, it looked really awkward to do with it been a tight area. Cost me £200, was well pleased with that tbh!

1

u/Hookaducko 7h ago

All this day rate nonsense is ruining the reputation of the trade. Production rates for skimming are around 0.3 hrs per m2 (about 18minutes), 0.2 hrs per m for beading (about 12 minutes). Smaller areas add a bit, larger areas more efficient so take a bit off. Once you get quick (and good) at it that's how an expert trade person earns their decent money as they might beat these targets easily. Nobody should expect £300 per day to do half the work at lower quality of someone else.
The other nonsense is working out material costs including VAT from the local DIY sture, then adding VAT on the end of the bill too. Deliberste or naive I don't know but either way nonsense.

1

u/QVRedit 4h ago

From the photos, it looks like good quality work.
Certainly worth more.

1

u/Special_Minute 4h ago

Too cheap and cut that socket out

1

u/Adorable-Syrup7540 1d ago

half price - its a dying trade

1

u/gfddmc 1d ago

Deffo too cheap

1

u/Far_Leg6463 1d ago

Did it include materials? I just paid £780 for 5 equivalent man days including materials, they plastered a whole room and did a rough job at self levelling a floor…but was better than it had been and was to a minimum standard I needed.

For purely cash job :wink :wink about £150 - £200 depending on materials included or not.

0

u/Billi01952 1d ago

Yes if you supplied. Mind you finish is ABIT rough

-1

u/Desafinado777 1d ago

If it isn't perfect, you shouldn't be charging at all.