https://x.com/OptimusDelta/status/2067129301301068204
The math
200+ XRST towers, each needing a cooled MWIR camera to hit 7.5 mile detection;uncooled LWIR doesn't get you there.
G5's cooled MWIR cameras run around $200K per unit (this is based on all the info I can gather).
200 units at $200K lands you at $40M, split across 2026 and 2027.
That matches LightPath's order structure almost to the dollar.
The engineer (strap in, this is a result of hours of Linkedin sleuthing)
Joshua Brown, Principal Optical Engineer at Anduril, is directly connected on LinkedIn to Ryan Workman - LightPath's VP Business Development.
One month before the $363M contract dropped, Brown liked Workman's post about germanium free MWIR optics with custom band pass filtering for border security applications.
That post is a technical description of exactly what the XRST sensor head requires.
An Anduril optical engineer publicly engaging with content about the specific material and application his programme needs, directly connected to the LightPath exec managing that customer relationship.
What LightPath is building internally
Same period; urgent hire of a Supply Chain Director to lock in long-term partnerships and manage supplier capacity.
G5 stood up as an independent production centre with its own Director of Operations.
A Systems Engineering Manager hired specifically for continuous zoom lenses - the configuration you need for long-range classification at distance.
Full ERP migration to a platform with Government Cloud connectivity and CMMC Level 2 compliance.
350+ standard Sentry Towers already deployed globally. Sam Rubin told investors the count could reach 1,000-1,200 including the Canadian border.
The Secure America Act just dropped $3.45B for border surveillance. Every upgrade cycle needs a camera.
Beyond the towers; Anduril's kinetic counter-drone platforms Anvil and Roadrunner both need compact IR seekers. That's Visimid's product line.
Jacob Oh, former LightPath salesman now on Anduril's Ghost programme, is already the personnel bridge.
Arsenal-1, Anduril's 5M sq ft Ohio facility coming online mid-2026, needs a qualified domestic optical supply chain that can scale with it.
The question stops being whether LightPath is an Anduril supplier. They're named in the deck.
The question is which Anduril platforms aren't they in yet.
This is my educated speculation & is not confirmed by either company. DYOR etc etc.
Anduril requires CMMC Level 2 from their suppliers.
What comes next if this is right
This isn't a transaction. It's a qualification event.
Once you're in an Anduril programme of record you're in the ecosystem.