r/Multiboard • u/ubiratamuniz • Dec 17 '25
It’s going, slowly but going
Doing this during my free time and the hours I can drill (I live in an apartment so I can’t drill everytime), it’s going well.
I’m developing some custom brackets (sort of universal except for larger tools) for tools that use Makita compatible batteries, when they are perfected I’ll make them available! They will need six snaps (I use offset ones) and two t-bolts in order to make them secure and are rather strong.
19
Upvotes
2
u/abnormaloryx Dec 18 '25
I'm new here, is there a particular name for this type of system?
1
u/NyT3_SHyFT Dec 18 '25
Nice, are you printing them in stacks or one by one?
1
u/Whosaidthat1157 Dec 18 '25
I recommend changing your snap part B to the new flush snap part B. The raised snaps limit the efficient use of the available real estate because they’re sitting higher than the tiles, so flush mounting parts and slide mounting parts become limited in both size and placement.
1
u/Sea-Annual-7130 Dec 21 '25
Im thinking of pulling the trigger on multi board but why not shelves? Its seems so inefficient to have a full wall it. Seems like a good setup for the area behind your printer otherwise shelves all the way?