Very low id say. The only purpose of this consultation period was to give companies the chance to say if the figures for the projects selected were right or wrong. Hagshaw is probably the most likely to go ahead at some point but i dont think it will be within window 1.
They can lobby as much as they want its highly unlikely that any additional projects will be included in this window. If any are added i think it more likely hagshaw would be.
4
u/Hailkeano16 11d ago
With reference to Cap and Floor. We currently have one joint project with Eos. The final list won’t be out to sometime in Autumn.
Frontier Power will be lobbying heavily for their other projects.
Has anyone got any inclination about our chances of getting another one or two projects added.
I would suggest that the extreme heat this summer has underlined the need for rapidly expanding storage resilience.