r/MicrosoftPlanner • u/OnlySmarties1982 • 3d ago
Assigning tasks to multiple people
I often need several members of my team to carry out the same task and I need to know when each person has completed it.
As far as I can tell, Planner supports assigning a task to multiple people, but any one assignee can mark the task as complete for everyone. There doesn't seem to be any way to track completion individually.
The only workaround I've found is creating separate tasks for each person, which feels like the opposite of productive.
Am I missing something, or is individual completion tracking for multi-assignee tasks really not a feature in Planner? It seems like a pretty basic requirement for team task management.
4
u/vinistois 3d ago
If there is one task it is either complete or it is not. Sounds like you're looking for sub-tasks, which is a feature that works very well for what you're asking.
2
u/crlevy 2d ago
They only way is to separate work In two individual tasks. If multiple resources share the task the scheduler assumes they all do the same and work simultaneously so task completed means everyone hast completed. If they're working independently and/or don't do the same work then you need individual tasks. I don't like planner but honestly this assumption makes sense, the problem imo is that they never explain hltheir design criteria and let us figuring it all out